Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Planning Report - Boiling Pot brewery

Attached to the e-mail Amended DA Form & Report - MCU18-0157.msg.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Table 3: Summary of development aspects
 Material change of use

 Building height           No Change

 Gross floor area (GFA)    Existing building includes 400m2 Gross Floor Area and mezzanine
                           storage. Proposed fitout includes a total gross floor area of 454m2.
 Parking                   Existing Parking = 8 spaces (1 per 50m2).
                           Proposed Parking = 14 equivalent spaces (including 4 scooter bays)
                           and capable of servicing up to 17 equivalent spaces.
                           Bicycle Parking = 5 racks (to be provided adjacent to waste storage
                           area)
 Proposed     servicing Servicing and deliveries using a Pantech design vehicle (6m x 2.4m)
 arrangements           between 7am – 4pm, which can be parked internally after 4pm.
                        A waste storage and screened bunded wash down area is located
                        adjacent the loading dock entrance.
                        The site is connected to all relevant electrical, telecommunications,
                        sewerage and water services.
 Trading Hours             Industrial Business Activities – 7am to 4pm (when staff required for
                           the brewing process).
                           Entertainment & Dining – 9am to midnight (staff only onsite for the
                           entertainment and dining facility).
 Landscaping               Over 20% of the site is to be landscaped, with parking areas setback
                           (on average) more than 2m from the property boundaries.




Figure 3: Proposed Site Plan


                                                                                     Page 7 of 10
Log in to download the original file

Planning Report - Boiling Pot brewery.pdf · 875 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.