Original source · versioned page text
Representations
Attached to the e-mail Representations to Decision Notice MCU16/0066 & OPW16/0133.
Wednesday, 8 March 2017 Our Ref: 16161 / Office: Sunshine Coast Council Ref: MCU16/0066 & OPW16/0133 NOOSA COUNCIL PO BOX 141 TEWANTIN QLD 4565 ATTENTION: The Chief Executive Officer Dear Sir REPRESENTATIONS ON DECISION NOTICE DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FOR RETAIL BUSINESS TYPE 2 SHOP & SALON, RETAIL BUSINESS TYPE 5 VEHICLE USES AND ENTERTAINMENT AND DINING BUSINESS TYPE 1 FOOD & BEVERAGE DEVELOPMENT PERMIT FOR OPERATIONAL WORK (ADVERTISING SIGNAGE) 6 TAYLOR COURT, COOROY LOT 3 SP197517 Further to recent correspondence with Council, I am pleased to set out the applicant’s representations on the above mentioned Decision Notice dated 23 January 2017. Council records will show that the applicant’s appeal period was suspended on 9 February 2017. The representations relate to two (2) conditions in the Decision Notice and are discussed below. Condition 2 Condition 2 references the approved plans for the development. The submitted Signage Plan (DA-08 Rev P5, prepared by Red Dog Architects, dated 19.10.16 – enclosed here) is not included in the list of approved plans in Condition 2. Subsequent discussions with Council’s Development Planner, Glen Conforti, have confirmed that the Signage Plan was intended to be included as an approved plan. It is requested that Condition 2 is amended to reference the submitted Signage Plan. Condition 27(e) From the outset, it is reiterated that the applicant intends to incorporate a “best practice” stormwater design for this site and is committed to working with Council to achieve an outstanding and sustainable development. The applicant’s civil engineer does however have some concerns with the current wording of condition 27(e) and requests clarification on the requirements of the condition. Covey Associates prepared the original Stormwater Management Plan that accompanied the development application and has since prepared the attached correspondence outlining the concerns with condition 27(e). Covey Associate’s correspondence requests clarification as to how the Plan of Development’s water quality targets (as referenced in condition 27(e)) were determined and what regulations or guidelines they are linked to. Covey Associates’ explain the differences between “concentration based outcomes” and “load based reduction targets”. Given the time that has passed since the adoption of the Plan of Development, it is possible that the guidelines that the POD’s water quality targets are linked to have been superseded
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.