ORDINARY MEETING MINUTES 16 JUNE 2022
works must be undertaken in accordance with an Operational Works approval,
completed prior to the commencement of the use and must include in particular:
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
b. removal of all existing property access (driveway/crossovers) and reinstatement of
the kerb, footpath and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed
Site Access and Driveways
33. A sealed access driveway must be provided from the formation in Hofmann Drive to all
parking and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with Council standard drawing RS-
051 and any associated addendums
b. access aisles and ramps in accordance with AS/NZS2890.1:2004 Parking
Facilities
Car Parking, Pedestrian and Bicycle Facilities
34. A maximum of 134- car parking spaces must be provided and marked on the site and
made available and accessible at all times. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. Minimum 9 visitor parking spaces and 4 motorcycle/scoter spaces within the total,
which are clearly marked for that purpose and accessible at all times for visitor use.
These spaces must be located outside of the basement.
b. 3 disabled parking space within the total
c. dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004 Parking Facilities
35. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include a 2
metre wide concrete footpath within the Hofmann Drive road reserve extending across
the full frontage of the sites and connecting to the new pathway to the east of the site.
This condition is imposed pursuant to s145 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.
36. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
i. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
ii. proposed fencing to the site during the construction phase of the
development
iii. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
iv. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
Page 35 of 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.