2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                          General Committee
                             12 March 2018
                         Attachment 1 to Item 5




ASSET MANAGEMENT PLAN

  Noosa Aquatic Centre




                              March 2018
                             Revision 1.0
Log in to download the original file

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 37 sections

Section 2

Document Owner

Revision    Date           Document Owner                                           Date Approved
 1.0        01/12/17       Asset Planning Manager                                   05/03/18




Document History

Revision    Date           Reviewed By                     Approved By              Date Approved
 1.0        01/12/17       Asset Planning Manager          Asset Planning Manager   05/03/18




Distribution of Copies

Revision          No. of Copies                       Issued to
1st Draft         1 Electronic copy                   Asset Planning Manager




Noosa Council Associated Asset Management Documents

Document                                                Date         Approved By
Strategic Asset Management Plan (SAMP)                  2017         Council
Noosa Council Asset Management Roadmap                  2016         Council

Abbreviations

Abbreviations                 Meaning
AM                            Asset Management
AMP                           Asset Management Plan
CA                            Condition Assessment
ISO                           International Standards Organisation
KPI                           Key Performance Indicators
(LoS)                         Level of Service
NAC                           Noosa Aquatic Centre
NPS                           Net Promoter Surveys
SAMP                          Strategic Asset Management Plan

Proposed Amendments

No      Section      Proposed Amendment




                                                                                               Page 1

Section 3

Contents
EXECUTIVE SUMMARY ...............................................................................................................................3
INTRODUCTION...........................................................................................................................................4
  Asset Management Plan Definition & Purpose ........................................................................................4
    Scope ........................................................................................................................................................4
    Noosa Aquatic Centre Facility ..................................................................................................................5
    NAC Asset Management (AM) Objectives ...............................................................................................6
    Advanced Asset Management ..................................................................................................................6
    Levels of Service ......................................................................................................................................6
    Customer Research and Expectations .....................................................................................................7
    Legislative Requirements .........................................................................................................................7
    Current Levels of Service .........................................................................................................................7
    Measured Levels of Service .....................................................................................................................8
FUTURE DEMAND .......................................................................................................................................9
  Demand Drivers ........................................................................................................................................9
    Demand Impacts on Assets ......................................................................................................................9
LIFECYCLE MANAGEMENT PLAN .......................................................................................................... 10
   Assets .................................................................................................................................................... 10
    Asset Valuation ...................................................................................................................................... 11
    NAC Asset Condition ............................................................................................................................. 11
    NAC Operations ..................................................................................................................................... 13
    NAC Maintenance Plan ......................................................................................................................... 14
    Asset Renewals ..................................................................................................................................... 15
    NAC Renewal Replacement Plan .......................................................................................................... 15
    Capital Upgrades & New Assets ........................................................................................................... 16
    Capitalisation of Assets ......................................................................................................................... 17
    Disposal and Replacement of Assets .................................................................................................... 17
RISK MANAGEMENT PLAN ..................................................................................................................... 18
  Critical Assets ........................................................................................................................................ 18
    Risk Assessment ................................................................................................................................... 18
FINANCIAL SUMMARY ............................................................................................................................. 19
  Financial Statements and Projections ................................................................................................... 19
    Funding Strategies ................................................................................................................................. 19
    Budget Forecasts ................................................................................................................................... 19
PLAN IMPROVEMENT AND MONITORING ............................................................................................. 21
  Status of Asset Management Practices ................................................................................................. 21
    Improvement Program ........................................................................................................................... 21
    Monitoring and Review Processes for the Asset Management Plan .................................................... 22
    Asset Management Effectiveness ......................................................................................................... 22
ANNEX A: NAC Stakeholders .................................................................................................................... 23
ANNEX B: MEASURED LEVELS OF SERVICE ....................................................................................... 24
ANNEX C Asset Condition Rating Matrix................................................................................................... 26
ANNEX D: NAC Asset Maintenance Plan ................................................................................................. 27
ANNEX E: NAC Asset Renewal program .................................................................................................. 31
ANNEX F: NOOSA COUNCIL CRITICALITY MATRIX ............................................................................. 35



                                                                                                                                                        Page 2

Section 4

                                                                                         Noosa Council
                                                                                 Asset Management Plan
                                                                                   Noosa Aquatic Centre

EXECUTIVE SUMMARY
The Noosa Aquatic Centre, located in Sunshine Beach, was constructed in 1999 as a state-of-
the-art multi-fitness facility with a focus on aquatic activities. The facility consists of three separate
pools, a 50-metre heated Olympic-sized pool; 25-metre heated pool and a Learn to Swim (LTS)
Program Pool (20 x 15 metre heated program pool.)
•   The current replacement cost for the NAC is $7,118,910.
•   The overall condition of the assets at the NAC are rated 2-3, (very good to good) based on
    the Asset Condition Matrix.
•   The 19.56 Equivalent Fulltime Employees are supported by a number of casual positions to
    accommodate seasonal and peak demands.
The NAC is operational 363 days of the year. It is critical that the facility is well maintained and
that unplanned outages or closures are avoided wherever possible. To operate at this level, the
pool plant and equipment must be well maintained, and issues rectified promptly.
In September 2015, the NAC introduced a selection of Key Performance Indicators (KPIs).
Depending on data availability, KPIs are monitored either weekly or monthly. The information is
used to track and effectively manage key elements of the service relating to customer demand,
efficient operations and increasing revenue.
In establishing good maintenance and renewal practices, two separate Condition Assessments
(CA) were undertaken. The initial CA covered pool plant and equipment providing a breakdown
of assets and comprehensive condition information. The estimated economic life, asset condition,
repair priorities, expected year of replacement and costs for plant and equipment assets was also
reviewed. The additional CA covered building assets including 50m, 25m, and the Program pool.
The overall condition score of the assessed assets were positioned between a condition 2 (Very
Good) and a condition 3 (Good).
The operations and levels of service are aligned with the objectives of the Noosa Corporate Plan.
A strategy under the Corporate Plan is to enable an active and healthy community. Residents and
visitors of Noosa generally value fitness, climate, and location that lends itself to water activities.
The NAC is, therefore, a significant pillar of the community services provided by Council.




                                                                                                  Page 3

Section 5

                                                                                           Noosa Council
                                                                                   Asset Management Plan
                                                                                     Noosa Aquatic Centre


 INTRODUCTION
 Asset Management Plan Definition & Purpose
 “Documented information that specifies the activities, resources and timescales required for an
 individual asset, or a grouping of assets, to achieve the organization’s asset management
 objectives.”1

 The purpose of the Noosa Aquatic Centre (NAC) asset management plan is to define the whole of
 life activities associated with operating and maintaining an aquatic centre for the Noosa Community.
 The plan identifies the assets and the levels of service to meet the needs of patrons. A key outcome
 of the asset management plan is the identification of the current state of the asset conditions and
 the development of renewal and maintenance plans. Importantly, the identification of future costs
 and potential risks to the assets that support the service for operating an aquatic centre is
 fundamental in achieving the asset management objectives for Noosa Council.

 Scope
 The scope of this asset management plan is to ensure the NAC meets, demonstrates and
 incorporates the following key asset management objectives:
    A description of assets and the services provided;
    Links to Councils long term financial plan through:
     o    An asset renewal program reflecting Council’s Capital Works Program.
     o    A maintenance program.
    Levels of service and demand are identified and determined.
    The assets are identified with a condition.
    Life cycle costs are addressed.
    Long-term cash-flow requirements are forecasted for asset renewals, maintenance and
     operations.
    Asset rationalisation and disposal is addressed.
    The risk management activities associated with the NAC.




1 ISO 55000:2014 (3.3.3) Asset Management – Overview, principles and terminology

                                                                                                  Page 4

Section 6

                                                                                   Noosa Council
                                                                           Asset Management Plan
                                                                             Noosa Aquatic Centre
Noosa Aquatic Centre Facility
The NAC was constructed as a state-of-the-art multi-fitness facility in 1999 for the purpose of
providing aquatic activities to the Noosa Community. It is open daily to the public, between the hours
of 5:30am and 7:00pm on weekdays and 7:00am to 5:00pm on weekends. Patrons are charged a
nominal fee for entry to the facility.
The NAC comprises of the following assets:

   50 metre heated Olympic-sized pool with light towers ;
   25 metre heated pool with light towers;
   20 x 15 metre covered and heated LTS Program Pool that includes a heated toddler pool and a
    heated bubble pool;
   Main Building and Amenities that operates and includes:
    o   Front Counter, Staff Offices and Swim shop;
    o   Large Communal deck area;
    o   Café;
    o   Showers, change rooms and toilets;
    o   Creche;
    o   Fitness studio;
    o   Therapist Offices
    o   Storage rooms
   Manager’s residence;
   Pool Equipment Plant Room;
   Lifeguards Facility;

   Storage Shed;
   Shade structures for the 50 Metre and LTS Program pool;
   On-site BBQ and park furniture; and
   Sealed Carpark.
This asset management plan (AMP) consolidates Councils
available data and analysis on the NAC assets. It also
presents the output of how systematic approaches are
applied by Council to optimally balance cost, risk and
performance. This is essential to meet forecasted demand
and the levels of service required by internal and external
stakeholders. NAC stakeholders are identified in ANNEX A.




                                                                                           Page 5

Section 7

                                                                                  Noosa Council
                                                                          Asset Management Plan
                                                                            Noosa Aquatic Centre
NAC Asset Management (AM) Objectives
The AM objectives detailed in the AMP include:

   A consolidated asset register that identifies:
    o   Asset description;
    o   Asset condition;
    o   Useful life and renewal dates; and
    o   Replacement costs.
   The levels of service provided by the NAC to the Noosa Community;
   Current and future maintenance expenditure;
   Identifying any future demand forecasts for the NAC;
   Identifying any legislative considerations necessary in the management of the NAC;
   Document the financial forecasts for the NAC;
   Identifying all risks and opportunities related to management of the NAC; and
   Documentation of any future actions identified to improve the asset management objectives of
    the NAC.


Advanced Asset Management
It is the aim of Council to further develop the asset management roadmap objectives for the
operations of the NAC. Advanced asset management activities are aligned to the continual
improvement of the current asset management objectivities for the NAC. These include:
   Further implementation of Technology One - asset management system;
   A reconciled asset register with the Financial Register and other independent NAC registers;
   Undertaking more detailed and asset specific condition assessments that are beyond initial
    visual assessments;
   Development of a cyclic asset condition assessment program;
   Regular asset data updates to develop predictive modelling for asset renewals; and the
   Development of longer term renewal plans.


Levels of Service
The levels of service that are currently being maintained by the NAC are aligned to the Corporate
Plan and Branch Plan objectives. The continuous development and implementation of the asset
management objectives that include good asset governance and asset knowledge are also aligned
to the Corporate Plan objectives. Any changes in the levels of service at the NAC will be required to
demonstrate the benefit and approved by Council. Changes in levels of service should be addressed
through the asset management governance framework.




                                                                                          Page 6

Section 8

                                                                                     Noosa Council
                                                                             Asset Management Plan
                                                                               Noosa Aquatic Centre




Customer Research and Expectations
Anecdotal evidence suggests customers are broadly satisfied with the current levels of service
provided by the NAC. Numerous customer satisfaction surveys have returned strong results and
while there will always be isolated pockets of customers who would like higher levels of service, no
major changes to existing service levels are envisaged in the near future. Recent customer
satisfaction Net Promoter Surveys (NPS) completed include the Learn to Swim program, Junior
Squad Program and the Café operations. Within these, it was evident that a common theme for
improved family change rooms was supported.


Legislative Requirements
The legislative requirements relative to the NAC are:

    Queensland Health Swimming and Spa Pool Water Quality and Operational Guidelines;
    Royal Life Saving Society of Australia Guidelines for Safe Pool Operations (GSPOs).


Current Levels of Service
The levels of service provided and operating hours offered to the community are outlined below:
    Season                 Opening Times
    Summer                 Summer (approx. October - April)
                           Monday to Friday: 5:00am - 7:00pm
                           Saturday, Sunday and Public Holidays: 7:00am - 6:00pm
                           Anzac Day: 1:00pm-5:00pm
                           Closed Christmas Day and Good Friday only.
    Winter                 Winter (approx. April - September)
                           Monday to Friday: 5:30am - 7:00pm
                           Saturday, Sunday and Public Holidays: 7:00am - 5:00pm
                                      Table 1 NAC Opening Times

Patrons expect that the NAC be fully operational during these hours, 363 days of the year. It is critical
that the facility is well maintained and that unplanned outages or closures are avoided wherever
possible. The most vital part of achieving this goal is that the pool plant and equipment is well
maintained and that any issues are rectified in a timely manner.



                                                                                             Page 7

Section 9

                                                                                      Noosa Council
                                                                              Asset Management Plan
                                                                                Noosa Aquatic Centre




In September 2015, the NAC introduced a selection of Key Performance Indicators (KPIs). KPIs are
monitored either weekly or monthly, depending on data availability. The information is used to track
and effectively manage key elements of service relating to customer demand, efficient operations
and increasing revenue.


 Key Performance Indicator                                Weekly            Monthly       Target
                                                          Average           Average       Range
                                                                                         (monthly)
 Total number of learn to swim classes                       213               923          >900
 Occupancy rate - swim school/learn to swim                 86%                86%         >80%
 Total number of aqua aerobics classes                       11                48           N/A
 Occupancy rate - aqua aerobics                             73%                73%         >70%
 Total number of circuit classes                             10                43           N/A
 Occupancy rate - circuit sessions                          73%                73%         >70%

 Labour costs a % of revenue                                 N/A             64.08%        <65%

 Performance against YTD budget                              N/A               N/A       Achieve or
                                                                                          exceed.

                            Table 2: NAC KPI's Monitored Weekly & Monthly

Measured Levels of Service
To demonstrate the levels of service at the NAC a table of performance measures have been
developed and are located at Annex B. This table of Measured Levels of Services utilised to inform
NAC staff of their obligations in maintaining the current levels of service. When targets are not
achieved they should be escalated and reported through the Asset Management Governance
Framework.




                                                                                             Page 8

Section 10

                                                                                             Noosa Council
                                                                                     Asset Management Plan
                                                                                       Noosa Aquatic Centre
 FUTURE DEMAND
 Demand Drivers
 There is currently an adhoc approach of demand management being applied to the management of
 the NAC through, the recognition of patron numbers, current programs being offered and customer
 surveys. The KPI’s/targets that have been initiated to assist in monitoring various activities across
 the NAC should act as an indicator to reviewing demand management. It is Council Policy that any
 change in the level of service due to demand is reported to Council in accordance with current
 guidelines and practices.

 It is unlikely that population growth will drive capital upgrade investments for the NAC. Therefore,
 the major driver of capital upgrade investments will be changes in legislative/statutory requirements
 or compliance with WH&S policies. The recent NAC Condition Audit Report 2 for this facility
 highlighted that the non-renewable expenditure was related to compliance.

 In addition, future surveys, that are conducted across the various operations of the facility, will
 identify and act as measuring tools to assess the patron’s expectations. The NAC was constructed
 as a state of the art facility in 1999. Since that time there have been many changes made to the
 original assets in order to maintain and improve the facility.

 Demand Impacts on Assets
 The most significant impact on assets from demand relate to periods of scheduled closures for major
 refurbishment or maintenance works. Closure of lanes and/or pool(s) impact on the many programed
 activities scheduled at the NAC; including any events such as carnivals, training camps or private
 bookings.




2 Roejen Noosa Aquatic Centre Pool Plant Condition & Maintenance Audit August 2016



                                                                                                    Page 9

Section 11

                                                                                   Noosa Council
                                                                           Asset Management Plan
                                                                             Noosa Aquatic Centre
LIFECYCLE MANAGEMENT PLAN
Assets
The Noosa Aquatic Centre was constructed in 1999 and featured:

   50m tiled pool with wet-deck soiled water return systems;
   Free form 20 x 15m LTS Program Pool, complete with a wading and bubble pool area;
   Concrete formed sand filter comprising 8-cells with proprietary multiport auto-flow valve;
   Automated water chemistry monitoring and dosing system;
   Three end-suction water circulation pumps sharing a common discharge manifold;
   Bulk chlorine storage area;
   Two heat-pumps providing water heating.



Additional capital works were undertaken in 2000 to separate the 50m and Program Pools. The new
Program Pool plant included:

   The separation of the soiled water return hydraulics and the fabrication of a dedicated balance
    tank;
   Installation of three vertical sand filters;
   A dedicated water circulation pump;
   An additional water chemistry and control and dosing system;
   A dedicated heat-pump for pool water heating.
A further upgrade was completed in 2006, including the building of an additional 25m pool. This
pool included dedicated filtration, heating and chemical dosing systems. The original bulk chlorine
storage was upgraded to meet the additional disinfection load demands.

In addition to the above, a number of assets have since been acquired, constructed or upgraded
including:

   Construction of shade structures;
   The formalisation of an overflow carpark;
   The upgrade of gym equipment.




                                                                                          Page 10

Section 12

                                                                                    Noosa Council
                                                                            Asset Management Plan
                                                                              Noosa Aquatic Centre
Asset Valuation
The value of the NAC, at the end of the financial year 2016/2017 for the purposes of this AMP is
summarised below:

                           Current Asset Cost         Asset Depreciation     Written Down Value


    Noosa Aquatic          $7,118,910.40              $2,439,874.17          $4,679036.23
    Centre

                                       Table 1: NAC Asset Valuation

NAC Asset Condition
Levels of service and asset management decision making should be directly linked to asset
condition; this determines what condition the asset should be in before an AM intervention. The
intent of current and future Condition Assessments (CA) is to:

    Provide a robust and repeatable process for carrying out condition assessments on Council
     assets;
    Use condition assessments to develop programs for intervention with regards to further
     inspection, monitoring, maintenance and renewals;
    Provide a coarse surrogate for likelihood of asset failure for those assets not inspected.
A consistent condition ranking scale has been chosen by Council as the framework for measuring
NAC assets. This is defined in Annex C. Any asset scoring 4 to 5 will be considered under a renewal
program.

Two significant CAs have been conducted on the NAC during the 2016/2017 financial year. The initial
CA covered all NAC pool plant equipment and provided comprehensive condition information for all
pool plant and equipment. The assessment included estimated economic life, asset condition, repair
priorities, expected year of replacement and costs for replacement of assets. The second CA covered
NAC building & facility assets. Supporting civil infrastructure such as carparks, fencing, pathways
and drainage were not included on either of the asset condition assessments.

In asset reporting an approach to linking individual assets to each pool has been undertaken. The
remainder of assets grouped “general” includes supporting civil assets, buildings and minor facilities.

The Graph below details the assets inspected by the combined Condition Assessments. The asset
conditions are ranked according to the International Infrastructure Management Manual (IIMM). The
combined rating of these assets resulted in a 2-3 (Very Good to Good) rating. These assets are
grouped consistently and reported accordingly throughout this document.




                                                                                            Page 11

Section 13

                                                                                                Noosa Council
                                                                                        Asset Management Plan
                                                                                          Noosa Aquatic Centre

                                       Condition by Number of Assets
             35
                                                                                                  5
             30                                                                                   4

             25                                                                                   3
                                                                                                  2
             20
                                                                                                  1
             15

             10

              5

              0
                             LTS                  25M                50M                General

                                      Figure 1: NAC Condition by Number of Assets


The breakdown of replacement costs by asset condition is depicted in the graph below. The
importance of this graph is to identify the value of each asset condition and where future investments
are required to renew or rehabilitate the NAC assets. There are a number of high valued assets at
condition 4 associated with the 50m pool; the timing and renewal of these assets will be addressed
in the asset renewal plan that is included in this AMP and, will be reflected in Council’s 5 – 10 year
Capital Works Program.


                         NAC Asset Condition by Replacement Costs
             $1,200,000.00
                                                                                                  5
             $1,000,000.00                                                                        4
                                                                                                  3
              $800,000.00
                                                                                                  2

              $600,000.00                                                                         1


              $400,000.00

              $200,000.00

                    $0.00
                                        LTS             25M             50M             General


                                   Figure 2: NAC Asset Condition by Replacement Costs




                                                                                                      Page 12

Section 14

                                                                                               Noosa Council
                                                                                       Asset Management Plan
                                                                                         Noosa Aquatic Centre
NAC Operations
Operations for the NAC are those activities not specifically targeted towards upgrade, replacement,
maintenance or restoration. These day to day operational activities have no effect on NAC facility
conditions but, are necessary to keep the assets appropriately utilised and operating. This includes
community service type operating costs e.g. facility staffing.

Typical operational activities include:

   Utility costs, e.g. water, electric, gas and rates;
   Cleaning and consumables;
   Salaries, depreciation;
   Security surveillance and patrols;
   Asset management data collection and condition assessment.
Operations expenditure is not fully distinguished from maintenance expenditure in the Council
financial systems; however there are some entries on a line item basis that relate to operations costs
e.g. utility costs including electricity, gas, water, depreciation and income.

     NAC - Operating                                 Actual                                    Budget
Financial Statement            2013/14      2014/15        2015/16      2016/17        2017/18        2018/19
total revenue                   -681,936    -1,571,869 -1,581,762       -1,806,112     -1,710,248   -1,831,399
total operating expense          816,623     2,078,841    2,117,368      2,472,341      2,655,836    2,668,161
                                 134,687       506,972      535,606        666,229        945,588      941,052
                       Table 2: NAC Annual Operations Expenditures (actuals and proposed budget)


It is estimated that operational costs will rise in the future with increasing utility costs; particularly
electricity. Noosa Council will consider various sustainability and energy efficiency measures in
existing and upgraded facilities to minimise costs and environmental impact. This operational
strategy is considered in relation to Zero Emissions Noosa™ (ZEN) Organisational Strategy.
Asset condition inspections and asset data collection is included in operational costs at the NAC.
Asset inspections, asset data collection and condition assessments will be carried out on a cyclic
three-year basis. It will support the accumulation of a more comprehensive and refined asset data;
creating a greater understanding of the condition and deterioration profile of assets. As buildings are
upgraded and renewal work is completed, asset inventories will be updated through the capitalisation
process.




                                                                                                       Page 13

Section 15

                                                                                              Noosa Council
                                                                                      Asset Management Plan
                                                                                        Noosa Aquatic Centre
NAC Maintenance Plan
Maintenance is fundamental for the ongoing operations of the NAC; it is considered an investment
rather than a liability. The NAC relies on maintenance costs, these are a significant annual
investment that directly influence the day to day operation of the facility. The ongoing development
of asset knowledge through asset inspections, maintenance inspections, subsequent defect
monitoring and repairs are fundamental in developing sustainable intervention levels for renewals
and replacement of assets. The Table below provides details of previous years and future budget
forecasts for maintenance activities.


NAC - Maintenance
                                                       Actual                                  Budget
                                  2013/14
                                 (6 months)     2014/15          2015/16    2016/17      2017/18      2018/19

Total maintenance expense             43,138       103,377         79,860   120,917       101,704     104,290
                                      Table 3: Maintenance Expenditure


The figure below depicts maintenance specific activities generated from the condition assessments
undertaken. Not all asset maintenance activities have been completely determined in this table.




                      Annual Asset Maintenance Costs                                           General
$200,000.00                                                                                    LTS
$180,000.00
                                                                                               25M
$160,000.00
                                                                                               50M
$140,000.00
$120,000.00
$100,000.00
 $80,000.00
 $60,000.00
 $40,000.00
 $20,000.00
      $0.00
              2016     2017    2018     2019    2020      2021      2022    2023       2024    2025

                              Figure 3: Annual Maintenance Costs by Asset Group


Ongoing maintenance costs are identified to ensure council understands the whole of life costs
associated with the operations of the facility. The figure below identifies the long term financial
commitment required in maintaining assets. In order to maintain assets to an acceptable level, the
cumulative costs over a ten year period will equate to $1.2m. Annex D provides a more detailed list
of maintenance activities per annum.




                                                                                                      Page 14

Section 16

                                                                                             Noosa Council
                                                                                     Asset Management Plan
                                                                                       Noosa Aquatic Centre



                   Cumulative Total Maintenance Costs
$1,400,000.00
$1,200,000.00
$1,000,000.00
 $800,000.00
 $600,000.00
 $400,000.00
 $200,000.00
       $0.00
                2016     2017   2018     2019    2020      2021     2022      2023     2024      2025

                 Total          Cumulative         Linear (Total)          Linear (Cumulative)


                                    Figure 4: NAC Total Maintenance Costs

Asset Renewals
The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain
and operate the facility. Asset failure due to lack of renewal will affect the operations of the facility
and subsequently the service provided to the Noosa Community.

 NAC asset renewals are condition based. Recent condition assessments of the pool equipment, the
supporting building and facilities has provided staff the ability to develop a Capital Renewal Program.
(Annex D lists the renewal program by asset) There are assets that have not been included in the
condition assessments and subsequent maintenance and renewal plans. These assets include the
supporting infrastructure assets such as, carparks, pathways, fencing and stormwater drainage.
Assets not currently included in this AMP will be included in other asset specific condition
assessments and will be prioritised by the relevant asset management working groups.


NAC Renewal Replacement Plan
Renewal expenditure is work which does not increase the NAC’s design capacity but restores,
rehabilitates, replaces or renews an existing asset to its original service capacity. Improved condition
assessment data compiled in 2017 included asset renewal considerations based on physical
conditions and estimates of remaining useful life of assets therefore guiding renewal programs.
Renewal plans are developed to maintain levels of service to ensure assets achieve their optimal
useful life before they reach the asset condition range of 5. A renewal program is defined in Annex
E.

The graph below depicts the planned renewals by asset class. Significant planned renewals for the
2019/2020 financial year for the 50m pool are in place. In a further 10 years, as the majority of plant
equipment and costs are aligned to the operations of the 50m pool, continued CAs will be required.
The graph below enables Council to identify and plan for significant renewal activities.




                                                                                                        Page 15

Section 17

                                                                                                                                                                                  Noosa Council
                                                                                                                                                                          Asset Management Plan
                                                                                                                                                                            Noosa Aquatic Centre




                                                          Annual Asset Replacement Costs
                                                                                                                                                                                                                General
 $500,000.00
 $450,000.00                                                                                                                                                                                                    LTS
 $400,000.00                                                                                                                                                                                                    25M
 $350,000.00
 $300,000.00                                                                                                                                                                                                    50M
 $250,000.00
 $200,000.00
 $150,000.00
 $100,000.00
  $50,000.00
       $0.00
                                                         2021
                 2016
                          2017
                                   2018
                                           2019
                                                  2020


                                                                 2022
                                                                         2023
                                                                                  2024
                                                                                         2025
                                                                                                 2026
                                                                                                            2027
                                                                                                                    2028
                                                                                                                            2029
                                                                                                                                   2030
                                                                                                                                          2031
                                                                                                                                                  2032
                                                                                                                                                          2033
                                                                                                                                                                   2034
                                                                                                                                                                           2035
                                                                                                                                                                                  2036
                                                                                                                                                                                             2037
                                                                                                                                                                                                     2038
                                                                                                                                                                                                             2039
                                                                                                                                                                                                                    2040
                                                                                                                                                                                                                           2041
                                                                 Figure 5: NAC Asset Replacement Costs


Furthermore, the graph below identifies the cumulative costs and future investment required in
renewing assets over a 25 year period. These renewals are identified in Councils 5 -10 year Capital
Works Program.


                                              Cumulative Total Replacement Costs
 $2,500,000.00


 $2,000,000.00


 $1,500,000.00


 $1,000,000.00


  $500,000.00


        $0.00
                                                                                2024




                                                                                                                                                                                      2038
                   2016
                            2017
                                    2018
                                           2019
                                                  2020
                                                         2021
                                                                2022
                                                                        2023


                                                                                       2025
                                                                                              2026
                                                                                                     2027
                                                                                                             2028
                                                                                                                     2029
                                                                                                                            2030
                                                                                                                                   2031
                                                                                                                                          2032
                                                                                                                                                 2033
                                                                                                                                                         2034
                                                                                                                                                                 2035
                                                                                                                                                                        2036
                                                                                                                                                                               2037


                                                                                                                                                                                              2039
                                                                                                                                                                                                      2040
                                                                                                                                                                                                             2041




                          Total                           Cumulative                                    Linear (Total)                                   Linear (Cumulative)


                                                     Figure 6: NAC Cumulative Asset replacement Costs

Capital Upgrades & New Assets
The need to develop a 10-year masterplan has been identified by NAC management in order to
ensure a strategic approach to asset enhancement and investment. The masterplan will identify the
changes in the current asset base and determine if upgrades or new assets are to be acquired. The
development of the masterplan will be in accordance to Council’s standard practices and scheduled
into the budget process.




                                                                                                                                                                                                                Page 16

Section 18

                                                                                  Noosa Council
                                                                          Asset Management Plan
                                                                            Noosa Aquatic Centre
Capitalisation of Assets
All new and renewed assets will be acquired and commissioned in accordance with the Noosa
Council Capital Delivery Framework.


Disposal and Replacement of Assets
Disposal of assets will be consistent with statutory and regulatory requirements. The replacement
of assets will be driven from the condition assessments.

The disposal and commissioning of assets from the asset register is undertaken in the capitalisation
and asset write-on/off process. This process is being delivered via the Asset Management Branch
and Finance Branch.




                                                                                        Page 17

Section 19

                                                                                     Noosa Council
                                                                             Asset Management Plan
                                                                               Noosa Aquatic Centre
RISK MANAGEMENT PLAN
The risk management plan is a coordinated approach to the management and control of risk by
Noosa Council.


Critical Assets
The identification of critical assets is based on the consequence of failure multiplied by the likelihood
of failure; as adapted from the International Infrastructure Manual 2015 Section 3.2.4. For an
indicative draft table of risk measures refer to

ANNEX F: NOOSA COUNCIL CRITICALITY MATRIX.
Risk Assessment
It is important to have a good understanding of the risks associated with the operations of the NAC.

The top three asset related risks are:
   Failure to meet water quality standards resulting in closure.
   Circulation pump failure to the 25m or LTS Program Pool (no redundancies whereas 50m does
    have).
   Heat pump failure (during cooler months).
These risks and all other current risks are documented in the Branch Plan - Community Facilities -
Noosa Aquatic Centre 2017/18.




                                                                                             Page 18

Section 20

                                                                                              Noosa Council
                                                                                      Asset Management Plan
                                                                                        Noosa Aquatic Centre
FINANCIAL SUMMARY
Financial Statements and Projections
The Community Facilities Branch Plan details the financial statements and projections associated
with the total management of the NAC on an annual basis.


Funding Strategies
The immediate improvements to funding requests for maintenance and renewals in the budget
process are now evidence based and are supported from the condition assessments that have been
carried out.

The funding strategy, key assumptions, reliability and confidence levels are detailed in the Council’s
long-term financial plan. More detailed funding strategies that promote the long-term sustainability
of the NAC will be further developed and defined in future asset management plans.


Budget Forecasts
Budget forecasts will continue to be developed as information is captured and reported from the
Technology One (T1) financial system. Through the annual review of actuals, maintenance and
renewal activities against budget will initiate further development and identify trends that are
reportable and reflect future year forecasts.

The figure below identifies the current forecasts for the operational, maintenance and renewal
expenses to demonstrate the whole of life costs over a 10-year period for the NAC. In
summarising, the 10-year forecast has an overall expenditure increase from $800k to $1.4m from
year 1 to year 10. There are peak expenditures in years 4 and 7 because of significant asset
renewals planned.

                               Forecasted Expenditures
1,600,000

1,400,000

1,200,000

1,000,000

 800,000

 600,000

 400,000

 200,000

       0
            2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26


            Maintenance    Renewals        Operating + Revenue      Total expenses (incl. Revenue)


                                      Figure 7: NAC forecasted expenditures




                                                                                                     Page 19

Section 21

                                                                                   Noosa Council
                                                                           Asset Management Plan
                                                                             Noosa Aquatic Centre
The reactive nature of equipment failure and the initial development of condition monitoring indicates
there is potential difficulty and limited scope to predict breakdown-related maintenance. However, in
pulling these forecasts together the following general assumptions have been identified.

   Proposed Capital Renewal Program will be funded as per the current Council model adopted;
   Renewal works will be prioritised according to asset condition;
   The condition and physical footprint of the NAC as stated as of June 2017;
   Current maintenance funding levels will meet service level requirements;
   Renewals, maintenance and isolated failure replacement is generally ‘like for like’;
   Where a renewal must be provided to a higher standard, the difference in cost between a ‘like for
    like’ renewal and the higher standard is to be treated as an asset upgrade.
   Depreciation is in accordance with Council Policy;
   There is no allowance for CPI as the continuing revaluation and condition inspection process will
    make adjustments for current rates.




                                                                                           Page 20

Section 22

                                                                                     Noosa Council
                                                                             Asset Management Plan
                                                                               Noosa Aquatic Centre
PLAN IMPROVEMENT AND MONITORING
Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through Technology One asset information
management system.

Improvement Program
The following initiatives are recommended:
1. Asset Inventory – Ensure that there is one single asset register/hierarchy that captures all
   parent and child assets; at a level of the lowest or appropriate repairable unit. All other duplicated
   asset lists/registers should be eliminated. The T1 is the Enterprise Asset Management
   Repository. Prior to the revaluation, it is recommended a detailed asset register and data
   reconciliation project establishes a single point of truth for asset data within T1.
2. Condition Assessments – Consideration for more detailed condition assessments, to include
   all assets other than the pool related assets already assessed. Investigate the potential for
   implementing regular electronic condition assessments on mobile devices for use in a formal
   renewal plan and improve record keeping.
     Condition assessments for the civil infrastructure that supports the NAC such as carparks,
     street/flood lighting, pathways and non-specific pool equipment should be incorporated in future
     condition inspection routines.
3. Master Planning – Management has identified the need to develop a 10-year masterplan in
   order to ensure a strategic approach to asset enhancement and management. The masterplan
   should be given greater priority to ensure that future upgrades, expansions and acquisitions of
   new assets are aligned to the overall direction of the facility.

4. Asset Systems - An initial implementation of work orders for reactive work has been completed
   by management. However, there is still a significant number of functions of the T1 system that
   would improve the operational and maintenance activities and further improve the asset
   management objectives of the organisation. These include:
     i.     Planned maintenance work orders;
     ii.    Costings via work orders;
     iii.   Inspections and defects logged within T1;
     iv.    Asset performance reporting from T1.
5.    Customer Surveys – the continued delivery of surveys across the various programs delivered
      will ensure that the NAC continues to meet the overall needs of the Noosa Community.
6.    Renewal and Maintenance Plans – Plans must be regularly reviewed and incorporated into
      the annual budget process. Continued inspections and recording of asset condition and
      maintenance activities are key to achieving this initiative.




                                                                                             Page 21

Section 23

                                                                                   Noosa Council
                                                                           Asset Management Plan
                                                                             Noosa Aquatic Centre
Monitoring and Review Processes for the Asset Management Plan
This first edition of Asset Management Plan for the NAC refers to current levels of services that have
existed over recent years. This AMP is to be a ‘living’ document reflecting actual practices used in
managing the NAC. In accordance with this, Council will use best practice to balance cost, risk and
performance needs for the NAC.


The AMP will have a high-level annual review for developing the annual budget from the
maintenance and renewal plans. A full document review will occur on a three-year cycle, in line with
the completion of detailed condition assessments and the financial asset revaluation of the NAC.


Asset Management Effectiveness
The effectiveness of this Asset Management Plan will be measured in terms of:
1.   Adoption of the NAC AMP by Council.
2.   The ongoing development of good asset knowledge through a commitment to recording
     information against assets and undertaking cyclic condition assessments at the facility.
3.   Maintenance and renewal plans that are robust and initiate the annual budget process.
4.   Historical asset activities that are recorded and located in Council’s asset management
     system.
5.   Limited reactive work and more planned maintenance activities.
6.   The NAC Asset Management Plan becomes the reference point of all information that enables
     good decision making for asset related activities and investments.




                                                                                          Page 22

Section 24

                                                                                       Noosa Council
                                                                               Asset Management Plan
                                                                                 Noosa Aquatic Centre
 ANNEX A: NAC Stakeholders
 The internal and external stakeholders for the NAC are detailed below:
  Role                         Function
  Internal
  Council Staff                Council officers play a major role in managing assets to ensure that
                               they provide a level of service that meets the needs of both residents
                               and visitors to the area. Council officers implement the components
                               identified in the NAC asset management plan.
  Elected Council Officers     This stakeholder group includes Councilors and the Mayor for the
                               Council. They are primarily responsible to ensure that their decisions
                               represent and reflect the needs of the wider Noosa community.
  Council Asset                Ensures the asset management planning covers the whole of life and
  Management Group             optimally balances cost, risk and performance of the NAC where
                               possible.
  Asset Manager                Community Facilities Manager responsible for Community Facilities
                               branch management.

  NAC Coordinator              Responsible for Operational Control and NAC facility management.
  NAC Pool Operations          Responsible for Facility Maintenance and Maintenance Control.
  Supervisor
  Finance                      Ensures that the appropriate level of financial information is made
                               available to Community Facilities branch management.
  External
  Community & Residents        Residents are the core users of the NAC. Their needs, wants and
                               expectations are conveyed to Council, which should be reflected in
                               the levels of service for:
                                  Casual users
                                  Members and visit pass holders
                                  Local sports clubs
                                  Local schools
                                  Junior squad contractors
                                  Café contractors
                                  Onsite osteopath
  Councils Insurer             Ensures that all insurance and risk are adequately addressed.
  Visitors                     Visitor’s wants, needs and expectations drive the development in
                               areas of the highest tourism usage.
  NAC Specialist                  Aquapower
  Contractors
                                  Billabong Pool Services
                                  Gealys Aircon




It is important that the defined roles have the capability and capacity within their management
responsibility to make good on the responsibilities assigned to them. From stakeholder discussions
held during development of the Asset Management Improvement Roadmap, some of these
responsibilities may be centralised in the first instance and then transferred to other parts of the
Organisation when the appropriate capability and/or capacity is developed.




                                                                                                Page 23

Section 25

                                                                                   Noosa Council
                                                                           Asset Management Plan
                                                                             Noosa Aquatic Centre
ANNEX B: MEASURED LEVELS OF SERVICE
Community Levels of service
Performance       Level of Service       Measure          Measurement          Target
Measure                                                   Criteria
Availability      NAC is Available       Degree of        Unplanned            No more than 1
                                         Availability     Closures             unplanned pool
                                                                               closure p.a. with a
                                                                               maximum of 1
                                                                               working day.
                                         Equipment        Equipment            No more than 10
                                         Failure          Failure Records      recordable p.a.
Quality           NAC is Fit for         Condition of     Condition            Aim to maintain
                  Purpose                NAC Assets       Assessments          assets with a
                                                                               condition score of
                                                                               1-3 and all assets
                                                                               with scores 4 & 5
                                                                               are prioritised and
                                                                               identified for
                                                                               renewal.
Affordability     NAC fees are           Access rates     Benchmark fees       Fees +/- 10% of
                  competitive and        and fees         of similar           average industry
                  affordable                              facilities in SEQ.   rates
                                         Customer         Customer             NPS score
                                         Feedback         satisfaction         greater than 30.
                                                          survey
Health and        NAC facility is safe   No of Injuries   Reported Injuries    Zero reportable
Safety            and free from                                                injuries on-site.
                  Hazards
                                         System/Asset     Response to          Responses to all
                                         Failures         Repairs              failures are
                                                                               repaired within
                                                                               agreed
                                                                               timeframes.
Legal and         Compliance of NAC      Compliance       Audit of Legal       100% Compliant
Statutory         Facility               with Legal,      and Statutory        through water
Compliance        Management             Statutory        Compliance           quality testing &
                                         Standards and                         WH&S
                                         relevant codes                        inspections.
                                                          Noncompliance        Nil Non-
                                                          warnings per         Compliance
                                                          year                 Warnings
Appearance and    NAC Facilities are     Cleanliness      Customer             Less than 5
Presentation      clean and                               Feedback             formal written
                  presentable                                                  complaints about
                  condition                                                    cleanliness of
                                                                               buildings per year
                                         Undertaking      A Percentage of      NAC facilities are
                                         works in         works completed.     maintained within
                                         alignment with                        90 % of prescribed
                                         NAC                                   standards and
                                         maintenance                           regularly reviewed.
                                         plans



                                                                                           Page 24

Section 26

                                                                                      Noosa Council
                                                                              Asset Management Plan
                                                                                Noosa Aquatic Centre
Technical Levels of service
Performance        Level of Service       Measure           Measurement           Target
Measure                                                     Criteria
Reliability        The ability of the     Mean Time         Corrective Work       Greater than 95%
                   NAC to consistently    between failure   Orders                reliability
                   perform its intended   (MTBF)
                   function on demand
                   and without
                   degradation or
                   failure.
Maintainability    The probability that   Mean Time to      Labour hours in       Less than 10 hours
                   a given                Repair (MTTR)     planned and
                                                                                  to respond to any
                   maintenance action,                      corrective work
                                                                                  high priority
                   for an item under                        orders
                                                                                  reactive work.
                   given conditions of
                   use can be carried
                   out within a stated
                   time interval
Quality            The NAC Facility       Asset condition   Number of 1 –         That defects are
                   Assets are             rating            asset condition       prioritised and
                   maintained within                                              rectified for assets
                   the 1-3 asset                                                  to be maintained at
                   condition criteria.                                            a minimum
                                                                                  standard of
                                                                                  condition 3.




                                                                                             Page 25

Section 27

                                                                                    Noosa Council
                                                                            Asset Management Plan
                                                                              Noosa Aquatic Centre
ANNEX C Asset Condition Rating Matrix

Rating   Performance   Description                                                         Remaining
         Rating                                                                              Life

                       Asset in sound physical condition designed to meet current
                       standards. Operable and well maintained. Asset likely to perform
 1       As New                                                                            90 – 100%
                       its current function with only routine maintenance. No corrective
                       maintenance work required.

                       Acceptable physical condition but not designed to current
                       standards, or showing minor wear. Deterioration has minimal
 2       Very Good     impact on asset performance. Minimal short-term failure risk but     70 – 90%
                       potential for deterioration or reduced performance in medium.
                       Only minor maintenance work required (if any).

                       Functionally sound asset and components, but showing some
                       wear with minor failures and some diminished efficiency. Minor
                       components or isolated sections of the asset need replacement
 3       Good          or repair but asset still functions safely at adequate levels of     40 – 70%
                       service. Deterioration beginning to be reflected in performance
                       and higher attendance for maintenance. Minor maintenance work
                       required but asset is still serviceable.

                       Asset and components function but require a high level of
                       maintenance to remain serviceable. Likely to cause a marked
 4       Fair          deterioration in performance in short term. No immediate risk to     5 – 40%
                       health or safety but will need to be monitored to ensure asset
                       remains safe. Corrective maintenance work required urgently.

                       Failed or failure imminent. Asset and component effective life
                       exceeded and excessive maintenance costs incurred. A high risk
                       of breakdown with potential serious impact on performance. No
 5       Poor          life expectancy. Health & safety hazards exist which present a        0 – 5%
                       possible risk to public safety, or asset cannot be
                       serviced/operated without a risk to personnel. Major
                       maintenance work or replacement required urgently.




                                                                                           Page 26

Section 28

ANNEX D: NAC Asset Maintenance Plan
Asset    Plant   Description                   2016      2017     2018      2019      2020      2021      2022      2023     2024        2025
No.

B01583   25M     Circulation pump strainer      $0       $150      $0       $150       $0        $0       $150       $0      $150         $0

B01584   25M     Circulation pump               $0       $200     $1,000     $0       $200       $0       $200     $1,000     $0         $200

B01585   25M     Circulation pump VSD           $0       $350     $600       $0      Renewal     $0       $350      $600      $0         $350

B01586   25M     Filter No1                    $200     $6,500    $300      $200      $300      $200     $6,500     $300     $200        $300

B01587   25M     Filter No2                    $600     $6,500    $300      $200      $300      $600     $6,500     $300     $200        $300

B01588   25M     Circulation flow meter        $500       $0      $250       $0       $250      $500       $0      Renewal    $0         $250

B01589   25M     Backwash water meter           $0        $0       $0        $0        $0        $0        $0        $0       $0          $0

B01590   25M     Hydraulic reticulation       $1,200    $1,500    $1,200   $1,500    $1,200    $1,200    $1,500    $1,200    $1,500     $1,200

B01591   25M     Electrical reticulation      $1,200     $500     $500      $500     $1,200    $1,200     $500      $500     $500       $1,200
                 Chemical reticulation -
B01592   25M                                   $650     Renewal   $650      $300      $650      $650      $300      $650     $300        $650
                 Chlorine
                 Chemical reticulation -
B01593   25M                                  Renewal    $250     $400      $200      $450      $400      $250      $400     $200        $450
                 Acid
B01594   25M     Heat Pump                    $8,000    $5,000    $3,000   $6,000    $30,000   Renewal   $5,000    $3,000    $6,000     $30,000

B01595   25M     Chlorine dosing pump          $650     Renewal   $650      $250      $650      $650      $250      $650     $250        $650

B01596   25M     Acid dosing pump             Renewal    $200     $450      $200      $450      $450      $200      $450     $200        $450

B01597   25M     Chemical dosing controller   $1,000    $1,500    $2,300   Renewal   $1,500    $1,000    $1,500    $2,300    $1,000     $1,500

B01598   LTS     Circulation pump strainer     $120       $0      $120      $120       $0       $120       $0       $120     $120         $0

B01599   LTS     Circulation pump               $0       $200     $1,500     $0       $200       $0      Renewal   $1,500     $0         $200

B01600   LTS     Circulation pump VDS           $0       $350     $600     Renewal    $350       $0       $350      $600      $0         $350

B01601   LTS     Filter No1                    $200     $7,000     $0       $200      $350      $200     $7,000      $0      $200       Renewal

B01602   LTS     Filter No2                    $200     $7,000     $0       $200      $350      $200     $7,000      $0      $200       Renewal

B01603   LTS     Filter No3                    $200     $7,000     $0       $200      $350      $200     $7,000      $0      $200       Renewal

B01604   LTS     Heat pump                    $1,500    $2,000    $3,000   $5,000    $3,000    $1,500    $2,000    $3,000    $5,000     $3,000

B01605   LTS     Backwash water meter           $0        $0       $0        $0        $0        $0        $0        $0       $0          $0
                 Circulation pump flow
B01606   LTS                                   $250       $0      $250       $0       $250      $250     Renewal    $250      $0         $250
                 meter



                                                                                                                                      Page 27

ANNEX D: NAC Asset Maintenance Plan
 oe
  ae earls py eXTol glo) ie) a) 2016 ln A 2018 2019 2020 2021 yA) YIP) yAIPZ.) 2025
  io.
feoises [as [rcuaionpume |__| 200 | siooo | eo | woo | so | sooo | svooo | w | sto |
feorses [aw [revsionpumpveo | so | seso_[ sooo | 50 | Fonowa | oo | soso | oom | 0 | soo |
faoises [as [orcuaiontowneie [sso [eo | sso | eo | 250 | e600 | eo | Renova | wo | sa80_—|
faoisee [asm [Bacwashwarne | «0 | eo | #» | » | » | » | » | » | » | o

feoises [17S [iauaionpumpstcner | svzo [eo | sao | wa | w | sa | wo | so | o@ | » |
faoises [ers [icuatonsone | 80 __| 200 | _sisoo | 0 | seoo_| | Fonowa | sao | eo | e200
Faoreeo [tis [revaionpumpvos | so | seso_[ s600 | Renew | soso | 0 | sso | som | 0 | smo |
feoreor [urs [rierwor «| sooo‘ sraoo [so [seo | 50 | sooo | s7ooo | 0 | 2200 | Renova ‘|
Feorece [urs [riernee ——«|_se00_—|_sraoo [so | seo | sso | soo | svooo | 90 | 2200 | Renova |
feoreos [rs [Fiornes ———(|_seoo [seo | | ao | ss60 | sao | s7aoo [eo | e200 | Ronewal_|
feorens [irs [Bavwashwatrmer | 9 | © | » | » | o | » | » | » | » | »
feos urs [Eagmereremy [eso [we [em [ [em | cao [rome | en |  [oe
                                                              Page 27

Section 29

Asset    Plant   Description                    2016      2017      2018      2019      2020      2021      2022      2023     2024        2025
No.

B01607   LTS     Chlorine dosing pump           $600     Renewal    $350      $600      $400      $600      $400      $350     $600        $400

B01608   LTS     Acid dosing pump              Renewal    $200      $450      $200      $450      $450      $200      $450     $200        $450
                 Water chemistry dosing
B01609   LTS                                   $1,000    $1,500    $2,300    $1,000    $1,500    $1,000    $1,500    Renewal   $1,000     $1,500
                 controller
B01610   LTS     Feature air blower             $250       $0       $850     Renewal    $250      $250       $0       $850      $0         $250
                 Solar heating pump
B01611   LTS                                    $300      $650      $300      $650      $300      $300      $650     Renewal   $650        $300
                 system No1
                 Solar heating pump
B01612   LTS                                    $650      $300      $650      $300      $650      $650      $300     Renewal   $300        $650
                 system No2
B01613   LTS     Solar heating collector No1    $800      $800      $800      $800      $800      $800      $800      $800     $800        $800

B01614   LTS     Solar heating collector No2    $800      $800      $800      $800      $800      $800      $800      $800     $800        $800

B01615   LTS     Hydraulic reticulation        $1,000    $1,500     $750     $2,000    $1,000    $1,000    $1,500     $750     $2,000     $1,000

B01616   LTS     Electrical reticulation        $600      $500     $1,200     $800      $600      $600      $500     $1,200    $800        $600
                 Chemical reticulation -
B01617   LTS                                    $300     Renewal    $300      $650      $300      $300      $650      $300     $650        $300
                 Chlorine
                 Chemical reticulation -
B01618   LTS                                   Renewal    $450      $200      $450      $200      $200      $450      $200     $450        $200
                 Acid
B01619   LTS     Feature pump                    $0        $0       $700       $0        $0      Renewal     $0       $700      $0          $0

B01641   LTS     Water make-up meter             $0        $0        $0        $0        $0        $0      Renewal     $0       $0          $0

B01646   LTS     Heating circulation pump        $0       $200     $1,000      $0       $200       $0       $200     Renewal    $0         $200

B01648   LTS     MCC -2 Switchboard             $250      $600      $600      $600     Renewal    $250      $600      $600     $600        $600
                 Circulation pump strainer
B01620   50M                                    $150       $0       $450       $0       $150      $150       $0       $450      $0         $150
                 No1
                 Circulation pump strainer
B01621   50M                                    $150       $0       $450       $0       $150      $150       $0       $450      $0         $150
                 No2
                 Circulation pump strainer
B01622   50M                                    $150       $0       $450       $0       $150      $150       $0       $450      $0         $150
                 No3
B01623   50M     Circulation pump No1          $1,200     $250      $650     $3,200     $250     $1,200    Renewal    $650     $3,200      $250

B01624   50M     Circulation pump No2          $1,200     $250      $650     $3,200     $250     $1,200    Renewal    $650     $3,200      $250

B01625   50M     Circulation pump No3          $1,200     $250      $650     $3,200     $250     $1,200    Renewal    $650     $3,200      $250

B01626   50M     Backwash pump                   $0       $200      $850       $0       $250       $0       $200      $850      $0        Renewal

B01627   50M     Backwash flow meter           Renewal     $0        $0        $0        $0        $0        $0        $0       $0          $0

B01628   50M     Filters                        $650      $650     $60,000    $650      $650      $650      $650     $60,000   $650        $650



                                                                                                                                        Page 28

ee eta Description 2016 nk, 2018 2019 2020 2021 2022 2023 2024 2025
 0.

faoreio [ers | Feauwearnioner | e250_| a0 | e050 | Ponowa | e250 | sao | 0 | sm | » | om |

feoreis [irs [Feawomne | | 0 | smo | 0 | % | foro | wo | smo | oo | w
feoreer [urs [Wwacrmatopmee | | | « | «© | » | © | fom | » | » | © |
fe0r6ie [LTS [Heaingcrcuaon np | so | se00 | sion [| so | sao | so | e200 | renews | wo | 200 |
 fein [ow [Eepmmoromesrere” Tsao [wo [awe [so [sie [smo | [om [so [se
 fees [aww [Recmeromesere Tso [wo [sw |» | sm [eo | [om [ | sm
 ois [or [Semen |e [wo [swe [| vm [veo [| oo [ = [vm |
feoreas [som | Bacwashumo | 30 | sooo | saso | so | sso | so | sao | ses0 | 80 | Renonal_
feorear [so | acwashiowmet | Rovewa| co | #0 | » | o | | » | » | « | »
                                                Page 28

Section 30

Asset    Plant     Description                   2016      2017      2018      2019      2020      2021      2022      2023      2024        2025
No.

B01629   50M       Heat pump No1                $20,000     $0      $1,500    $2,000    Renewal   $20,000     $0      $1,500    $2,000      $3,000

B01630   50M       Heat pump No2                $20,000   $10,000   $20,000   Renewal   $1,500    $20,000   $10,000   $20,000     $0        $1,500

B01631   50M       Circulation pump No1 VSD      $850      $200      $500      $850     Renewal    $850      $200      $500      $850        $200

B01632   50M       Circulation pump No2 VSD      $200      $500      $200      $500     Renewal    $200      $500      $200      $500        $200

B01633   50M       Circulation pump No3 VSD      $200      $500      $200      $500     Renewal    $200      $500      $200      $500        $200

B01634   50M       Hydraulic reticulation       $1,800    $5,000    $1,500    $4,000    $1,800    $1,800    $5,000    $1,500    $4,000      $1,800

B01635   50M       Electrical reticulation       $600     $1,500     $800      $600     $1,500     $600     $1,500     $800      $600       $1,500
                   Chemical reticulation -
B01636   50M                                     $650     Renewal    $650      $300      $650      $650      $300      $650      $300        $650
                   Chlorine
                   Chemical reticulation -
B01637   50M                                    Renewal    $250      $400      $400      $400      $400      $250      $400      $400        $400
                   Acid
B01638   50M       Chlorine dosing pump         Renewal    $250      $650      $250      $650      $650      $250      $650      $250        $650

B01639   50M       Acid dosing pump             Renewal    $250      $500      $250      $500      $500      $250      $500      $250        $500
                   Water chemistry dosing
B01640   50M                                    $1,000    $1,500    $2,300    $1,000    $1,500    $1,000    Renewal   $2,300    $1,000      $1,500
                   controller
B01642   50M       Water make up meter            $0        $0        $0        $0        $0        $0        $0        $0      Renewal       $0
                   Heat pump No2 circulation
B01644   50M                                     $200      $650       $0       $200     Renewal    $200      $650       $0       $200        $650
                   pump
                   Heat pump No1 circulation
B01645   50M                                      $0       $200      $650       $0       $200       $0       $200      $650     Renewal      $200
                   pump
B01649   50M       VSD flow controller           $300      $300      $300      $300      $300      $300      $300      $300      $300       Renewal

B01650   50M       Ultrasonics flow sensor        $0       $400      $300      $400      $300     Renewal    $400      $300      $400        $300

B01654   50M       PAC dosing pump               $400       $0      Renewal    $400       $0       $400       $0       $250      $400         $0

B01655   50M       Filter multiport valve       $2,500     $500     $15,000    $300      $500     $2,500     $500     $15,000    $300        $500

B01647   50M       Filtration switchboard       $1,500    $2,200    $3,000    $4,000    Renewal   $1,500    $2,200    $3,000    $4,000      $1,500

B01651   General   Chlorine storage tank          $0        $0        $0      Renewal     $0        $0        $0        $0        $0          $0

B01652   General   Chlorine bulk storage bund     $0        $0      $3,500      $0        $0        $0        $0      $3,500      $0          $0
                   Backwash water recovery
B01653   General                                $5,000    $5,000    $5,000    $5,000    $5,000    $5,000    $5,000    Renewal   $5,000      $5,000
                   plant
                   Backwash water recovery
B01654   General                                 $400       $0      Renewal    $400       $0       $400       $0       $250      $400         $0
                   pump
                   Backwash water pump
B01655   General                                $2,500     $500     $15,000    $300      $500     $2,500     $500     $15,000    $300        $500
                   (Sewer)



                                                                                                                                          Page 29

6c a6ed

      oos$         ooes       000‘si$       oos$         o0s‘z$        oos$        ooe$       000'si$       oos$       00s‘z$        duind soyem ysemoeg            ss910g
                                                                                                 ,                        :                       Tomas
                                                                                                                                                   duwnd
        ‘            ‘        emaua            ‘            ‘            ‘            ‘           ;           :           ‘                         weld | sua
     000's$       000's$      jemauay      000's$        000's$       000's$       000's¢      000's¢      000's$      000'S$ | noses seem ysemoeg | [2429 | esgt08
| os =|            os     | ls | ss                              |_| |                         os     |     os    | os         |__—_rae018 auioiyo                   is9108
    o0s‘1$        000'r$       000'e$      o0z‘z$        00s‘1$                    000'r$      000'e$      o0z‘z$      00s‘1$         preoquolms ue.                1>9108
      oos$         ooes       000's1¢       oos$         o0s‘z$        oos$        oos$       000'S1$       oos$       00s‘z$          anlea Uodn nw 191114         Ss9Loa
      ooe$         00r$        ooe$         00r$                       ooe$        00r$        ooe$         00r$    | os            Josuas MO} So|UOSeAIIA          os910g
                   ooe$        ooe$         ooe$          ooe$         ooe$        ooe$        ooe$         o0e$        o0e$            J9|]O11UOO MOY GSA          6r91L0a
                                                                                                                                                   duwnd
                                                                                                                                                   duwnd

        ,            ,                                                                :           :                                             Tal]oU00
     o0s‘I$       000'1$       ooe‘z$                    000'L$       o0s‘1$       000'1$      ooe‘z$      o0s‘1$      000'L$       Buisop Aujsiweyo 1019p          or91og
      o0s$        osz$         o0s$        osz$           o0s$         o0s$        osz$        o0s$         osz$                         dwind Buisop pioy          6e9109
     os9g         osz$         os9$        osz$           os9$         os9$        osz$        os9$         osz$                     dwind Buisop eusojy9           869109
      ors          ors         00r$        osz$           00r$         00r$        00r$        00r$         osz$                     - uonejnones jeoweys           1€9109
                                                                                                                                                    ploy
      oc9¢         oes         os9s         oes           os9s         os9s        oes         oc9¢                     osos         - uonejnone: joonuece          969108
                                                                                                                                                 SUNO|D
    o0s‘1$         009$        008$        00s‘I$         009$        00s‘1$       009$        008s        00s‘1$       009$           uonejnonas jeou109/3         se91og
     008'I$       000'r$       00s‘1$      000's$        008‘1$       008‘1$       000'r$     o0s‘1$       000's$      o08‘1$         uone|nonjes oyNeIPAH          veglog
      00z$         o0s$        00z$         o0s$          00z$                     o0s$        00z$         oos$        ooz$  | GSA EON duind uopeinoug             ee9109
      ooz$         oos$        ooz$         oos$          ooz$                     oos$        ooz$         oos$        oz     | GSA ZON dwind uoneinouI9           Ze910a
      ooz$         oses        oos$         ooz$          ose$                     oses        oos$         ooz$        ose¢   | GSA LON dwind uoneinoug             Le910g
    o0s‘1$    |    os    |    000‘0z$      000‘01$      000‘0z$       00s‘1$                  000'0z$      ooo'01¢ | ov0'oz$               ZON duind yeeH           oe910g
     000'e$       000'z$       00s'1$  |    os          000'02$                    000'2$      00s'1$  | os            000‘0z$             LON duind yea}           6z9104
                                                                                                                                                                        oe
      rAd          mrad        Pda          rad           1z0z        frit        ry           PTA          Ptr         ytd                  Terr eesti TT

Section 31

Asset     Plant     Description                    2016       2017       2018      2019       2020       2021      2022       2023      2024        2025
No.

1021862   25M       Pool Concrete                   $0         $0         $0        $0         $0         $0        $0         $0      $30,000       $0

1021864   50M       Pool Concrete                   $0       $30,000      $0        $0         $0         $0        $0       Renewal     $0        $50,000

1021876   LTS       Pool Concrete                   $0         $0         $0        $0         $0       $30,000     $0         $0        $0          $0

6000506   General   Superstructure                  $0         $0         $0        $0         $0       $30,000     $0         $0        $0          $0

6000504   General   Storage Shed Roof               $0         $0         $0        $0       $50,000      $0        $0         $0        $0          $0
                    Storage Shed Fit-Out &
New1      General                                   $0         $0         $0        $0         $0       $20,000     $0         $0        $0          $0
                    Fittings
6000474   General   Lifeguards Building Roof        $0         $0         $0        $0         $0         $0        $0         $0        $0        $1,000
                    Lifeguards Building Fit-Out
New2      General                                   $0         $0         $0        $0         $0         $0        $0         $0        $0        $5,000
                    & Fittings
                    Main Building and
6000484   General                                   $0         $0       $3,000      $0         $0         $0        $0         $0        $0          $0
                    Amenities Roof
                    Main Building and
6000478   General   Amenities Fit-Out &             $0         $0         $0        $0       $7,000       $0        $0         $0        $0          $0
                    Fittings
                    Managers Residence
6000495   General                                   $0       $1,000       $0        $0         $0         $0       $1,000      $0        $0          $0
                    Superstructure
                    Managers Residence Sub
6000494   General                                   $0       $5,000       $0        $0         $0         $0       $5,000      $0        $0          $0
                    Structure
6000493   General   Managers Residence Roof         $0         $0       $4,000      $0         $0         $0        $0         $0        $0          $0
                    Managers Residence Fit-
6000488   General                                   $0         $0       $15,000     $0         $0         $0        $0         $0        $0          $0
                    Out & Fittings
6000499   General   Managers Residence Roof         $0         $0         $0        $0         $0       $3,000      $0         $0        $0          $0




                    Totals                        $85,820   $121,000   $186,420   $56,270   $123,850   $163,870   $90,450   $155,420   $87,270    $127,950




                                                                                                                                                 Page 30

Asset     ea ela   Description                2016        2017        2018        2019         2020         2021         2022        yA)          2024        2025
   No.

                     Storage Shed Fit-Out &

                     Lifeguards Building Fit-Out
                     Main Building and
                     Main Building and
  6000478 | General | Amenities Fit-Out &                                                       $7,000
                     Fittings
                     Managers Residence
                     Managers Residence Sub

                     Managers Residence Fit-

| =      || Totals                            $85,820 | $121,000 | $186,420 | $56,270 | $123,850 | $163,870 | $90,450 | $155,420 | $87,270 | $127,950

                                                                                                                                                            Page 30

Section 32

ANNEX E: NAC Asset Renewal program
Asset    Plant                   Description            Manufacturer        Model No.    Serial No.   Installation    Anticipated    Asset       Supply &
                                                                                                         Date           Year of     Condition   Installation
                                                                                                                     Replacement     Rating        Cost
B01583   25M     Circulation pump strainer          Jagpoly             200X150                          2006           2026           2          $2,050

B01584   25M     Circulation pump                   Aquaplus            10026S10        PMEW1801         2006           2031           2          $4,700

B01595   25M     Chlorine dosing pump               Alldos              221-27-10062                     2010           2017           4          $2,500

B01586   25M     Filter No1                         Waterco             M3750             362185         2006           2029           2         $15,500

B01587   25M     Filter No2                         Waterco             M3750             362187         2006           2029           3         $15,500

B01588   25M     Circulation flow meter             Magmeter            FlowX 3                          2012           2023           3          $2,200

B01589   25M     Backwash water meter               Arad                HB-6-8-03         150mm          2012           2027           1           $950

B01590   25M     Hydraulic reticulation                                                                  2006           2041           2         $40,000

B01591   25M     Electrical reticulation                                                                 2006           2041           2         $22,000

B01596   25M     Acid dosing pump                   Grundfoss           DMI 1.6                          2011           2016           4          $1,200

B01607   LTS     Chlorine dosing pump               Alldos              205-14           07/15430        2010           2017           4          $1,800

B01594   25M     Heat Pump                          Accent Air                                           2006           2021           3         $150,000

B01608   LTS     Acid dosing pump                   Alldos              208- 1.6         03/68947        2011           2016           4          $1,200

B01617   LTS     Chemical reticulation - Chlorine   Alldos                                               2000           2017           4          $2,000

B01618   LTS     Chemical reticulation - Acid       Alldos              208 - 1.6                        2000           2016           4          $1,500

B01598   LTS     Circulation pump strainer          Swimplex            200x 200                         2000           2030           3          $8,500

B01599   LTS     Circulation pump                   Southern Cross      MFF4 GC-F       16120110A32      2000           2022           2          $4,500

B01627   50M     Backwash flow meter                Arad                100mm                            2012           2016           2           $750

B01601   LTS     Filter No1                         Waterco             2m2                              2000           2025           3         $18,500

B01602   LTS     Filter No2                         Waterco             2m2                              2000           2025           3         $18,500

B01603   LTS     Filter No3                         Waterco             2m2                              2000           2025           3         $15,500

B01604   LTS     Heat pump                          Accent Air          HWP 200-3                        2016           2031           1         $120,000

B01605   LTS     Backwash water meter               Arad                100mm Flanged                    2012           2028           2           $700

B01606   LTS     Circulation pump flow meter        Magmeter Flow x 3   150mm                            2012           2022           4          $2,200




                                                                                                                                                    Page 31

Section 33

Asset     Plant                     Description                Manufacturer         Model No.    Serial No.   Installation    Anticipated    Asset       Supply &
                                                                                                                 Date           Year of     Condition   Installation
                                                                                                                             Replacement     Rating        Cost
B01636    50M       Chemical reticulation - Chlorine       Alldos                                                1999           2017           4          $2,500

B01638    50M       Chlorine dosing pump                   Alldos             221-27             01/92029        2010           2016           4          $2,500

B01609    LTS       Water chemistry dosing controller      Prominent          DSR               20110116520      2011           2023           2          $7,500

B01651    General   Chlorine storage tank                  Bushman            2kl                                2010           2019           4          $3,500

B01611    LTS       Solar heating pump system No1          Pentair            3.2kW                              2011           2023           2          $4,500

B01612    LTS       Solar heating pump system No2          Pentair            3.2kW                              2011           2023           2          $4,500

B01613    LTS       Solar heating collector No1                                                                  2011           2026           2         $23,000

B01614    LTS       Solar heating collector No2                                                                  2011           2026           2         $23,000

B01615    LTS       Hydraulic reticulation                                                                       2000           2035           3         $25,000

B01616    LTS       Electrical reticulation                                                                      2000           2035           2         $15,000

B01629    50M       Heat pump No1                          Accent             HWP250              HW338          1999           2020           4         $150,000

B01639    50M       Acid dosing pump                       Grundfos           DDE 6-10                           2011           2016           3          $2,200

B01619    LTS       Feature pump                           Grundfos           65 x 50                            2000           2021           3          $3,700

B01620    50M       Circulation pump strainer No1          Swimplex                                              2004           2030           3          $9,500

B01621    50M       Circulation pump strainer No2          Swimplex                                              2004           2030           3          $9,500

B01622    50M       Circulation pump strainer No3          Swimplex                                              2004           2030           3          $9,500

B01623    50M       Circulation pump No1                   Southern Cross     150 x 125-250                      2012           2022           3          $7,200

B01624    50M       Circulation pump No2                   Southern Cross     150 x 125-250                      2012           2022           3          $7,200

B01625    50M       Circulation pump No3                   Southern cross     150 x 125-250                      2012           2022           3          $7,200

B01626    50M       Backwash pump                          Davey              125 x 100-200                      2012           2025           3          $4,900

1021864   50M       Pool Concrete                                                                                               2023           2         $50,000

B01628    50M       Filters                                Hydotech           8 cells                            1999           2031           3         $260,000

6000503   General   Storage Shed Lighting                                                                                       2017           2          $1,000

6000473   General   Lifeguards Building Lighting                                                                                2023           2           $200

6000483   General   Main Building and Amenities Lighting                                                                        2017           2          $5,000

6000492   General   Managers Residence Lighting                                                                                 2019           3          $2,000




                                                                                                                                                            Page 32

Section 34

Asset     Plant                     Description               Manufacturer        Model No.         Serial No.   Installation    Anticipated    Asset       Supply &
                                                                                                                    Date           Year of     Condition   Installation
                                                                                                                                Replacement     Rating        Cost
6000498   General   Plant Room 25m Lighting                                                                                        2017           2           $500

B01634    50M       Hydraulic reticulation                                                                          1999           2036           3         $120,000

B01635    50M       Electrical reticulation                                                                         1999           2036           3         $60,000

B01597    25M       Chemical dosing controller          Prominent            DSR                    2006018640      2006           2019           2          $7,500

B01654    General   Backwash water recovery pump        Grundfos             Unilift                                2016           2018           2           $600

B01600    LTS       Circulation pump VDS                ITT                        1,234,567,890                    2011           2019           3          $9,800

B01610    LTS       Feature air blower                  Esam                 3kW                                    2000           2019           2          $4,200

B01640    50M       Water chemistry dosing controller   Prominent            DSR                    2009050106      2010           2022           3          $7,500

B01641    LTS       Water make-up meter                 Arad                 50mm                                   2011           2022           2           $600

B01642    50M       Water make up meter                 Arad                 50mm                                   2012           2024           2           $700

B01630    50M       Heat pump No2                       Accent               HWP250                  HW340          1999           2019           4         $130,000

B01645    50M       Heat pump No1 circulation pump      Grundfos                       96,402,455                   1999           2024           2          $3,300

B01646    LTS       Heating circulation pump            Grundfos             96402325P                              2016           2023           2          $3,000

B01631    50M       Circulation pump No1 VSD            Schneider            ATV12WD11N4                            2015           2020           3         $10,000

B01632    50M       Circulation pump No2 VSD            Schneider            ATV12WD11N4                            2015           2020           3         $10,000

B01649    50M       VSD flow controller                                                                             2012           2025           2          $2,800

B01650    50M       Ultrasonics flow sensor             SiteLab              SL1168                                 2012           2021           2          $6,000

B01633    50M       Circulation pump No3 VSD            Schneider            ATV12WD11N4                            2015           2020           3         $10,000

B01652    General   Chlorine bulk storage bund                               Concrete Block                         1999           2031           2          $6,000

B01653    General   Backwash water recovery plant       Ipools               UFF                                    2008           2023           4         $120,000

B01585    25M       Circulation pump VSD                Xylem                HV4.110M2.5                0           2011           2020           2          $9,800

B01592    25M       Chemical reticulation - Chlorine    Alldos                                                      2006           2017           4          $2,500

B01593    25M       Chemical reticulation - Acid        Alldos                                                      2006           2016           4          $2,500

B01655    50M       Filter multiport valve              Hydrotech                                                   1999           2039           4         $25,000

B01637    50M       Chemical reticulation - Acid        Alldos                                                      1999           2016           4          $2,500

B01644    50M       Heat pump No2 circulation pump      Grundfos                       96,402,455                   1999           2020           3          $3,300




                                                                                                                                                               Page 33

Section 35

Asset     Plant                     Description                   Manufacturer        Model No.   Serial No.   Installation    Anticipated    Asset       Supply &
                                                                                                                  Date           Year of     Condition   Installation
                                                                                                                              Replacement     Rating        Cost
B01647    50M                 Filtration switchboard                  Remp                                        1999           2020           4         $75,000

B01648    LTS       MCC -2 Switchboard                                                                            2000           2020           3         $25,000

B01654    50M       PAC dosing pump                            Grundfos          DDE 6-10                         2013           2020           3          $1,200

B01655    General   Backwash water pump (Sewer)                Grundfos          Unilift                          2015           2020           3           $600

1021862   25M       Pool Concrete                                                                                                  -            2

1021876   LTS       Pool Concrete                                                                                                  -            2

6000474   General           Lifeguards Building Roof                                                                               -            2
                      Main Building and Amenities Fit-Out &
6000478   General                                                                                                                  -            2
                                     Fittings
6000484   General       Main Building and Amenities Roof                                                                           -            2

6000488   General    Managers Residence Fit-Out & Fittings                                                                         -            3

6000493   General          Managers Residence Roof                                                                                 -            3

6000494   General      Managers Residence Sub Structure                                                                            -            3

6000495   General     Managers Residence Superstructure                                                                            -            3

6000499   General          Managers Residence Roof                                                                                 -            2

6000504   General              Storage Shed Roof                                                                                   -            2
New3      General         Large Communal deck area                                                                1999           2019           4         $300,000

New1      General        Storage Shed Fit-Out & Fittings                                                                           -            2

New2      General     Lifeguards Building Fit-Out & Fittings                                                                       -            2




                                                                                                                                                             Page 34

Section 36

ANNEX F: NOOSA COUNCIL CRITICALITY MATRIX
Noosa Council Criticality for Assets
 Consequence        Consequence         Insignificant = 1                 Low = 2                     Moderate = 3                       High = 4                    Extreme = 5
   Category            Rating
                     Weighting
1   Health and     To be defined by   Injuries requiring first      Minor illness/injuries      Immediate admission to              Multiple moderate                Death.
    Safety         council                aid treatment.             requiring medical         hospital and/or emergency            injuries requiring        Permanent total disability.
                                                                        treatment.                     evacuation.                   hospitalisation.
                                                                                                 Short term (reversible)         Life threatening injury.
                                                                                                 impact on health/body            Possible permanent
                                                                                                         function.                      disability.
                                                                                               Multiple medical treatment        Severe and irreversible
                                                                                                    injuries/illnesses.           loss of quality of life.
2   Compliance     To be defined by     Potential specific       Regulator issuing warning     Regulator issuing corrective      The public bringing legal    The public bringing class
                   council             control weakness –         improvement notice for       action/directive/show cause          action (not a class                action.
                                            no breach                non-compliance.                      action.                         action).              Conviction recorded
                                           established.                                                                           Regulator intervention,       against company or
                                       Regulator/external                                                                                stop work                     officer.
                                      auditor ‘observation’                                                                        immediately/cease             Potential jail term.
                                      or request for further                                                                              activity.            Loss of key operating
                                           explanation.                                                                                                               licence.
3   Levels of      To be defined by   No customer impact         Community Impact for < 6           Community Impact               Community Impact              Community Impact
    Service        council                                               hours                           > 6 hours.                     > 12 hours                    > 24 hours
4   Financial      To be defined by           < $25k                       < $50k                         < $100k                        < $500k                       > $500k
                   council
5   Reputation     To be defined by      Public concern          Infrequent negative local      Sustained negative local           High level negative           Significant adverse
                   council                restricted to                   media                         media                     attention from multiple       national/international
                                           complaints                                                                                  media outlets                    media
6   Business       To be defined by     Short term loss of        Loss of critical functions    Loss of critical functions for   Loss of critical functions    Loss of critical functions
    Interruption   council            critical functions, able        for up to 4 hours          up to 12 hours some data            for up to 36 hours         for 7 days or more May
                                           to be repaired/         Issue repairable using        may be lost or corrupted.        Large scale or multiple         require support from
                                        reinstated within 2      normal arrangements and       Issue may require specialist       interruptions to normal      external service provider
                                                hours                     resources                 resources to resolve            business functions        Large scale loss of critical
                                       Normal/acceptable         Some key staff turnover in       Above average turnover              Severe turnover                  employees
                                            staff turnover            close succession          Infrequent industrial action.       Sustained industrial
                                                                 Specific localised morale                                       action within a particular
                                                                            issues                                                     business area




                                                                                                                                                                            Page 35

Section 37

Noosa Council Criticality for Assets
Consequence        Consequence         Insignificant = 1               Low = 2                  Moderate = 3                  High = 4                   Extreme = 5
  Category            Rating
                    Weighting
7   Environment   To be defined by         Negligible               Minor localised         Material environmental     Serious environmental       Long-term environmental
                  council            environmental impact.       environmental impact.               harm.                    Impact.                        harm.
                                       Returned to pre-         Returned to pre-existing   Returned to pre-existing    Detrimental impact on        Unable to return to pre-
                                       existing condition       condition within 1 week.   condition within 1 month.        area of high              existing condition.
                                        within 24 hours.                                                               conservation value or
                                                                                                                        special significance.
                                                                                                                       Return to pre-existing
                                                                                                                         condition within 3
                                                                                                                              months.
8   Strategic     To be defined by   No material impact on        Up to 10% strategic        11% - 50% strategic         51% - 70% strategic            >70% of strategic
                  council            strategic initiatives or   initiatives and KPIs not     initiatives will not be     initiatives will not be   initiatives or KPIs will not
                                              KPIs                         met             achieved or breach of KPI   achieved or multiple KPI            be achieved
                                                                                                                                  breach




                                                                                                                                                                  Page 36

Section 38

Likelihood and Triggers
              Objective               Weightings           Insignificant = 1                Low = 2                  Moderate = 3                   High = 4                 Extreme = 5
                                    To be defined           No corrective                                         10 to 20% needs              20 to 40% needs              >50% requires
             Condition                                                              5% needs corrective
                                     by council             maintenance                                               corrective            corrective maintenance     corrective maintenance
             Assessment                                                                maintenance
                                                         required (Condition                                        maintenance              or renewal (Condition      or renewal (Condition
             Overall                                                                (Condition Grade 2)
                                                              Grade 1)                                           (Condition Grade 3)                Grade 4)                   Grade 5)
             Effective              To be defined
             Operating               by council                                                                                              Protocols exist, but no
Likelihood




                                                                                                                Known improvements                                      No protocols currently
             Protocols/                                        Optimal                   Satisfactory                                        QA/QC / Limited to No
                                                                                                                     needed                                            exist / No Best Practise
             Established Best                                                                                                                    Best Practise
             Practice (1)
                                    To be defined
                                     by council                                      Asset: <2 reactive           Asset: 2-5 reactive                                    Asset: >12 reactive
                                                            <10% reactive                                                                    Asset: >5-12 reactive
                                                                                      (unplanned) work             (unplanned) work                                    (unplanned) work order
                                                          (unplanned) work                                                                  (unplanned) work order
             Reliability                                                             order events within          order events within                                     events within 12
                                                         order events within                                                                events within 12 months
                                                                                         12 months                    12 months                                               months
                                                             12 months


                                    To be defined
             Capacity and                                Sized correctly for                                         Over capacity                                         Unable to meet
                                     by council                                     Under utilised (Time)                                     Over utilised (Time)
             Utilisation (3)                             meeting conditions                                           (Volume)                                               capacity
Trigger




                                    To be defined           New - optimal                                            Parts must be          Parts probably available
             Obsolescence            by council                                      Technology change                                                                 Parts are not available
                                                             technology                                              manufactured              from other utilities
             Annual                 To be defined
                                                               <10% of                   10-20% of                    20-30% of             30-50% of replacement      >50% of replacement
             Maintenance             by council
                                                          replacement cost            replacement cost             replacement cost                 cost                      cost
             Cost (4)
             Notes:
             1 Includes Design standards, standard operating procedures, O&M manuals, maintenance checklists, etc.


             2 Includes availability of parts and written plan to find in-stock parts, and obtain parts from others includes Procurement ability


             3 Capacity relates to volume, quantity or flow; utilisation relates to the amount of time asset is in-use.


             4 Includes all maintenance costs, both planned and unplanned.




                                                                                                                                                                               Page 37

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.