Skip to the record
Beware of cheap imitations.

Council archive · source document

07/2323 - MCU - Detached House [As Published] · 132007.2323

of 64

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 . Pari A, Version 3.0, 3 September 2007

Table L

 

 
      

 

   

 

 

 

 

iz

OFFICE USE ONLY
[bateireceived

PlOlG - oe

 

pfefes| AMOI T

 

 

   

| [Rete

FOR COMPLETION SY ASSESSM=
isa QLeave Notification and Payment Form required for this application?

Cl No’
LI Yes - em

Table M

 

e numbe

 

 

iT MANAGER

Tabie M

 
 

 

 

 

 

 

 

 

 

 

 

   

lol&

 

 

 

  

WOTIFICATION OF ENGAG

 

 

 

 

 

 

 

 

 

 

 

Advice for completing Part A

 

General advice :

¢ — Under IPA, section 3.2.1(7) mandatary requirements must be correctly completed for a development application to bé a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.

« Completion of Part A of Form 4 is required for all development applications. Other mandatory requirements, applicable to certain types of
applications, are stated in other Parts of Form 1. ,

« The IDAS Assessment Checklist must also be completed for alt development applications, other than those fequiring assessment against the
Building Act 1975 only.

* For further information about completing this form go to IDAS Guide + (Making and IDAS application)

Qt + The premises, the subject of the application, may be identified in a number of ways, Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.

+ The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
Structure is situated on the land). The term ‘land! is also defined to include the estate in, on, over or under the land.

+ Addescription of the land is not required if the application relates to a mobile and temporary Environmentally Retevant Activity (ERA) ‘only,
Instead complete-Q1{a); -- = = en ee ne se wae ee eee

+ Strategic Port Land is within a local government area but a local government's planning scheme does not apply an Strategic Port Land.
Strategic Port Land is declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 14 (Development
on strategic port tand) and the Queensland Transport (Ports) website. .

2 * Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from Property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. : . .

+ __Eastings and notthings using GDAS4 datum is preferred, but longitude and latitude and other (specified) datum may be provided, |

 

 

 

 

 

 

 

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2323 - MCU - Detached House [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.