Council archive · source document
07/0604 - Response to Information Request [As Published] · 142007.604
Rev| Date _| Issued] Details Sketch Design :)
Vv
legend ‘
ST1 Stone Cladding - dark slate to match existing
sT2
Stone Cladding - ‘feildstone' brown / grey
ST3 Stone Cladding - pool & ponds - grey / green
Frameless Glass - pool fences and balustrades
Titanium Zinc - dark grey
Timber Battens / Boards - oiled deep brown
, 2x 16 000 Itr zincalume rain water tanks
support on hardwood post and frame base.
Installation will require holes to be drilled
__ for harwood posts, Tanks will be crained
4 into position from pool construction area.
No earthworks besides post holes will be
required for rainwater tanks
cg parton De ony a New pool and site works Scale 00@A3, UU Sid
sparks architects leorecpotstae com 20 Bayview, Noosa Heads, QLD Thomas Muster 004 DS 6 July 07 1 | South Elevation SD 2.2
“peta i Bohn 2 247 project dient jobno. | drawn date of firstissue | drowing dwg no.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0604 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.