Original source · versioned page text
2019-02-21 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 21 FEBRUARY 2019
ENVIRONMENTAL HEALTH
Waste Management
50. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”. The facilities must include an external
impervious area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is
required with a cold-water tap, hose and drain outlet connected to sewer, via a
bucket trap. The drain outlet must be designed to prevent storm water entry to the
sewerage system. This can be achieved with a nib wall 50mm high and up to
700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed,
or any other design approved by Council.
51. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
Mechanical Equipment
52. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following:
a. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
b. Pumps
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
10pm to 7am: No audible noise.
53. The certification must be submitted to Council, which certifies that operational
noise from any fixed plant and equipment complies with the requirements of this
Decision Notice
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
7 FURTHER REPORT - ENVIRONMENT GRANTS POLICY
That Council note the report by the Environmental Services Manager to the Planning &
Environment Committee meeting dated 12 February 2019 and the further report to the General
Committee meeting dated 18 February 2019 and:
A. Adopt the Environment Grants Policy as set out in Attachment 1 to the report to the
General Committee meeting dated 18 February 2019 with the addition of the following
words:
“CONDITIONS OF FUNDING
All successful applicants will be required to enter into a funding deed of agreement with
Council and acquit funds within the allocated timeframes. The timeframes and acquittal
requirements are outlined in the supporting Grant Guidelines for the specific funding
program. Successful applicants will be required to actively and publicly acknowledge
Council’s support.”
Page 19 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.