Negotiated Report MCU21 0110.pdf
Condition 56
Water quality and quantity
Operating roof water harvesting tanks must be provided for the development. The tanks must be
provided in accordance with an Operational Works approval and must include in particular:
a. a total tank capacity of 135,000 litres
b. a catchment of not less than 2,800m2 of the building roof area
c. re-use of harvested stormwater for non-potable outdoor uses including irrigation of
landscaped areas and swimming pool top-up.
Applicant’s comments:
The original rainwater harvesting tank volume was based on the evaporation rates calculated for
a significantly larger pool surface area. The size of the swimming pools was reduced significantly
as part of the minor change. In particular, the pool surface area has reduced by approximately 60%
and a revised capacity of 54,000 litres reflects this proportional change.
Although part of the landscaped areas within the hotel may be irrigated from the freshwater
harvesting, a significant proportion on the landscaped areas would be irrigated from the Noosa
Springs irrigation system that draws water from the freshwater lakes of Noosa Springs. It is noted
that any rainwater not harvested and stored in the tank at the hotel would flow into the drainage
system that eventually discharges into the freshwater lakes of Noosa Springs. Therefore, using
that Noosa Springs lake water for irrigation purposes is making productive use of the rainwater
harvested in another manner and does not require use of potable water.
The combined roof areas of Pavilions 1 to 4 of the hotel has a total of 2,439m2 . Reducing the
minimum catchment area to say 2,000m2 is reasonable and provides for some areas that may not
be efficiently drained to the rainwater harvesting catchment. In any event, a smaller catchment is
consistent with the lower volume of water proposed to be stored in the preceding subclause.
Applicant’s request:
Please replace 135,000 litres with 54,000 litres consistent with the amended pool design having
a substantially reduced surface area.
Amend the reference in the subclause of ‘2,800m2 ’ to ‘2,000m2 ’
Assessment of Representation
The condition was applied as part of the consideration of the original 106 room hotel and was not
amended when the development was scaled back to 69 bedrooms. It is acknowledged that a
reduction in the stormwater harvesting requirements to reflect the reduced building and swimming
pool footprints is appropriate. Accordingly, it is agreed to amend the condition as requested by the
applicant.
Condition 67
Document Set ID: 23969548
Version: 5, Version Date: 30/07/2025
[OCR of page images]
Condition 56
Water quality and quantity
Operating roof water harvesting tanks must be provided for the development. The tanks must be
provided in accordance with an Operational Works approval and must include in particular:
a. a total tank capacity of 135,000 litres
b. acatchment of not less than 2,800mz2 of the building roof area
c. re-use of harvested stormwater for non-potable outdoor uses including irrigation of
landscaped areas and swimming pool top-up.
Applicant’s comments:
The original rainwater harvesting tank volume was based on the evaporation rates calculated for
a significantly larger pool surface area. The size of the swimming pools was reduced significantly
as part of the minor change. In particular, the pool surface area has reduced by approximately 60%
and a revised capacity of 54,000 litres reflects this proportional change.
Although part of the landscaped areas within the hotel may be irrigated from the freshwater
harvesting, a significant proportion on the landscaped areas would be irrigated from the Noosa
Springs irrigation system that draws water from the freshwater lakes of Noosa Springs. It is noted
that any rainwater not harvested and stored in the tank at the hotel would flow into the drainage
system that eventually discharges into the freshwater lakes of Noosa Springs. Therefore, using
that Noosa Springs lake water for irrigation purposes is making productive use of the rainwater
harvested in another manner and does not require use of potable water.
The combined roof areas of Pavilions 1 to 4 of the hotel has a total of 2,439m2 . Reducing the
minimum catchment area to say 2,000m2 is reasonable and provides for some areas that may not
be efficiently drained to the rainwater harvesting catchment. In any event, a smaller catchment is
consistent with the lower volume of water proposed to be stored in the preceding subclause.
Applicant’s request:
Please replace 135,000 litres with 54,000 litres consistent with the amended pool design having
a substantially reduced surface area.
Amend the reference in the subclause of ‘2,800m2 ’ to ‘2,000m2’
Assessment of Representation
The condition was applied as part of the consideration of the original 106 room hotel and was not
amended when the development was scaled back to 69 bedrooms. It is acknowledged that a
reduction in the stormwater harvesting requirements to reflect the reduced building and swimming
pool footprints is appropriate. Accordingly, it is agreed to amend the condition as requested by the
applicant.
Condition 67
Document Set ID: 23969548
Version: 5, Version Date: 30/07/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Negotiated Report MCU21 0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.