Asset Management Plan
Noosa Aquatic Centre
Condition by Number of Assets
35
5
30 4
25 3
2
20
1
15
10
5
0
LTS 25M 50M General
Figure 1: NAC Condition by Number of Assets
The breakdown of replacement costs by asset condition is depicted in the graph below. The
importance of this graph is to identify the value of each asset condition and where future investments
are required to renew or rehabilitate the NAC assets. There are a number of high valued assets at
condition 4 associated with the 50m pool; the timing and renewal of these assets will be addressed
in the asset renewal plan that is included in this AMP and, will be reflected in Council’s 5 – 10 year
Capital Works Program.
NAC Asset Condition by Replacement Costs
$1,200,000.00
5
$1,000,000.00 4
3
$800,000.00
2
$600,000.00 1
$400,000.00
$200,000.00
$0.00
LTS 25M 50M General
Figure 2: NAC Asset Condition by Replacement Costs
Page 12