STORMWATER TO UNDERGROUND TANKS
\ (48,000 Ltr. POTAL CAPACITY)
ie

=

 

[

|

 

 

 

 

 

 

 

 

 

 
 

8 =i 15,170 8 LEGEND
WATER TANK OVERFLOW TO sP191680 g 3] GARAGE WALL SET-BACK ALONG BOUNDARY Z Ss sing Ts O para connensmet D
STORMWATER CONNECTION (Vacant) Si t s oy | . of building operations. Me
= "2. |-—% z Stormwater iain — seemmes—=sae0m — A.G— drain: .
F °% Stormwater disposal —- - — ~ —— Sewer pipe
Existing Fencing —t——+ Feneing by
THIS AREA 10 BE FENCED FOR | Underground power O— Grated drain

 

 

 

DURATION OF CONSTRUCTION

™

 

 

600!
BATTER TO
BOUNDARY

MIN,

©

TREE
T-0.1
H-10m.
S1m

~!

SP191680

44
ay
STABILIZATION OF BATTER BY

CUSTOMER IF/ WHEN REQUIRED
BY AV JENNINGS/ LOCAL AUTHORITY

 

 

HWS

 

 

 

 

 

 

 

 

 

     
 
 
  
 
 
     
        
  
 
  
  

 

% 1
2,
2 .
—— STORMWATER To

CHANELL & KERB

or

Sy

| Spreet \

—
Wy
: Youod = ec.
—.
”

 

   

 

 

 

 

 

 

 

5 ‘s

Pi

B

a

=

> '

OF

, mel

4 el |
rhs 10

KERB OUTLET

 

 

 

 

  

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: MIN 200mm FREEBOARD
SITE CUT & FILL LEVELS MAY VARY QUE 7O SITE CONDITIONS.

 

DETAILS
DATUM ASSUMED: RL = 50.09 RL
CONTOUR INTERVALS: 2.25 Metres

WATER CONNECTION: @Y THE BUILDER)

20mm line from water meter to entry point.

WASTE DISPOSAL: (YE BUILDER)

Connection to mains sewer in accordance with

focal authority requirements.

ROOFWATER DISPOSAL: @Y THE aLLDER)

Connection of all downpipes to underground drain,
Position of roofwater lines.are indicative only and

May vary depending on site.

POWER CONNECTION:

Installation to underground line by the builder,
Connection of power to main line by Electricity
Authority.

EARTRWORKS: (8Y THE GUILE) AG Drains: 0 Metres

Cut and fill to create levet building platform.

Remove spoil from site

Earthworks indicated on the plan are for construction
purposes only.

GAS CONNECTION:

Instaltation of line to gas authority nominated gas bottle
position by the builder. Connection and installation of gas
bottles by Gas Authority upon application by the owner.

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

if LOCAL AUTHORITY: NOOSE SHIRE COUNCI,
’ e +
Se 3) TITLE PARTICULARS:
‘ ’ £¢e.j4 lor: OWPLAN: ..SP191680
5 ! eer eee Pee nen no 2 ag Sp sss ath 6 Be nT
oral Vs 5 \4e0e0: ee °7.00 SckzZ I S +. zao2 a Beat | vo: rre6me........ Parish: NOOSA
r~ 51.407 5, % ‘e, “8 S Is Cay 5 re g NS a ne |, COUNTY: . MARCH
1) % °+ ° | 88 ae %.%, % bm 82 BE
1,500 | 1 | aa ° is “op a Gy Zo sy | LOCATION:
FASCIA MIN. ! ' 3 tot 5 { MAP REFERENCE: UBD Map 1 Ret R3
& PARALLEL | ‘ 3191680 If 14,260 © -—— STENCILLED CONCRETE DRIVEWAY
1,990] (Vacant) 1 BARGE MIN. (MAX 1:4 BATTER FOR TAR cess
watt MIN STABILIZATION OF BATTER BY- | { 15,170 , 5 )
& PARALLEL CUSTOMER IF/ WHEN REQUIRED t GARAGE WALL SET-BACK ALONG BOUNDARY 4
BY AV JENNINGS/ LOCAL AUTHORITY zl :
LEGEND 3
Le UGHTPOLE FENCE zo! KEYS
° mame al
oP ORIGINLA PEG Rep ROCK RETAINING WALL TREE R EMOVAL BY OWNER 5 I €2) 3x OP's TO CHARGED STORMWATER
AXTBM TEMPORARY BENCHMARK = SSS TIMBER RETAINING WALL PRIOR TO CONSTRUCTION S| : LINE TO RAINWATER TANK J
OPP POWER POLE -O STORM WATER PIPE COMMENCEMENT :
oO FIRE HYDRANT oO GAS SUPPLY {
Oo AIR VALVE = BARRIER KERB LINE ‘
© _ SEWER MANHOLE A SURVEY CONTROL MARK DISCLAIMER: THIS CONTOUR PLAN MUST BE READ IN CONJUNCTION WITH THE FIXED PRICE CONTRACT {
ica] ROOFWATER PIT © STORMWATER MANHOLE PHOTOGRAPHS SUPPLIED IN THE SITE SURVEY REPORT. AMENDMENTS | RESIDENCE FOR: , a
POWER BOX Oo PERMANENT SURVEY MARK NO "AS CONSTRUCTED" SEWER INFORMATION WE 1 Rob Mackenzie & April Seymour SITE P. LAN LH & 01-1
" MATION WE RECEIVED FOR THIS PLAN AT Lot 6 Laguna Street
2 TELSTRA PIT S GULLY GRATE 2 g < SCALE: 1.200
cross OVER WATER TAPAWATERWVALVE TIME OF SURVEY. SEWER LINE LOCATION UNDETERMINED. 3 Boreen Point THE BREEZE WAY RETREAT 250 conrempo :
~~~ HEADWALL P SIGN (AS SHOWN} AVJennings Properties Limited CESIGN] ELEV {accom| SPEC | CAR } CONTRACT No: 402525
— —~ SEWER LINE STORM WATER LINE 7 5 ABN 50 004601 503 sos {| t | 3269 | 0 1 DA FPO FPC
horse yy aleve rower ne NOTE: SURVEY ON ASSUMED DATUM ONLY 5 56 Jepheon Streat foenang 4066 Sua SSE aR onaear OTT SOF
AHDD NOT I Telephone: (07) 3361 3777 — - .
= goTTOM oF Bank 6 beNgTeS BOLLAROS OT AVAILABLE AT TIME OF SURVEY 7 Facsimile: (07) 3361 3787 GEN 14/a/04  |OAS 23/9/04, Acclaim
8 ©) copyaiGit 2007 REPRODUCTION IN PART OR WHOLE FORBIDDEN Rh: 1 34/8/04

 

 

 

 

 

 

 

 

 

 

 

PLN File Saved 05/10/2007, 13:19 [Hemminc |

 

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2323 - MCU - Detached House [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.