SUNSHINE COAST REGIONAL COUNCIL

        APPROVED
 MCU       11/0168   27 Sep 2011


[OCR of page images]
“LANDSCAPE SPECIFICATION

Proposed Tapley Residence - Lot 34, Noosa Dunes,

EXTENT OF WORKS

Contractor should take full account of documentation of Civil
Engineering, Hydraulic Engineering and Electrical Engineering
Works. Landscape works are to include the following:

Topsoil - Supply and incorporation

Shaping of garden areas

Containerised Plant Material - Supply and installation
Garden Mulch - Supply and Spread

Turf Supply & Lay

Maintenance of landscape works (90days)

OARON >

1. TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to be progressively filled with premium
grade blended organic garden soil mix. Soil to be “organic
garden mix" type. Soil supplier as well as intended mix

is to be nominated. Soil is to be mounded to facilitate good
drainage to hardstand areas (max. 1:3 grade) and is to finish
50mm below edging after settlement. Organic additive
"dynamic lifter" or similar is to be incorporated throughout the
soil mix at the recommended rate.

Aslow release fertiliser such as "osmocote" or its equivalent is
also to be incorporated with individual plantings in accordance
with the manufacturers recommendations.

2. SHAPING OF GARDEN AREAS / TURF MOUNDS
Planting areas are to be fin ished in a gently mounded fashion
to facilitate drainage of excess water and to show planting to
best advantage. Contractor is to seek confirmation of finished
levels prior to final plantings and application of mulch.

All garden beds to be well drained. Drainage shall be provided
for in areas of that stay saturated for extended periods to the
potential detriment of plantings.

3. CONTAINERISED PLANT MATERIAL

Plant material is to be approved by superintendent prior to
planting. Planting is to be carried out in a manner consistent
with good horticultural practice. All trees are

to be guyed and staked as _ per Detail ~ Advanced

Container Planting. Smaller plant stock is to be staked as
necessary. Stakes shall not pass through rootball of plant at
time of planting or any time thereafter.

 

NOTE:

GENERALLY TREES OUTSIDE THE
BUILDING ENVALOPE AREA ARE
TO BE RETAINED.

 

 

 

 

PLANT STOCK NOTES
Container sizes are noted with Pots in millimetres & Bags in litres.

Stock may be rejected if plants are:

a) Undersized proportional to specified container size or
if the root system is underdeveloped
b) Oversized proportional to specified container size or
severely root bound
c) Unbalanced or unchara cteristic of normal or specified
growth pattern for the species
d) Not suitably acclimatised for the specific environment
e) diseased, infested with pests or suffering from other Formed
form of significant stress Water
Well
4, GARDEN MULCH
Organic Mulch :Muich shall be Tea Tree Fines mulch to Tutt to
to a predominant depth of 100mm after settlement. or spade

cut edge

100

5. TURF - SUPPLY AND LAY

a. Empire Zoysia "Sapphire" (or similar approved)
minimum sod depth - 25 mm.

b. Turf to be laid within 24 hours of being cut.

c. Allow for ground preparation and deposition of 50 mm
imported garden loam topsoil. Apply Dynamic Lifter or
equivalent as per manufacturers recommendations,

d. Turf to be close butted and rolled in accordance with

min 900
(Generally 2x
Depth of rootball)

accepted practice to ensure a smooth even surface. 8
6. MAINTENANCE OF LANDSCAPE WORKS Ensure pit
a. Monitor plant performance and st ress constantly and take edges are

appropriate remedial action. Soil moisture levels are porous

critical during early establishment.

b. Prune and shape all shrubs and trees as required PLANTI NG DETAIL _ ADVANCED STOCK NTS

ie, Clear trunk to 1200mm & damaged branches
c. Remove all stakes at 90 day inspection

 

 
 
 
  
  

 

NOTE:

Advanced tree stock planting
selection to Noosa Shire Council
approval and guidelines.

 

 

 

2100 x 75 x 75 Hwd stakes. All
stakes to be chamfered, centrally
pointed & driven vertically into
the ground outside the rootball

Approved securing material such
as Rubber tree ties or 50mm

\ jutemat/hessian ties in figure 8
] loops secured loosely to tree &
fixed to stake with flathead galv.
nails

100mm nom. composted organic
mulch or NSC approved. Form
shallow dish drain to base of tree.
Mound at pit edge

 

 

 

 

Tree pit to be excavated to min.
900 depth and backfilled with
=~. 100 friable imported topsoil with

~ 20% organic content, light
compaction only.

 

 

(Max 2% organic content). Backfill
original subgrade material, light
compaction only. Rootball to sit
on top of backfill

 

 

Slow release fertiliser to
manufacturers specifications

Cultivate subgrade to 150 depth

 

 

 

 

 

 

approx, 2x root ball width
(tSenerally 2x width of rootbalh

 

 

 

 

 

 

 

 

 

 

 

 

 

d. Fertilise all garden beds at 3 months (low phosphorus type) ~\
e. Contractor shall maintain an up to date written log book {-
to record inspection observations and actions. SUNSHINE COAST REGIONAL COUNCIL
B COUNCIL PLANNING APPLICATION 25/07/11
A P P ROV E D B BODY CORPORATE SUBMISSION 28/06/14
* HEIGHTS SHOWN TO RELATIVE TO AHD.

MCU 11/0168 27 Sep 2011 A BODY CORPORATE SUBMISSION 24/06/11

\ issue Comments Date /

 

 

 

Landscape Specification

 

PLANT SPECIES SELECTION:

PLANT SPECIES HAVE BEEN SPECIFICALLY

SELECTED FOR THIS HASTINGS ST PROJECT:

- THAT ARE NATIVE OR NATURALISED TO THE NOOSA AREA

TOLERANT OF THE HARSH COASTAL ENVIRONMENT

PERFORM SPECIFIC FUNCTIONS AS PART OF THE PLANTED LANSCAPE,
INCLUDING, SHADE, FRAMING, BORDER DEFINITION AND SCREENING
ARE AESTHETICALLY PLEASING AND FIT THE LANDSCAPE STYLING

FIT WITHIN AND ARE SIMILAR TO THE NOOSA DUNES

STREETSCAPE REDEVELOPMENT

'

 

PROPOSED TAPLEY RESIDENCE
Lot 34, Noosa Dunes

fostercesigns

ARC-0.13 -B

 

 

 

DATE PRINTED: 25-07-2041

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPROVED PLANS MCU11_0168 & OPW11_257.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.