Original source · versioned page text
Appendix D- Engineering Assessment
ws PA Comet 11 1A 13 Tile No: Plans generated 01 Jun 2023 by Pelicancorp TicketAccess Software | www.pelicancorp.com ¢ 7 ¢ 7 Coorgy Connection Road / 4’ 4’ —— , Sequence No: 225352170 Job No: 34328300 Location: 5 Pearl Street, Cooroy, QLD 4563 52 5 / 7 | 45 I) 7 Legend 1 Stormwater Chamber ! @ Manhole ' & Pearl Street / @ Pit e- j A Water Quality ’ A Structures ot ; Stormwater Pipe 48 x —— Pipe oO 5 Allotment § ace Culvert 5 ua a — — TeleComm Networks —— Open Drain =~ © Flood Alert Station Pipe 6 8 12 4 fe B 7 @ of ee 7 16 7 yy === | eachate Rising Main Pearl Lane ° 7 Water Quality + - Easement Covenant , Scale: 1:1000 \ Expires: 29 Jun 2023 DISCLAIMER: While reasonable measures have been taken to ensure the accuracy of the information contained in this plan response, neither Noosa Council nor PelicanCorp shall have any liability whatsoever in relation to any loss, damage, cost or expense arising from the use of this plan response or the information contained in it or the completeness or accuracy of such information. Use of such information is subject to and constitutes acceptance of Cooroy,- Noosa Road Diamong Street 2 4 6 6 6 1D 14] these terms. AU.Noosa C (QLD) - Response Plan.docx (22 Mar 2023)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.