Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Sandpiper Appendices 010915 · 132007.1181.02

Attached to the e-mail 132007.1181.02 Change to existing approval.

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Sandpiper

- the beach front boundary alignment, and the Hastings street alignment at ground
level was surveyed.
- the Hastings street alignment is a fully built environment.
- the mean ground level from 4 surrounding levels is RL4.19m
- the roof apex height was measured from 4 roof apexes due to its architecture and
averaged to be RL17.49m
- the roof apexes were measured from levelled survey stations external to the site
- the Height of the roof at its apex to the mean ground level is 13.3m
- Survey Datum: Origin PM is PM162023 and is an AHD levelled mark with a height of
RL2.082m and was checked by PM152276 with a height of RL3.319m.



Downes Group Pty Ltd, registered Consulting Surveyor, hereby confirms the above
results.

Please do not hesitate contacting me for further details should you wish.



kinds regards




Yours Faithfully,




Tony Vella

Operations Manager
Registered Land Surveyor, Qld.
Email: [email protected]

Mobile: 0407416454

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Sandpiper Appendices 010915.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.