Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2 Lakeway Drive, Information RESPONSE March 2022

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Following the completion of the construction process, we plan to revegetate with native plant
species to enhance the overall habitat.




As previously noted, the area of the dwelling, driveway, shed and effluent disposal is on previously
cleared land. We would describe the land as open wooded grassland.

A total of 5 trees will need removal for the effluent disposal, pool and dwelling. No tree removal is
required for the driveway and the preexisting shed. Please see our adjusted arborist and house plan
that are attached.




As per the above information. The house has been designed as a split level to decrease the need for
extensive cutting and filling. We estimate that cut and fill will be no more than 600mm.

The entire project will require the removal of 5 trees only – one for the effluent disposal system and
four for the house dwelling and access to it. We do not believe there will be any impact upon the
retained vegetation within the site.




According to our discussions with the arborist, the fill will have no impact on the root zone of the
retained nearby trees.



We hope this provides you with all of the information that you have requested.
Log in to download the original file

2 Lakeway Drive, Information RESPONSE March 2022.pdf · 755 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.