Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                Noosa Council
                                                                                        Asset Management Plan
                                                                                          Noosa Aquatic Centre

                                       Condition by Number of Assets
             35
                                                                                                  5
             30                                                                                   4

             25                                                                                   3
                                                                                                  2
             20
                                                                                                  1
             15

             10

              5

              0
                             LTS                  25M                50M                General

                                      Figure 1: NAC Condition by Number of Assets


The breakdown of replacement costs by asset condition is depicted in the graph below. The
importance of this graph is to identify the value of each asset condition and where future investments
are required to renew or rehabilitate the NAC assets. There are a number of high valued assets at
condition 4 associated with the 50m pool; the timing and renewal of these assets will be addressed
in the asset renewal plan that is included in this AMP and, will be reflected in Council’s 5 – 10 year
Capital Works Program.


                         NAC Asset Condition by Replacement Costs
             $1,200,000.00
                                                                                                  5
             $1,000,000.00                                                                        4
                                                                                                  3
              $800,000.00
                                                                                                  2

              $600,000.00                                                                         1


              $400,000.00

              $200,000.00

                    $0.00
                                        LTS             25M             50M             General


                                   Figure 2: NAC Asset Condition by Replacement Costs




                                                                                                      Page 12
Log in to download the original file

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.