               56.    Operating roof water harvesting tanks must be provided for the development. The tanks must
                      be provided in accordance with an Operational Works approval and must include in
                      particular:
                      a.      a total tank capacity of 54,000 litres
                      b.      a catchment of not less than 2,000m2 of the building roof area
                      c.      re-use of harvested stormwater for non-potable outdoor uses including irrigation of
                              landscaped areas and swimming pool top-up.


               67.    The development site must be landscaped in accordance with a Council endorsed landscape
                      package prepared by a qualified person*. The works must be undertaken in accordance with
                      an Operational Works approval and the Noosa Plan for that specific area and must include
                      in particular:
                      a.      the works shown on the Approved Landscape Concept Design Package Plans, with
                              the inclusion of the requirements of the approved Bushfire Hazard Assessment and
                              Mitigation Plan version 8, prepared by Rob Friend and Associates dated 25.02.2025.
                      b.      Plant Pallet including hard and soft plant percentages, plant numbers, planting
                              locations, pot sizes and whether Noosa Native, Australian Native or Exotic;
                      c.      a Landscape Management Plan including (but not limited to):
                              i.       landscape design principles for bushfire hazard areas in Part 5 of Bushfire
                                       Resilient Building Guidance for Queensland Homes (QRA 2020);
                              ii.      Certification from a qualified* person ensuring the Landscape Management Plan
                                       complies with the design principles in the Part 5 of Bushfire Resilient Building
                                       Guidance for Queensland Homes (QRA 2020) and the Bushfire Management
                                       Plan.
                              iii.     Management of branches overhanging building envelopes.
                      d.      clear integration of the Bushfire requirements and recommendations identified within
                              the approved Bushfire Hazard Assessment Report & Mitigation Plan version 8 dated
                              25.02.2025, including landscaping treatments where maximum distances are permitted
                              including:
                              i.       the band of vegetation up to 20 metres to the north of the Resort Hotel and
                                       fronting Resort Drive will be reinforced with landscaping that contain 100% less
                                       flammable plant species.
                              ii.      the remaining area greater than 20m from Resort Drive can contain no less than
                                       50% less flammable plant species in the understory and groundcover; and
                              iii.     regular maintenance of groundcover and understorey to reduce flammability
                                       within the landscaped area.
                      e.      clear integration of the landscaping recommendations, for the purpose of odour
                              mitigation, identified in the Katestone report dated December 2020.
                      f.      A vegetated buffer of a height that avoids line of sight contact with the Sewage
                              Treatment Plant from any place or structure on the development site to Council’s
                              satisfaction.
                      g.      Both sides of Resort Drive Road Reserve between the intersections of Links Drive and
                              Lakeview Rise must be rehabilitated and revegetated in accordance with the
                              landscaping recommendations of the approved Bushfire Hazard Assessment and
                              Mitigation Plan version 8, prepared by Rob Friend and Associates dated 25.02.2025.




Document Set ID: 23969548
Version: 5, Version Date: 30/07/2025


[OCR of page images]
56. Operating roof water harvesting tanks must be provided for the development. The tanks must
be provided in accordance with an Operational Works approval and must include in
particular:

a. a total tank capacity of 54,000 litres
b. a catchment of not less than 2,000m2 of the building roof area

Cc. re-use of harvested stormwater for non-potable outdoor uses including irrigation of
landscaped areas and swimming pool top-up.

67. The development site must be landscaped in accordance with a Council endorsed landscape
package prepared by a qualified person*. The works must be undertaken in accordance with
an Operational Works approval and the Noosa Plan for that specific area and must include
in particular:

a. the works shown on the Approved Landscape Concept Design Package Plans, with
the inclusion of the requirements of the approved Bushfire Hazard Assessment and
Mitigation Plan version 8, prepared by Rob Friend and Associates dated 25.02.2025.

b. Plant Pallet including hard and soft plant percentages, plant numbers, planting
locations, pot sizes and whether Noosa Native, Australian Native or Exotic;

Cc. a Landscape Management Plan including (but not limited to):

i. landscape design principles for bushfire hazard areas in Part 5 of Bushfire
Resilient Building Guidance for Queensland Homes (QRA 2020);

ii. Certification from a qualified* person ensuring the Landscape Management Plan
complies with the design principles in the Part 5 of Bushfire Resilient Building
Guidance for Queensland Homes (QRA 2020) and the Bushfire Management
Plan.

iii. | Management of branches overhanging building envelopes.

d. clear integration of the Bushfire requirements and recommendations identified within
the approved Bushfire Hazard Assessment Report & Mitigation Plan version 8 dated
25.02.2025, including landscaping treatments where maximum distances are permitted
including:

i. the band of vegetation up to 20 metres to the north of the Resort Hotel and
fronting Resort Drive will be reinforced with landscaping that contain 100% less
flammable plant species.

ii. the remaining area greater than 20m from Resort Drive can contain no less than
50% less flammable plant species in the understory and groundcover; and

iii. | regular maintenance of groundcover and understorey to reduce flammability
within the landscaped area.

e. clear integration of the landscaping recommendations, for the purpose of odour
mitigation, identified in the Katestone report dated December 2020.

f. A vegetated buffer of a height that avoids line of sight contact with the Sewage
Treatment Plant from any place or structure on the development site to Council's
satisfaction.

g. Both sides of Resort Drive Road Reserve between the intersections of Links Drive and
Lakeview Rise must be rehabilitated and revegetated in accordance with the
landscaping recommendations of the approved Bushfire Hazard Assessment and
Mitigation Plan version 8, prepared by Rob Friend and Associates dated 25.02.2025.

Document Set ID: 23969548
Version: 5, Version Date: 30/07/2025

Log in to download the original (Negotiated Report MCU21 0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.