Skip to the record
For the highest quality transcripts.

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

6.3) Additional aspects of development
U1 Additional aspects of development are relevant to this development application and the details for these aspects

that would be required under Part 3 Section 1 of this form have been attached to this development application
LJ Not required

6.4) Is the application for State facilitated development?
(1 Yes - Has a notice of declaration been given by the Minister?

[No

   

Section 2 — Further development details

 

7) Does the proposed development application involve any of the following?

 

 

 

 

 

Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot C1 Yes — complete division 2

Operational work M Yes — complete division 3

Building work C1 Yes — complete DA Form 2 — Building work details

 

Division 1 — Material change of use

Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument

8.1) Describe the proposed material change of use

 

Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

 

8.2) Does the proposed use involve the use of existing buildings on the premises?

LJ Yes

LINo

8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
C1 Yes — provide details below or include details in a schedule to this development application

CI No

Provide a general description of the temporary accepted development Specify the stated period dates
under the Planning Regulation

 

      

 

 

 

 

 

 

 

Division 2 — Reconfiguring a lot

Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?

9.2) What is the nature of the lot reconfiguration? (tick al applicable boxes)

(1 Subdivision (complete 10) CO Dividing land into parts by agreement (complete 11)

(1 Boundary realignment (compiete 12) CO Creating or changing an easement giving access to a lot
from a constructed road (complete 13)

   
 

   
      

 

 

 

 

 

  
  

) Queensland
Government
Log in to download the original file

DA Form 1.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.