Council archive · source document
15 Elanda St · OPW13/0108
Attached to the e-mail Development Application for permit to damage vegetation - OPW13/0108.
IDAS form 1;
(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)
This form must be used for ALL development applications.
For all development applications, you must:
°* complete this form (IDAS form 1—Application details)
* complete any other forms relevant to your application
® Provide any mandato:
application.
Attach extra Pages if there is insufficient Space on this form.
Ty supporting information identified on the forms as being required to accompany your
All terms used on
Regulation 2009.
this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is re.
ni
‘sponsible for ensuring the information Provided on all IDAS application forms is correct.
Any developme it permit or Preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)
Names (individual or company name in full) \
For companies, contact name VARIG BS SOMO <
Postal address
mandatory requirement)
Sse _ QOD roe TASS]
Country (if other than Australia) [| FT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
Fax number (non-mandatory requirement)
e-mail address (non-mandatory requirement)
Applicant’s reference number (non-mandatory
requirement)
What is the nature of the development? (Please only tick one box.)
C] Material change of use C] Reconfiguring a lot im Building work KSerationa work
b) Whats the approval type? (Please only tick one box.)
C) Preliminary approval 1] Preliminary approval CK ctopment
under s241 of SPA under $241 and 5242 permit
of SPA
What is the level of assessment? (Please only tick one box.)
QO Impact assessment Cc] Code assessment
Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—Additional
aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
L] Material change of use C] Reconfiguring a lot LC Building work C Operational work
b) What is the approval type? (Please only tick one box.)
fey Preliminary approval [ Preliminary approval [7] Development
under $241 of SPA under s241 and 5242 permit
of SPA
c) Provide a brief description of the Proposal, including use definition and number of buildings or structures where
applicable (€.9. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
Whats the level of assessment?
J impact assessment [] Code assessment
Page 3
No—continue to question 3
[] Yes—complete Table D and then 90 to question 6
[WY Street address and lot
On plan (All lots must be listed.)
LC] Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, €.g. jetty, pontoon. All lots must be listed)
Street address Lot on plan
description
Lot Unit Street Post- Lo} Plan type
no. no. code and plan no.
t no.
ENBA ST! |i Re
Planning scheme detail:
Separate row in the belo
Local government area
(e.g. Logan, Cairns)
Street name and Official
suburb/ locality name
0) ee
Page 4
Table F—premises coordinates (Appropriate for development in remote areas, over Part of a lot or in water not
adjoining or adjacent to land €.g. channel dredging in Moreton Bay.) (Attach a Separate schedule i
Space in this table.)
Coordinates
(Note: place each set of
Local government
area (if applicable)
Coordinates in a Separate row.)
6. Are there any curren
mandatory requirement.)
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land
Ve
Page 5
By making this application, |,
application.
8. Does the application involve a State resource? (E.g. the application involves taking water or quarry material, or
interfering with the flow Of water. Refer to the Notes at the end of this form for more information) (Non-mandatory
requirement.)
[-] Notidentifieg whether or LC Yes—complete Table J
not the application
involves a State
resource
fm On Brisbane core Port land under the Transport Infrastructure Act 1994 (no table requires completion)
C] On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Name of water body, watercourse or aquifer
Table L
Lot on plan description for Strategic port land Port authority for the lot
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
Page 6
12. Is the Payment of a portable long service le:
Of this form for more information.)
Ko—go to question 14 L] Yes
13. Has the
information.)
C] Yes—complete Table N
receipted QLeave form
Date of written notice given
by local government
(dd/mm/yy)
Reference number of written notice given
by local government (if applicable)
Method of lodgement to
assessment manager
By making this application, | declare that all information in
provide false or misleading information.)
=e
this application is true and correct (Note: it is unlawful to
Page 7
Notes for completing this form
© Section 261 of the Sustainable Planning Act 2009
Question 7
° Section 263 of the Sustainable Planning Act 2009 sets out when the Consent of the owner of the land is required for
an application. Section 260(1)(e) of the Sustainable Planning Act 2009 Provides that if the owner's consent is
required under section 263, then an application must Contain, or be accompanied by, the written consent of the
Owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
¢ Owner's consent is Not required for a mobile and temporary ERA.
Question 8
¢ Ifadevelopment application involves a State resource, the application is not required to be Supported by evidence
of resource entitlement. The allocation or entitlement to the resource is a separate Process and should be obtained
Prior to development commencing.
Question 12
° The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the
e The portable long service leave levy need not be Paid when the application is made, but the Building and
C - : 4 f
permit is issued,
* Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QlLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qid.gov.au,
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
Council. | have been engaged as the private certifier for the
building work referred to in this application
BSA Certification license
number
ici
Date of engagement Building
ON AND PAYMENT (For completion by assessment manager or private certifier if
)
Description of the work QLeave project Date receipted {Name of officer who
Page 8
form sighted by |sighted the form
assessment
The Sustainable Planning Act 2009 is admi
Planning. This form and
istered by the Department of State Development, Infrastructure and
all other required application materials should be sent to your assessment manager and any
referral agencies,
IDAS form 1-
Page 9
IDAS form 6-
(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)
This form must be used for development applications for building work or Operational work assessable against a
Planning scheme.
For all development applications, you must:
°* complete DAS form 1—Application details
* complete any other forms relevant to your application
e Provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra Pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009,
This form must be used for building work or Operational work relating to Strategic port land and Brisbane core port land
Inder the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the Strategic port land, Brisbane
core port land or airport land.
This form can also be completed Online using eDA at Wwww.smarteda.qid.gov.au
Mandatory requirements
Table A
a) Whatis the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, Moving or demolishing a building)?
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
Page 10
Table B
Road works
[J Stormwater CL Water infrastructure
[_] Drainage works [] Earthworks L]_ Sewerage infrastructure
O Landscaping C Signage I clearing vegetation under the planning scheme
C] Other—provide details
b) Is the perational work necessary to facilitate the Creation of new lots? (E.g. Subdivision.)
ne C] Yes—specify the number of lots being created
c) Are there any current approvals associated with this application? (E.g. material change of use.)
ee [-] Yes—provide details below
labour.)
4. Confirm that the following mandatory Supporting information accompanies this applica
Mandatory Supporting information
All applications involving building work and/or Operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are
recommended scales) which shows the following:
¢ the location and site area of the land to which the application relates
(relevant land)
e the north point
required for all lots)
® any existing or Proposed easements on the relevant land and their
function
Page 11
to the application.
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are
recommended scales) which show the following:
e the north point
e the intended use of €ach area on the floor plan (for commercial, industrial
or mixed use developments only)
e the room layout (for residential development Only) with all rooms clearly
labelled
° the existing and the Proposed built form (for extensions only)
e the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1 :100, 1:200 or 1:500 are
recommended scales) which show plans of all building elevations and
facades, Clearly labelled to identi i i
CJ Confirmed
CI Not applicable
[| confirmed
[] Not applicable
LJ Confirmed
LC] Not applicable
CL] Confirmed
C] Not applicable
drawings showing:
° existing and Proposed contours
° areas to be cut and filled
° the location and level of any permanent Survey marks or reference
Stations used as datum for the works
e the location of any proposed retaining walls on the relevant land and their
height
e the defined flood level (if applicable)
°_ the defined fill level (if ap plicable).
Applications for Operational work involving roadworks
Drawings showing:
° existing and Proposed contours
° the centreline or construction line showing chainages, bearings, offsets if
the construction line iS not the centreline of the road and all intersection
points
° information for each Curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, Superelevation (if applicable) and
curve widening (if applicable)
e kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
© edge of pavement where kerb is not Constructed
Position and extent of channelisation
location and details Of all traffic signs, guideposts, guardrail and other
street furniture
@ pavement markings including details on raised pavement markers
° catchpit, manhole and Pipeline locations
© drainage details (if applicable)
°
e
e
C] Confirmed
C] Not applicable
L] Confirmed
[-] Not applicable
Cross road drainage culverts (if applicable)
Concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
ae — a 4, L » 7
3 IDAS form 6. } f ork sab ains| 7 Sci
Page 12
changes in surfacing material.
Drawings showing:
e existing and Proposed contours
© drainage locations, diameters and class of pipe, open drains and
easements
° manhole location, Chainage and offset or Co-ordinates and inlet and outlet
invert levels
° inlet pit locations, Chainage and offset or Co-ordinates and invert and kerb
levels.
CT Confirmed
im Not applicable
Applications for Operational work involving water reticulation
Drawings showing:
e kerb lines or edge of pavement where kerb is not Constructed
° location and levels of other utility services where affected by water
reticulation works
© pipe diameter, type of pipe and pipe alignment
water main alignments
water supply Pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs.
Applications for Operational
Drawings showing:
location of all existing and proposed services
location of all existing and Proposed sewer lines and manhole locations
location of all house Connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
e
e
eo
e
e
° design sewer invert levels
e
e
e
e
e
C Not applicable
work involving Sewerage reticulation
CJ Not applicable
design top of manhole levels
type of manhole and manhole cover
Pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
Sewer pump station details if applicable).
Applications for Operational work involving street lighting
Drawings showing:
° location of all light poles and service conduits
© location of all other cross road conduits
° type of wattage and lighting
© any traffic calming devices
° additional plans for roundabouts and Major roads (if applicable)
° details of any variations to normal alignment
° details of lighting levels.
| Confirmed
[_] Not applicable
Drawings showing:
° any existing light poles and Power poles
° any existing underground Services
° details of proposed services
¢ alternation to existing services.
CL Confirmed
Not applicable
Page 13
Applications for Operational w
Drawings showing:
© the location of Proposed plant species
° aplant schedule indicating common and botanical names, pot sizes and
numbers of plants
° planting bed Preparation details including topsoil depth, subgrade
Preparation, mulch type and depth, type of turf, pebble, Paving and garden
ork involving landscaping works
[] Confirmed
[J Not applicable
the location and type of any existing trees to be retained
Construction details of planter boxes, retaining walls and fences
the proposed maintenance period
irrigation system details.
Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use
of information recorded in this form.
OFFICE USE ONLY
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning.
tials should be sent to your assessment manager and any referral
5 IDAS form 6— g 2K | wo) ssable ag. fan B
Used in these records
15 Elanda St.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.