Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                   Noosa Council
                                                                           Asset Management Plan
                                                                             Noosa Aquatic Centre
LIFECYCLE MANAGEMENT PLAN
Assets
The Noosa Aquatic Centre was constructed in 1999 and featured:

   50m tiled pool with wet-deck soiled water return systems;
   Free form 20 x 15m LTS Program Pool, complete with a wading and bubble pool area;
   Concrete formed sand filter comprising 8-cells with proprietary multiport auto-flow valve;
   Automated water chemistry monitoring and dosing system;
   Three end-suction water circulation pumps sharing a common discharge manifold;
   Bulk chlorine storage area;
   Two heat-pumps providing water heating.



Additional capital works were undertaken in 2000 to separate the 50m and Program Pools. The new
Program Pool plant included:

   The separation of the soiled water return hydraulics and the fabrication of a dedicated balance
    tank;
   Installation of three vertical sand filters;
   A dedicated water circulation pump;
   An additional water chemistry and control and dosing system;
   A dedicated heat-pump for pool water heating.
A further upgrade was completed in 2006, including the building of an additional 25m pool. This
pool included dedicated filtration, heating and chemical dosing systems. The original bulk chlorine
storage was upgraded to meet the additional disinfection load demands.

In addition to the above, a number of assets have since been acquired, constructed or upgraded
including:

   Construction of shade structures;
   The formalisation of an overflow carpark;
   The upgrade of gym equipment.




                                                                                          Page 10
Log in to download the original file

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.