ORDINARY MEETING MINUTES                                                           16 JUNE 2022


    11.   The vegetation protection covenant areas within each Lot must result in an area of not
          less than the areas detailed within the Locality and Site Plans 21598-P001 Rev D
          prepared by TOD Consulting Engineers and Project Managers and as amended by
          conditions of this approval.
    12.   If a provision included in the covenant document is requisitioned or refused registration
          by the relevant titles authority, a substitute provision must be included in the document
          which as nearly as practicable addresses the objective sought by the requisitioned or
          refused provision. The wording of the substitute provision must be agreed by Council.
    Staging
    13.   The development is to be staged in accordance with the Locality and Site Plans 21598-
          P001 Rev D prepared by TOD Consulting Engineers and Project Managers and as
          amended by conditions of this approval with proposed Lot 8 requiring rehabilitation to be
          installed in accordance with an Operational Works Approval prior to the sealing of the
          Survey Plan for Stage 1.
    14.   Stage 2 area must be maintained and managed until commencement of Stage 2 to not
          cause environmental impacts including but not limited to erosion and sediment control,
          weed invasion control, fire mitigation measures (e.g. mown grass).
    Land Rehabilitation
    15.   Rehabilitation works must be undertaken in accordance with the Approved Vegetation
          Management and Covenant Area Rehabilitation Concept plan and in accordance with an
          Operational Works approval and the Noosa Plan 2020 and Planning Scheme Policy -
          PSP 2 Landscaping with the exception of:
          15.1    The inclusion of additional maintenance schedule requirements within the
                  Vegetation Management and Covenant Area Rehabilitation Concept plan
                  including:
                  15.1.1   Weed management to maintain a weed free zone around each planted
                           tubestock, mulch replenishment when required. Watering when
                           required.
                  15.1.2   Tree guarding of species susceptible to fauna damage.
                  15.1.3   Replacement of all dead tubestock.
                  15.1.4   3 Monthly (or as required) weed maintenance within the assisted
                           natural regeneration areas.
          15.2    The inclusion of additional rehabilitation Performance Objectives including:
                  15.2.1   Rehabilitation works must meet the following Performance Criteria for:
                           a.    Year One – 12 months after installation:
                                 i.     Planted trees have achieved an average height of 1m.
                                 ii.    Planted shrubs have achieved an average height of 0.4m.
                           b.    Year Two - 24 months after the installation:
                                 i.     Planted trees have achieved an average height of 2m.
                                 ii.    Planted shrubs have achieved an average height of 1m.
                           c.    Year Three - Final acceptance installation:
                                 i.     Planted trees have achieved an average height of 3m.
                                 ii.    Planted shrubs have achieved an average height of 1.2m.
                                 iii.   Canopy and / or vegetative strata must not be devoid for
                                        any area greater than 1.0m2 within any 10m2 sample.


                                                                                  Page 17 of 43
Log in to download the original file

2022-06-16 Ordinary Meeting Minutes(PDF, 1MB).pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.