Original source · versioned page text
Appendix D- Engineering Assessment
2 Cable Plan %
“<o ut
—P35 0.5
OC|10mm]
2xOC[ 6mm]
P5010.0
OC[ 4mm]
OC[16mm]
OC[10mm]
Cl 4mm TOU7802
Cl23mm] (5)
, P5010.0
OC[ 4mm]
SE1-SE12
SHOP1-SHOP10">~
U1-U8
Mc 1.0
OC[10mm]
3xOC[23mm]
E80 15.5
OU tum]
7S
3 P20 30.0
3 OC|13mm] se
3 a Ng
Report Damage: https://service.telstra.com.au/customer/general/forms/report-damage-to-telstra-equipment Seq uence Number: 2253521 76
Ph - 13 22 03
Email - [email protected] -cCj . ;
Planned Services - ph 1800 653 935 (AEST bus hrs only) General Enquiries CAUTION: Fibre optic and/ or major network present
TELSTRA LIMITED ACN. 086 174 781 in plot area. Please read the Duty of Care and
contact Telstra Plan Services should you require
Generated On 01/06/2023 14:45:27 any assistance.
The above plan must be viewed in conjunction with the Mains Cable Plan on the following page
WARNING
Telstra plans and location information conform to Quality Level "D" of the Australian Standard AS 5488-Classification of Subsurface Utility Information.
As such, Telstra supplied location information is indicative only.Spatial accuracy is not applicable to Quality Level D.
Refer to AS 5488 for further details. The exact position of Telstra assets can only be validated by physically exposing it.
Telstra does not warrant or hold out that its plans are accurate and accepts no responsibility for any inaccuracy.
Further on site investigation is required to validate the exact location of Telstra plant prior to commencing construction work.
A Certified Locating Organisation is an essential part of the process to validate the exact location of Telstra assets and to ensure the asset is protected during construction works.
See the Steps- Telstra Duty of Care that was provided in the email response.
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.