Original source · versioned page text
Massing Design
Very large file (15.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
58500
ROOF PP ROOF PP
58100 57500 58100
2700
ROOF TERRACE ROOF TERRACE
300
55400 55400
UPPER PP UPPER PP
55100 55100
3300
UPPER LVL UPPER LVL
300
51800 51800
GROUND PP GROUND PP
51500 51500
3300
GROUND LVL GROUND LVL
300
48200 LOWER PP
48200
47900
LOWER PP
47900
4000
45810
EXISTING MH TO
BE DEMOLISHED
LOWER LVL 43400 LOWER LVL
43900 NEW MH 43900
D
MOLISHE
SEW ER TO BE DE
EXISTING
EXISTING SEWER
40240
NEW SEWER
IL 40500
APPROX
IL 40200
APPROX
ELEVATION 4
SCALE: 1 : 100
58500
ROOF PP ROOF PP
58100 57500 58100
2700
ROOF TERRACE ROOF TERRACE
300
55400 55400
UPPER PP UPPER PP
55100 55100
3300
UPPER LVL UPPER LVL
300
51800 51800
GROUND PP GROUND PP
51500 51500
3300
GROUND LVL GROUND LVL
300
48200 48200
LOWER PP LOWER PP
47900 47900
ELEVATION 3
SCALE: 1 : 100
CLIENT: Heidi Meyer PROJECT: Picture Point
www.chriscloutdesign.com.au GENERAL NOTES:
Use written dimensions only. DO NOT scale drawings. Contractors SITE ADDRESS: Lot 2 on RP220514, 39 Picture Point Cres, Noosa Heads QLD 4567
A: OFFICE 1/20 DUKE STREET, to verify all dimensions on site prior to commencing works. Site
SUNSHINE BEACH, QLD 4567, location in accordance with engineers details. These drawings are to DRAWING TITLE: ELEVATIONS
be read in conjunction with engineers design and details, the
E: [email protected] DATE: 04.11.22 SCALE: 1 : 100 @ A2 DRAWN BY: C.CLOUT
P: (07) 54748 107 BSA LICENCE: 1127508
accompanying building specification and schedule of finishes. If in
doubt, please request clarification. DO NOT ASSUME. ISSUE: PRELIMINARY CONCEPT
C2.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.