Council archive · source document
07/0604 - Response to Information Request [As Published] · 142007.604
@ Page2 Comment: tem 4; Comment: item 5: Comment: item 6: Comment: item 7: the proposed development, and that the proposed development complied with the relevant parts of the Court Order 12592DA. The applicant acknowledges that Council can not approve the subject application should it conflict with Development Approval 12592 DA. IPA Law is currently preparing a request to alter the relevant conditions and approved plans of this Court Order. The outcome of this request will be forwarded immediately upon receipt. Council is requested to continue with the assessment of the Operational Works application. It is noted that during a Pre-Lodgement Meeting held with Neil Blamey and Ron Read on 16 January 2007, it was advised that the applicant would only be required to alter the conditions of the MCU approval, and that a changes to the existing Landscaping Approval would not be necessary. . Please provide a plan indicating the extent of any existing vegetation to be removed on the site or interfered with in the road reserve. Please provide the engineering design and details with regard to slope stability and stormwater run-off referred to in your application prepared by Ashley Davey, Reinhold Koenning and Peter Rienmac. Further retaining wall detail should also be included. Included as Attachment 3 are the following: * Slope Stability Assessment prepared by Ashley Davey from Golder Associates; + Engineering details prepared by Peter Reinecker from Reinmac Consulting Civil & Structural Engineers; and + Stormwater Management Plans prepared by lan Bradford Plumbing Consultants, It is noted that the Hydraulic Engineer has provided advice that the eastern most water tank would not be able to be gravity feed, and accordingly it has been deleted from proposal plans. This is reflect in all plans with the exception of the Engineering Details. The applicant is happy for these plans to be notarised accordingly. Please provide a cross section of any earthworks required for installation of the rainwater tanks, in particular the upper tank, and the proposed colours of the rainwater tanks, and cross sections of earthworks of the proposed pool and retaining wall development. Plans included as Attachment 4 provide a cross-section of the rainwater tanks. It is noted that as they are proposed to be established on timber platforms, no significant earthworks are proposed. These tanks are to be constructed from zincalume. It is considered this building material is appropriate for the site, as it reflects the traditional Queensland vernacular form and design sought for the Noosa region. Further it is noted that these tanks are setback the maximum distance possible from all adjoining neighbours, and will be screened by the approved road front brush fencing. Please provide a professionally prepared Landscape Plan indicating the number and distribution of plants, spacings, pot sizes and plant schedule for the areas affected by the proposed development. The plan should be based on the Landscape Concept Plan provided with the application. Itis not proposed to remove or interferé with any Vegetation Idcated within the road-reserve-~ —--- - eee Me te to
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0604 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.