Council archive · source document
Geotechnical Investigation · MCU24/0153
3. Method of Investigation As part of our assessment, a desk-top study was carried out comprising a review of published geological maps, slope stability studies as well as Noosa Council (NC) planning overlays and site information. An experienced geotechnical engineer from Tectonic undertook a site walk-over on 6 September 2024 to visually assess any indicators of past slope instability. The walk-over included assessment of soil exposures, surface drainage conditions, topography, evidence of erosion or past instability, and vegetation coverage/condition. This was followed by a subsurface investigation comprising the drilling of four boreholes (designated BH1 to BH4) in accessible areas across the site. Borehole BH1 was drilled on the existing driveway toward the western boundary of the site using Tectonic’s 4WD mounted solid flight auger rig to a depth of 8 m below ground level (BGL). Due to access restrictions boreholes BH2 to BH4 were drilled using hand augering techniques to 3 m BGL to the north, east and south of the site. A further two boreholes, designated BH2A and BH2B were drilled to a depth of 1 m BGL to attempt to delineate rubbish encountered in the area during a previous soil test by another firm. In-situ testing, using the dynamic cone penetrometer (DCP) method, was carried out from the ground surface and within each borehole. DCP testing was extended below the base of the hand augered boreholes to depths between 4.5 m and 6.0 m BGL. Boreholes were backfilled on completion with drilling spoil, with excess material slightly mounded at surface. Laboratory classification testing was not warranted due to the sandy nature of the subsurface conditions encountered. Borehole locations are shown in Figure 1 attached at the end of this report, with borehole and DCP logs presented in Appendix A, together with explanatory notes. Subsurface conditions are discussed in Section 4.4. Borehole coordinates were recorded using a handheld global positioning system (GPS). The results of the desk-top study and walk-over survey are included in Section 4 below. 4. Results of Investigation 4.1 Site Description The site is formally described as Lot 403 RP48112, covering an area of 755 m2, with frontage to Elanda Street to the west. At the time of the investigation a two-storey residential building occupied most of the western part of the site. The building was surrounded by at-grade concrete pathways and slabs with some garden spaces. Neighbouring properties consisted of two to three storey residential unit buildings to the north, east and south. An alleyway and drainage easement along the southern boundary provided pedestrian access between Elanda Street and Henderson Street to the east and also accommodated hydraulic services including stormwater and sewer mains. Inferred cut and fill earthworks had taken place across the site and adjacent areas. The site had been levelled with cut to fill earthworks up to about 2 m high supported by retaining walls along the northern and southern boundaries. Cut to fill estimated to be up to about 1 m was observed to form retained garden terraces. Proposed Unit Development 30 September 2024 | 24265-001-Rev0 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical Investigation.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.