Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix D- Engineering Assessment

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

2 Cable Plan %

“<o ut

  
   
   
   
  

—P35 0.5
OC|10mm]

2xOC[ 6mm]

 

P5010.0
OC[ 4mm]

  
   
    

OC[16mm]
OC[10mm]

Cl 4mm TOU7802
Cl23mm] (5)

, P5010.0
OC[ 4mm]

   
  
    
   
  

    

 
 
  
 

SE1-SE12
SHOP1-SHOP10">~
U1-U8

   
   
   

Mc 1.0
OC[10mm]
3xOC[23mm]

  

        
   

E80 15.5
OU tum]

 

 

 

 

 

 

 

 

 

7S

3 P20 30.0

3 OC|13mm] se

3 a Ng
Report Damage: https://service.telstra.com.au/customer/general/forms/report-damage-to-telstra-equipment Seq uence Number: 2253521 76
Ph - 13 22 03
Email - [email protected] -cCj . ;
Planned Services - ph 1800 653 935 (AEST bus hrs only) General Enquiries CAUTION: Fibre optic and/ or major network present

TELSTRA LIMITED ACN. 086 174 781 in plot area. Please read the Duty of Care and
contact Telstra Plan Services should you require
Generated On 01/06/2023 14:45:27 any assistance.
The above plan must be viewed in conjunction with the Mains Cable Plan on the following page
WARNING

Telstra plans and location information conform to Quality Level "D" of the Australian Standard AS 5488-Classification of Subsurface Utility Information.

As such, Telstra supplied location information is indicative only.Spatial accuracy is not applicable to Quality Level D.

Refer to AS 5488 for further details. The exact position of Telstra assets can only be validated by physically exposing it.

Telstra does not warrant or hold out that its plans are accurate and accepts no responsibility for any inaccuracy.

Further on site investigation is required to validate the exact location of Telstra plant prior to commencing construction work.

A Certified Locating Organisation is an essential part of the process to validate the exact location of Telstra assets and to ensure the asset is protected during construction works.

See the Steps- Telstra Duty of Care that was provided in the email response.

 

Page 1 of 2

 
Log in to download the original file

Appendix D- Engineering Assessment .pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.