Skip to the record
Accept no imitations.

Original source · versioned page text

RFI - Black & More - Stormwater Management Plan

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Allotment Overland Drainage
 There is insignificant ground surface surrounding the building and it generally falls toward the street. There are no defined
 surface drainage channels and it is considered storm water sheet flows toward the street in these locations.
 The car parking area surface was severely damage and had many low spots. A severely clogged PVC pipe was found in the
 carparking surface, see photo below. It could reasonably be assumed that this was once a surface water drainage pit/pipe for
 this carpark. It is also likely that this pipe is connected to the roof water pipe which outlets to the kerb. Although this detail is
 unknown.




195 Weyba Road SMP
                                                                                                                                    5
Log in to download the original file

RFI - Black & More - Stormwater Management Plan.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.