Asset Management Plan
Noosa Aquatic Centre
PLAN IMPROVEMENT AND MONITORING
Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through Technology One asset information
management system.
Improvement Program
The following initiatives are recommended:
1. Asset Inventory – Ensure that there is one single asset register/hierarchy that captures all
parent and child assets; at a level of the lowest or appropriate repairable unit. All other duplicated
asset lists/registers should be eliminated. The T1 is the Enterprise Asset Management
Repository. Prior to the revaluation, it is recommended a detailed asset register and data
reconciliation project establishes a single point of truth for asset data within T1.
2. Condition Assessments – Consideration for more detailed condition assessments, to include
all assets other than the pool related assets already assessed. Investigate the potential for
implementing regular electronic condition assessments on mobile devices for use in a formal
renewal plan and improve record keeping.
Condition assessments for the civil infrastructure that supports the NAC such as carparks,
street/flood lighting, pathways and non-specific pool equipment should be incorporated in future
condition inspection routines.
3. Master Planning – Management has identified the need to develop a 10-year masterplan in
order to ensure a strategic approach to asset enhancement and management. The masterplan
should be given greater priority to ensure that future upgrades, expansions and acquisitions of
new assets are aligned to the overall direction of the facility.
4. Asset Systems - An initial implementation of work orders for reactive work has been completed
by management. However, there is still a significant number of functions of the T1 system that
would improve the operational and maintenance activities and further improve the asset
management objectives of the organisation. These include:
i. Planned maintenance work orders;
ii. Costings via work orders;
iii. Inspections and defects logged within T1;
iv. Asset performance reporting from T1.
5. Customer Surveys – the continued delivery of surveys across the various programs delivered
will ensure that the NAC continues to meet the overall needs of the Noosa Community.
6. Renewal and Maintenance Plans – Plans must be regularly reviewed and incorporated into
the annual budget process. Continued inspections and recording of asset condition and
maintenance activities are key to achieving this initiative.
Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.