Asset Management Plan
Noosa Aquatic Centre
RISK MANAGEMENT PLAN
The risk management plan is a coordinated approach to the management and control of risk by
Noosa Council.
Critical Assets
The identification of critical assets is based on the consequence of failure multiplied by the likelihood
of failure; as adapted from the International Infrastructure Manual 2015 Section 3.2.4. For an
indicative draft table of risk measures refer to
ANNEX F: NOOSA COUNCIL CRITICALITY MATRIX.
Risk Assessment
It is important to have a good understanding of the risks associated with the operations of the NAC.
The top three asset related risks are:
Failure to meet water quality standards resulting in closure.
Circulation pump failure to the 25m or LTS Program Pool (no redundancies whereas 50m does
have).
Heat pump failure (during cooler months).
These risks and all other current risks are documented in the Branch Plan - Community Facilities -
Noosa Aquatic Centre 2017/18.
Page 18