Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published] · 142007.1173

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Land owner's consent (if appiicabfe)

20.

Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Section 3.2.1(3) of the IPA prescribes that an "i

appiicatlon must contain, of be supported by, the Name Signature Date

written consent of the land owners, if the application . .

involves: (i) Resource Allocation (see

{i} a material change of use; below)

(3) reconfiguration of a tot;

(ii) work on land betow high-water mark 8 notwithina | = [777777 enero enna spawn eer nnennnnr asec c eer aeenaee car aafocccc ess c cs ae
canal as defined under the Coastaf Protection and (ii)
Management Act 1995;or

(iv) work on rail corridor land defined underthe = [Pov r nnn rn rrr nee onsen nner enna ec bennsennenecnaen ceca n acco esc e cee pone cee a
Transport infrastructure Act 1994. (iii)

Section .8.1(2(a) ofthe IPAprovidesthat = ff

landowner’s consent ls not required foramobileor | 9 | enn pe ences css cceeccnscoesonercsescesposessrcsscsss

temporary ERA. {iv)

For more information refertoGuidef, fo eee ee eee eee ee eee eee eb eee eee eee ee eee eee beeen ence eee

(v)

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving

Section 3.2.1(5) of the IPA requires evidence of quay material on State coastal land under the Coastal Protection and Management Act 1995)?

resource entitement be given for applications that

involve a prescribed Stale resource. LINO - goto 024 EX] YES - go to 022

Section 3.2.1(10}{a)(ii) of the IPA prescribes that an + ees . .

application ae oe to be prope made 22. This application is accompanied by evidence: (tick applicable box)

wihout evidence ofthe rescue enilement (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(v)
ice for comy in ee . *, woe . . 5

Refer fo schedule 10 of the Integrated Planning KK (ii) the chief executive of the department administering the resource is satisfied the

Reon 108 tral Een veer evidence development is consistent with an allocation of, or entitlement to, the resource - go

ah to Q23

development application. - . . a. .

O (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go fo Q23

ce for completi 23. Evidence of the resource entitlement:
The i Ht - if evidence i : . . . i: j
ee ede OS oe van ovdenceis (i) Resource entitlement / authority details (vii) Official stamp of the department
Taig Dg a Lok oc oe? Gore >| silng beresouce
Resources, Mines and Water is mandatory where the - Le & Fe _applicable)
application involves any water or riverine quarry :
material under the Water Act 2000.
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be og
completed if the evidence is time limited. ‘$ ie
. CRS
(iv) Signature of delegated officer oe 2
{v) Date Ms
e
(vi) Expiry date of evidence (if applicable)
4 -r2e-oF7

Assessment triggers 24, Is the IDAS Assessment Checklist completed and attached to this application?
tection Poe we Botte rom oui ‘t xX YES oO NO - the assessment manager may refuse to accept this application on the
must be completed for all ather applications. grounds that the application has not been property made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application shou!d be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact.

 

 

 

Plan / Drawing / Report Number Title Date
. Proposal Description (including | 12 April
(i) 00753 L02 HB plans) 2007

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable fo assessment manager's)

DATE

| ree ® 2yCco

RECEIVED

| 's) o/or [mans HS Rese]

eer loz fia |

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published].pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.