Original source · versioned page text
Attachment F - Natural Hazards Overlay Code - Flood
Attachment F – Natural Hazards and Natural Resources Overlay Code Development Permit for Material Change of Use Transport Type 2 Carpark situated at 4 - 8 and 16 Lower Mill Road, Cooroy and described as Lot 5 on SP213104 and Lot 7 on SP173771 Building design and building form O23 Development ensures that building design S23.1 Buildings and materials and surface Not applicable and built form accounts for the potential flood treatments used below the defined flood risks and are resilient to flood events by— event are resilient to water damage and do a) ensuring building materials used have high not include wall cavities that may be water resistance and will improve the resilience susceptible to the intrusion of water and of a building during and after a flood event; and sediment; b) maintaining a functional and attractive street S23.2 Buildings are designed to integrate front address appropriate to the intended use. well with the street level and the levels of adjoining properties to facilitate pedestrian flows and visual and physical connectivity between the footpath and ground floors; S23.3 Buildings incorporate appropriate screening to ensure that any under-storey is not visible from the street, where such screening does not impede flood water flows; S23.4 Residential buildings minimise risk from flooding by providing parking and other low intensive, non-habitable uses at ground level; S23.4 Non-residential buildings and structures are oriented to the street by activating the street frontage with appropriate uses and urban design treatments such as recessed wall treatments, screening or landscaping, whilst allowing for flow through of flood waters on the ground floor. Disaster Management O24 Development supports, and does not S24.1 Development does not— The carpark is unlikely to be used in terms unduly burden, disaster management response a) increase the number of people calculated of flood due to restricted access. A Flood or recovery capacity or capabilities. to be at risk from flooding; Management Plan is able to be prepared b) increase the number of people likely to to address actions to minimise any risks need evacuation; for the development. c) shorten flood warning times; or d) impact on the ability of traffic to use evacuation routes, or unreasonably increase traffic volumes on evacuation routes. Noosa Council Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment F - Natural Hazards Overlay Code - Flood.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.