Council archive · source document
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208
Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCC CORRESPONDENCE 1
1111111111111111111111111
Place barcode here
80602694
THIS IS THE NEXT PART OF A
MULTIPLE PART RECOR At
<O;’~~<D"
~
S 201;
Part _]_ Of "6l
q,
"’fio~e
oev ,1,-. ,~Pp’I! ,~,tLQ!:l
......~,,,. i" I of..
number: ’N\C\..J\’2 CQ.. ’6
I.t\,;r I ’
w
[
C:\Documents and Senings\eje\DesJ...1.op\Multi Part Record Cover Sheet NEXT PART
(3).doc
z 0 O::C 201,
I
!
’~’)
"t I.-<~,_II
f. "".I..~
,,_".. ’... l ""
.
.’
I Box: Q.$)~.:+:.. R: ...2.E?... ...1
~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 46 (of 50)
Page 2
Prepared for
Northbrook Corporation Pty. Ltd.
28 November 2012
<.f)CElrdn
Shaping the Future
~
Page 3
~.... Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
Document Information
Prepared for Northbrook Corporation Pty. Ltd.
Project Name Water Supply and Sewerage Analysis
File Reference Noosa on Weyba WSS Analysis.docm
Job Reference 5101-19
Date 28 November 2012
Contact Information
Cardno (Qld)Pty Ltd
ABN 57051 074992
Level 11 Green Square North Tower
515 St Paul’s Terrace
Fortitude Valley Qld 4006
Locked Bag 4006 Fortitude Valley
Queensland 4006 Australia
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 73369 9822
[email protected]
www.cardno.com.au
Document Control
Version Date Author Author Reviewer Reviewer
Initials Initials
10 Oct 2012 Joshua Lake JL Tod Larwill TL
2 22 Oct 2012 Joshua Lake JL Tod Larwill TL
3 28 Nov 2012 Joshua Lake JL Tod Larwill TL
@ Cardno 2012. Copyright in the whole and every part of this document
belongs to Cardno and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media
to any person other than by agreement with Card no.
This document is produced by Cardno solely for the benefit and use by the
client in accordance with the terms of the engagement. Cardno does not
and shall not assume any responsibility or liability whatsoever to any third
party arising out of any use or reliance by any third party on the content of
this document.
Northbrook Corporation Pty. Ltd. Version 3 28 November 2012
5101-19 Commercial in Confidence Page ii
Page 4
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
Table of Contents
1 Introduction 4
2 Noosa on Weyba Population 5
3 Desired Standards of Service 6
3.1 Water Supply 6
3.2 Sewerage 7
4 Noosa on Weyba Flow Projections 8
4.1 Water Supply Demands 8
4.2 Sewerage Flows 9
4.3 Integration with IWCMP 10
5 Water Supply Network Analysis 11
5.1 Servicing Strategy 11
5.2 External Network 11
5.3 Noosa on Weyba Network 12
6 Sewerage Network Analysis 13
6.1 Servicing Strategy 13
6.2 Network Analysis 13
6.3 Noosa on Weyba Network 16
6.4 Noosa Heads Sewerage Treatment Plant 18
7 Conclusions 20
Appendi s
Appendix A Background Data
Appendix B Unitywater Hydraulic Network Anlaysis
Appendix C Unitywater Response
Tables
Table 2-1 Noosa on Weyba Population Projections 5
Table 3-1 Adopted Water Supply Network Planning DSS 6
Table 3-2 Adopted Sewerage Network Planning DSS 7
Table 4-1 Water Supply Demands 8
Table 4-2 Sewerage Flow Projections 9
Table 6-3 NVL040 Design capacities 15
Table 6-5 Noosa on Weyba Proposed Pump Station Details 17
Table 6-6 Noosa STP Design Capacity and Current Plant Loadings 18
Figures
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results 15
Northbrook Corporation Pty. Ltd. Version 3 28 November 2012
5101-19 Commercial in Confidence Page iii
Page 5
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
1 Introduction
Cardno were commissioned to undertake a water supply and sewerage analysis of the proposed Noosa on
Weyba development.
The Noosa on Weyba development site comprises of 303 hectares, with 139.5 hectares of the site being set
aside for Koala Habitat protection and enlargement of the Noosa National Park and an additional 105.5
hectares to remain as environmental protection land. A Preliminary Approval overriding the Planning Scheme
under Section 242 of the Sustainable Planning Act 2009 is being applied for, for this development.
The net development area comprises approximately 58 hectares made up of Lot 2 on SP179590, Lot 53 on
SP163571, Lot 11 on RP893393 and Lot 12 on RP893393. Theproposed development is planned to
accommodate approximately 2,000 people and is intended to include a mix of residential, retirement living,
age care and retail uses.
The development is not located within the Urban Footprint for the South East Queensland Regional Plan
(SEQRP)and is consequently outside of Unitywater’s headworks area. The site has recently been declared
a Biodiversity Development Offset Area (BDOA). This effectively allows for a development application for a
form of urban development to be submitted on land that is otherwise zoned for rural purposes.
A summary of the BDOA declaration is detailed below:
. On 3 February 2012 the Minister for the DLGP, the Hon Paul Lucas MP, declared the site to be a
Biodiversity Development Offset Area (BDOA)project which determines that 139.5ha of the site is to
be dedicated to the State for perpetual Koala Habitat protection;
. Under the BDOA, the 139.5ha land is called the "Send" land, which then leaves a balance of
163.5ha of gross development land also called the "Receive" land for potential development
approval for a form of urban development;
. The BDOA declaration over-rides the Urban Footprint controls in the SEQRP and determines that a
Development Application (DA)can be lodged over the 163.5ha of Receive land noting that all normal
SPA requirements must be met for DA approval to be properly considered and potentially granted;
The site represents an infill of land between the Urban Footprint to the north and the existing Weyba Downs
large lot residential development to the south.
The proposed development is located within the Sunshine Coast Regional Council (SCRC). SCRC do not
undertake water supply and sewerage planning with the region and all planning is deferred to Unitywater.
Where necessary the relevant codes from either the SCRC or Unitywater have been adopted for this
assessment. This report will detail the overall servicing strategy for water and sewer for the proposed Noosa
on Weyba development. It should be noted that subsequent reporting and confirmation of strategies,
particularly the internal networks will be undertaken when the development application for each precinct is
undertaken.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 4
Page 6
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
2 Noosa on Weyba Population
Sunshine Coast Regional Council (SCRC)utilise an Equivalent Person (EP)population as the basis for their
water supply and sewerage planning.
The proposed development will occur in precincts comprising of a mix of residential uses, detached lots and
multi residential units and aged care facilities. In addition a portion of the development will comprise of non-
residential use; retail and leisure. The proposed development is categorised into four development precincts
as detailed in Noosa on Weyba Precinct Concept Master Plan (MP006),detailed in Appendix A. Each of the
four precincts is comprised of development blocks (A-N) presented in Noosa on Weyba Precinct Concept
Master Plan (MP005) prepared by ML Design detailed in Appendix A. These blocks form the basis of the
development of an EP population for the Noosa on Weyba development.
Based on the relevant Council planning and projected lot yields an EP loading was developed for the site.
The EPs considered for the site are detailed in Table 2-1.
Table 2-1 Noosa on Weyba Population Projections
Quantity EP Density Adopted EP
Residential Lots 549 lots 3.3 EP x lot 1,574
Mixed Use Residential
2.5 EP x lot (assumed 2
(Townhouses/Units/Retirement 327 Units
bedroom unit)
752
Village)
Non Residential 4,435m2 GFA 100 EP per ha 44
TOTAL 2,370
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 5
Page 7
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
3 Desired Standards of Service
Unitywater adopt the South East Queensland (SEQ)Planning Guidelines as the basis for water supply and
sewerage planning. Card no have adopted these guidelines to assess the Noosa on Weyba development.
3.1 Water Supply
The key aspects of the adopted Desired Standards of Service (DSS)for water supply planning are detailed in
Table 3-1.
Table 3-1 Adopted Water Supply Network Planning DSS
Item Detail
Peaking Factors
280 LlEP/d.
Average Day (AD)
Based on 230 LlEP/d + allowance for leakage/losses (50 LlEP/d).
Low/Medium Density High Density
Category Commercial/Industrial
Residential Residential
Mean Day Maximum Month
1.5 1.5 1.5
(MDMM:AD)
Peak Day (pD:AD) 2 2 2
Peak Hour (PH:PD) 2 1.75 1.4
Detached Res (<= 3 stories)- 15Ls for 2hrs w background Demand highest of 2/3
PH or AD
Multi story Res => 4 levels -
30Lls for 4 hours w background Demand highest of
Fire Fighting Flows
2/3 PH or AD
Commercial/Industrial buildings -
30Lls for 4 hours w background Demand of PH
demand (between 10am and 4pm)
21 m at property boundary (under normal operating conditions (PH))
Minimum Pressure
12m min at the main at the hydrant; Min of 6m
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 6
Page 8
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
3.2 Sewerage
The adopted DSS for sewer is detailed in Table 3-2.
Table 3-2 Adopted Sewerage Network Planning DSS
Item Detail
Average Dry Weather Flow (ADWF) 180 LlEP/d
Peak Wet Weather Flow (PWWF) 900 LlEP/d
Minimum velocity @ PDWF 0.7 m/s
Maximum velocity @ PWWF 3 m/s
Gravity Main Design Criteria
Depth of flow @ PWWF 0.75d of pipe diameter
Minimum [email protected] m/s
Rising Main Design Criteria Preferred Velocity 1.0-1.5 m/s
Maximum velocity @ PWWF 2.5 m/s
For SPS with 2 pumps, EACH pump delivers minimum 5 x
ADWF
Pump Station Design Criteria Overflows should not occur at flow < 5 x ADWF or C1 x
ADWF (whichever is the larger).
6hrs at ADWF of "in catchment storage
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 7
Page 9
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
4 Noosa on Weyba Flow Projections
The water supply demands and sewerage flows for the proposed Noosa on Weyba development are based
on the adopted DSS and population projections.
4.1 Water Supply Demands
The projected water supply demands for the Noosa on Weyba development are provided in Table 4-1 below.
Table 4-1 Water Supply Demands
A 38 0.01 0.12 0.5 0.3 30
B 168 0.05 0.54 2.18 1.5 15
C 7 0 0.02 0.08 0.1 30
D 190 0.05 0.62 2.17 1.4 15
E 276 0.08 0.89 3.13 2.1 15
2 F 132 0.04 0.43 1.5 15
2 G 409 0.11 1.33 5.3 3.5 15
3 H 227 0.06 0.74 2.94 2 15
3 670 0.19 2.17 7.6 5.1 15
4 J 3 0 0.01 0.04 0 15
4 K 20 0.01 0.06 0.26 0.2 15
4 L 230 0.06 0.75 2.98 2 15
Total 2,370 0.66 7.68 28.67 19.1 30
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 8
Page 10
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
4.2 Sewerage Flows
The projected sewerage flows for Noosa on Weyba are provided in Table 4-2 below.
Table 4-2 Sewerage Flow Projections
A 38 0.01 0.08 0.26 0.4
B 168 0.03 0.35 0.96 1.75
C 7 0 0.01 0.05 0.07
D 190 0.03 0.4 1.08 1.99
E 276 0.05 0.58 1.5 2.88
2 F 132 0.02 0.28 0.77 1.38
2 G 409 0.07 0.85 2.13 4.26
3 H 227 0.04 0.47 1.26 2.36
3 670 0.12 1.4 3.31 6.98
4 J 3 0 0.01 0.03 0.03
4 K 20 0 0.04 0.14 0.21
4 L 230 0.04 0.48 1.27 2.4
Total 2370 0.43 4.94 12.76 24.69
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 9
Page 11
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
4.3 Integration with IWCMP
An integrated water cycle management plan (IWCMP)has been prepared as part of the Noosa on Weyba
development. This report references Integrated Watercycle Management Plan Noosa on Weyba
Development (Gilbert and Sutherland, August 2012).
The ICWMP considered several servicing options for the development. The Gilbert and Sutherland report
recommends, Option 4 as the preferred servicing strategy. In summary:
Option 4 assumes sewage is treated off-site at the Noosaville STP and maximises rainwater harvesting at
each residence, typical of IWCWMP systems in high rainfall areas. On site rainwater harvesting assists to
achieve a reasonable reduction in potable water demands.
An overview of the Option 4 servicing strategy is provided below:
. Domestic water supply: sourced from the municipal supply and domestic rain tanks (for toilet cisterns
and laundry);
. Wastewater management: sewerage from development precincts to the Noosaville STP;
. Domestic garden irrigation supplied from the domestic rain tanks;
. Roof tank overflow and stormwater flows through bio-retention swales and basins, prior to creek
discharge.
The domestic rain tank system in Option 4 lends itself to staged developments and does achieve compliance
with the demand off-set targets set in the Queensland Development Code.
While the reduction of potable demand via the use of rainwater tanks was considered, the overall sizing of
infrastructure, particularly water supply is governed by the supply of fire fighting flows to the site.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 10
Page 12
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
5 Water Supply Network Analysis
This section details the water supply strategy and infrastructure required to service the proposed Noosa on
Weyba development.
Planning for the Noosa water supply network was generally unavailable. Discussion with Unitywater staff
resulted in a request for Unitywater through their preferred agents to assess the Noosa water supply network
with the addition of the proposed development.
In preparing this water supply servicing strategy consideration was given to the following report prepared by
MWH for Unitywater.
> Noosa on Weyba Water Network Performance Assessment, (MWH,2012).
5.1 Servicing Strategy
The proposed development would connect to the existing network within the Noosa Industrial District Meter
Area (NIDMA)and serviced via the Tewantin Reservoirs.
The existing Noosa water supply network was assessed and with suitable connections to the development
identified. An existing 600 mm diameter trunk main along Eenie Creek Road, is the primary service main for
Noosa and is in close proximity to the proposed development. In addition, an existing residential
development is located immediately north of the proposed Noosa on Weyba development and is serviced via
a 150 mm diameter main. It is proposed to utilise both the 600 mm trunk and the smaller 150 mm diameter
mains to service the development.
A primary service 250 mm diameter main through the development along Walter Hay Drive, is proposed to
connect to the 600 mm diameter trunk main at the intersection of Eenie Creek Road and Walter Hay Drive. A
secondary 200 mm diameter connection is proposed to the 150 mm diameter mains along Lake Entrance
Boulevard currently servicing the properties on the western boundary of the proposed development to assist
in network connectivity.
5.2 External Network
The conclusions of the MWH report were:
> Under maximum hour demand conditions Unitywater DSS were met at the proposed development site
and within Noosa Industrial DMA during the 2038 planning horizon.
> Under fire flow demand conditions Unitywater DSS were met at the proposed development site and within
Noosa Industrial DMA during the 2038 planning horizon.
> The storage assessment identified that the inclusion of the Noosa on Weyba development brings forward
storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS. A total storage
deficiency of the Tewantin Reservoir of 1.64 ML was identified at the 2031 planning horizon.
> No augmentation of the existing network is required.
Further detail of the MWH report can be found in Appendix B.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 11
Page 13
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
5.3 Noosa on Weyba Network
A network of trunk mains and smaller reticulations mains is required to maintain Unitywater’s DSS within the
Noosa on Weyba development. A hydraulic model was developed based on the results of the MWH report.
The network pressures identified in the MWH report have been adopted for the analysis of the Noosa on
Weyba development.
A primary connection to the existing 600mm diameter trunk main along Eenie Creek Road via a 250 mm
diameter main along Walter Hay Drive is proposed. This main will provide the bulk of flow to the development
and is required to maintain non-residential fire flows (301/s)to the development.
A second 200 mm diameter connection to the existing mains at Lake Entrance Boulevard should be
considered. This main would assist in the provision of flow to the western properties within the Noosa on
Weyba development. It is not critical to maintain supply pressures as per the DSS to the proposed
development. However, the main would reduce dead ends in the proposed network. An internal 200 mm
diameter distribution main is proposed to convey flow to each precinct within the development. Some smaller
150 mm diameter mains will be required to maintain the fire flow DSS. The rest of the network would
comprise 100mm diameter mains as required to service properties.
Figure 1, illustrates the NIDMA network and the proposed mains to service the Noosa on Weyba
Development.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 12
Page 14
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
6 Sewerage Network Analysis
This section details the sewerage strategy and infrastructure required to service the proposed Noosa on
Weyba development.
Planning for the Noosa sewerage network was not available for this analysis. Discussion with Unitywater
staff had indicated that planning for the region was out-dated, having last been undertaken in 1996.
However, general consensus with Unitywater was that the network is generally adequate with little operating
issues. Requests for information regarding the Noosa sewerage network in the vicinity of the development
were made to Unitywater and catchment data was provided in order to undertake the analysis.
6.1 Servicing Strategy
The proposed development is within the Noosa Coastal sewerage scheme. This scheme consists of multiple
local catchments that discharge to the Noosa Heads STP.
The Noosaville Industrial catchment is a small local sewerage catchment containing three small pump
stations, discharging to a larger pump station (NVL011). This pump station discharges via a 200 mm
diameter rising main into the trunk gravity mains along Eenie Creek Road. Twin gravity mains convey flow
from the Noosaville Industrial and other catchments to a large pump station NVL040. NVL040 captures flow
from all catchments to the west of Eenie Creek and conveys flow via a 450 mm diameter rising main to the
Noosa heads STP.
It is proposed that the Noosa Weyba development would discharge to the Noosaville Industrial
on
catchment. An initial connection to NVL011 would be via a rising main from the site, with the development to
the west of the site proposed to discharge to the local gravity mains along Lake Entrance Boulevard.
6.2 Network Analysis
Unitywater provided all relevant data to undertake an assessment of the Noosaville Industrial catchment and
the primary conveyance infrastructure to the Noosa Heads STP. This included:
> Pump Station design data (wet well details, pump curves)
> Network GIS
-
Catchment populations
-
Gravity main and rising main data.
6.2.1 Pump Station NVL011
Pump station NVL011 services an existing population of approximately 2,060 EP with minimal growth
projected for the catchment, It will ultimately service 2,900 EP post 2026.
NVL011 pumps through a 200 mm diameter rising main and discharges to twin 600 mm and 525 mm
diameter gravity sewers.
The inclusion of the Noosa on Weyba 2,370 EP represents a doubling of the ultimate catchment population.
An analysis of pump station NVL011 and downstream infrastructure was undertaken to assess the impact of
the development.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 13
Page 15
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
The existing design details of NVL011 and its rising main are shown in Table 6-1.
Table 6-1 NVL011 and Rising Main Design Capacities
’i:m’!m ’i:mJi:II ~ ~rill mmm’1O$1 rill
Iimiim
~ ~ ~[f!mUl ~ ~
aL ~ ~
cmml
ImmiW
-
[iTh’"[id jI ~ ~
~
PI ~ OQ (I Q O
3,2671 341 23.61 22.001 200.00 1.08 15.15
Note: 1. Based on Pump Curve NP3171.181 and design operating point
6.2.1.1 NVL011 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 45%. The increase in population triggers an augmentation of NVL011. Based on the design capacity of
the pump station, it has sufficient capacity to accommodate a portion of the proposed Noosaon Weyba
development after 2016. The spare capacity available at NVL011 represents approximately 20% of the full
yield for the Noosa on Weyba development.
The ultimate size of the NVL011 with the inclusion of the Noosa on Weyba development is presented in
Table 6-2.
Table 6-2 NVL011 Ultimate Capacities
W
=. ~. ’i:mD.’
’.’
_ .., .. 1i!ih1IDfiJt:fi" ~
. ,
’.
.I ..
PJI;,",.W ~ liIIilm
. ..
.
.
.
-
y@ r IIr r~~
(I!Q) [lim - (IImID ~ (I
Ultimate 2,909 30.30 24.50 22.00 200.00 1.08 15.15
Ultimate with
5,280 55.00 41.00 34.00 200.00 1.75 37.04
Development
6.2.2 Eenie Creek Road Trunk Mains
Analysis of the twin trunk 600 m and 525 mm diameter gravity mains along Eenie Creek Road has been
undertaken. A trunk network model was constructed in H20Map SWMM to represent the trunk mains from
the discharge point from NVL011 and the catchments to the north to NVL040.
The analysis indicated that the trunk mains do not surcharge with the inclusion of the Noosa on Weyba
Development as illustrated in the Figure 6-1
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 14
Page 16
~,.., Carclno Water Supply and Sewerage Analysis
Noosa on Weyba
13 --- ------ -- -----------
----,-- --------------,
------ ------ - ------------- -- ---
------------,--"------’-------.--------------- -,-----------------,
I01118 --------~------ " , ,.
I I I "
" , "
I I " I ,
11.1- --
-------------~---------------- ________________._________________1...________________
I I
________________ ________________.________________.._________________1...________________.
, "
I I , "
I I , "
I I , "
" ",.
- - -------_----._--
----------------,. -------------,--------------- ----------------,-----------------.-----------------,----------------,
1
---~1-~~r-------.------- , ",.
10’4f
401111114 ,
,
""
",.
9.1 - - - - -
~’- - - - - - - - - - -- - -
4OM1’113- - - - - - -- --
-~-- - - - - --- -- -- --- -- -- --- - - -- - -- - - -- ------- - - -----
~ -----~- -~ -:
-- ---- ---- - - -------- ------ - - -- --- -- ------
401111112
; ;;;;
-----------,----------------- ---------------_!_----------------,-----------------,-----------------
1.8 -------- ------ --------_._-
"
----------------
’"
: 1111111: :::
, , ,
, ""
6.5-+- -
__:___ __ ___ _____ ________________ ----------------.-----------------1-----------------0---______________,
---5 6-- , ""
, ""
g ,
,
""
""
’’ 5.2 - -- -- ---- -- - - - -
~
,
- - - - -- -- -- -- -- - -
-;---
.
-- -- --
,
-,-----------------
,
----------------
’"
----------------j-----------------,-----------------,-----------------
."
~ ,
,
,
.
.
, ,
,
,
’"
,
,
,
,
, ,
!!: 3.9 - -- -- -- -- -- - - - -
~
- - - - -- -- -- -- -- - -
~-
- - - - - - - -- -- -- --
-,- - - - - - - - - - - - -- -
-,
-- - - - - - - - - - -- -- - -- -- -- - - - - - - - - - - -- -- -- -- - - -- - - - -
~
-- -- -- -- -- - - - - - -
~- - -- - - ---- -- -- - -
-~
-
---:
- - - - -- -- -- --
... "
: 401121115 ’:
ill 401121114 4Ot121113 :
’" 2.6 ----- - - ------------------ .------
--’ , , ,
40111\1111
1.3 - - - - - - - - - - - - - - -
~ - - - - - - - - - - - - - - - -
~- - - - - - - - - - - - - - - -
-;- - - - - - - - - - - - - - - ._--- ----------- ---- ------------
---,------------_._-.,--------------
, ,
-, --------------,
, . ,
, , , ,
, ,
0.0 f - - -- -- -- -- -- - - - -
~ - - - - -- -- -- -- -- -
-;- -- - - - - - -- -- -- --
-;- - - - - - - - - --- --
---~ .____ ___________ ____ ____________
___J_____________.__-’______________
, ,
, ,
12
13 ’
’14 _15
~ ~_
-1.3 t- - -- ---
---~----------------~-----------------;-----------------~ --- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, _ _ _, _
, , , ,
, , , , ,
::::r--------------t--------------t--------------:-----------------t----------------[----------------j----------------j---------------T------------
I I , ,
, , , ,
-5.2 + + + + t t
0.0 118.1 231.4 356.1 414.8 593.5 112.2 830.9 949.6 1068.3 1181,0
Distance (rn)
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results
6.2.3 Pump Station NVL040
The twin gravity mains discharge into the existing major pump station NVL040. This pump station collects
flows from several local catchments and conveys flow via a 450 mm diameter rising main to the Noosa
Heads STP. It services an existing population of almost 19,600EP with an ultimate service population near
23,500EP.
The inclusion of the Noosa on Weyba 2,370EP represents a 10% increase in service population ultimately.
An analysis of this pump station and downstream infrastructure was undertaken to assess the impact of the
development.
The existing design details of NVL040 and its rising main are detailed in Table 6-3.
Table 6-3 NVL040 Design capacities
Velocity Headloss
Total Total Rising
Pump at Total at Total
Pump Power Main
Head1 Pump Pump
Existing Flow1 Rating1 Diameter
EP
capacity capacity
(Us) (m) (kW) (mm) (m/s) (m)
21,600 225.00 41.80 123.00 450.00 1.38 11.19
Note: 1. Based on Pump Curve CS32311735and design operating point
6.2.3.1 NVL040 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 10%. The increase in population does not trigger an augmentation to NVL040. It is expected that the
existing pump should be adequate to accommodate the increase in flow. However it would be operating at a
lower efficiency. Table 6-4 details the pump station requirements with the inclusion of the proposed
development.
Northbrook Corporation Pty, LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 15
[OCR of page images]
< Cardno Noosa on Weyba
Water Supply and Sewerage Analysis
Head/E levation (m)
2.6
13
00
AB
2.6
39
5.2
0.0 118.7 237.4 356.1 A748 593.5 12.2 830.9 949.6 1068.3
Distance (m)
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results
6.2.3 Pump Station NVL040
The twin gravity mains discharge into the existing major pump station NVL040. This pump station collects
flows from several local catchments and conveys flow via a 450 mm diameter rising main to the Noosa
Heads STP. It services an existing population of almost 19,600EP with an ultimate service population near
23,500EP.
The inclusion of the Noosa on Weyba 2,370EP represents a 10% increase in service population ultimately.
An analysis of this pump station and downstream infrastructure was undertaken to assess the impact of the
development.
The existing design details of NVL040 and its rising main are detailed in Table 6-3.
Table 6-3 NVL040 Design capacities
Velocity Headloss
at Total at Total
Pump Pump
Total Rising
Pump -
fyi aul Head’ ET
Existing Flow ET ig
EP capacity capacity
(Lis) i) (mm) (mis) (m)
21,600 225.00 41.80 123.00 450.00 1.38 11.19
Note: 1. Based on Pump Curve CS3231 /735and design operating point
6.2.3.1 NVL040 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 10%. The increase in population does not trigger an augmentation to NVLO40. It is expected that the
existing pump should be adequate to accommodate the increase in flow. However it would be operating at a
lower efficiency. Table 6-4 details the pump station requirements with the inclusion of the proposed
development.
Northbrook Corporation Pty. Ltd Version 3 28 November 2012
5101-19 Commercial in Confidence Page 15
49/01/01
1187.0
Page 17
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
Ultimate 23,474.31 244.50 21.00 78 450 1.08 15.15
Ultimate with
25,845.31 269 23.00 97 450 1.69 16.30
Development
6.3 Noosa on Weyba Network
An internal sewerage network to service the Noosa on Weyba development has been identified. It is noted
that in the SEQ Design and Construction Code, that a conventional system (i.e. gravity mains and pump
stations) are preferred over alternative strategies. However, with final lot configurations to be confirmed a
definitive internal network will be identified at a later date.
Alternative servicing strategies such as the use of low pressure sewers has been considered for this
development. For the purposes of this report a conventional system has been adopted, to demonstrate the
servicing strategy.
6.3.1 Gravity Mains
A network of gravity mains, ranging in size from 150 mm to 225 mm are required to service the development.
Analysis has indicated that the use of gravity mains at minimum grade will be able to service the
development.
Properties within Precinct 4 (MP005 Precincts J,K and L) are proposed to connected via 150 mm gravity
mains to the existing sewers along Lake Entrance Boulevard. The combined PWWF for these properties is
2.6L/s. The existing development along Lake Entrance Boulevard currently discharging to the existing 150
mm gravity main contribute approximately 4.6L/s at PWWF. The impact of these flows from the Noosa on
Weyba development on this network is expected to be minimal.
A small portion of development in Precinct 1 (MP005 Precinct A) is considerably lower than the surrounding
development. Servicing of this site may not be possible via gravity, as identified in Figure 2. A small grinder
pump servicing this site may be required, discharging to the nearest gravity main.
Detailed design will confirm the reticulation network design.
Figure 2 illustrates the proposed alignment of gravity mains in the development.
6.3.2 Pump Stations
Due to the topography of the site, several pump stations are required to convey flow to the external
connection. Three small pump stations required to service the development in Precinct 2 (MP005
are
Precincts B,D and E) on the south eastern corner of the development. With a larger pump station required to
convey flow to the external catchment. Consideration should be given to the local flood levels and pump
stations should be located above these identified levels where possible. Detailed design will confirm the
location of pump stations and rising main alignments.
Details of the pump station capacities and discharge rising main is detailed in Table 6-5.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 16
Page 18
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
Table 6-5 Noosa on Weyba Proposed Pump Station Details
Local Tot~1 Pump Pump Rising .
Pump. Station Pump . .
Maximum
Station Service. Tota~ Capacity Head S!atlon m.am Velocity
Population Service EP Size Diameter
ID (PWWF _
(m) (m/s)
(EP) (kW) (mm)
LIs)
SPSNW1 679.65 679.65 7 14.59 1.56 100.00 0.90
SPSNW2 132.00 811.65 8 11.77 1.50 80.00 1.68
SPSNW3 409.20 1,220.85 13 35.81 6.87 100.00 1.62
SPSNW4 896.70 2,117.55 22 20.05 6.67 150.00 1.25
Should a low pressure sewer system be installed, smaller pump stations servicing individual lots would be
required. A single conventional pump station would still be required to discharge flow off the site to the
existing network.
To discharge to the existing pump station NVL011, the Noosa on Weyba pump station (SPSW14)would
need to discharge, via 400 metres of 150 mm diameter rising main, along Walter Hay Drive. As detailed in
Section 6.2.1, discharging the flow to NVL011 would require an upgrade of this pump station.
Figure 2 illustrates the proposed location of each pump proposed for the gravity option.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 17
Page 19
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
6.4 Noosa Heads Sewerage Treatment Plant
Flow from the Noosa on Weyba development is proposed to be conveyed and treated at the Noosa Sewage
Treatment Plant (STP). Based on advice from
Unitywater officers and publically available documentation,
preliminary investigations have indicated that the Noosa STP is at capacity.Augmentation to rectify the
capacity issues at the Noosa STP has been identified by the former Noosa Shire Council and has been
included in past Council budget minutes dating from 2008. Current advice from Unitywater has indicated that
the augmentation of the Noosa STP would be subject to review in 2012.
Analysis of the Noosa STP was detailed in a paper presented at the 2010 AWA Conference entitled, ’So Tell
Me Again, Why Do I Need To Upgrade An STP With 225 MIlD Capacity When It’s Only Treating 150 MIlD?"
M.Thomas, Unitywater. This paper highlighted that the capacity at the Noosa STP is primarily related to the
influent Biological Oxygen Demand (BOD)and COD (Chemical Oxygen Demand). COD and BOD represent
the relative strength of the influent sewage with levels of governing downstream treatment processes. This
could include the capacity of the bioreactors and clarifiers as well as the sludge processing stream. Table 6-6
below from the AWA conference paper compares the design capacity of the Noosa STP to the actual current
plant loadings.
Table 6-6 Noosa STP Design Capacity and Current Plant Loadings
Design
I Current Loading (EP)
Capacity Total
2009/10 Total
(EP) COD BOD Suspended Total Phosphorous
Hydraulic Solids
Nitrogen
48,000 40,000 61,538 69,231 62,500 42,000 44,444
The table highlights that while the plant appears to be capable of treating the current hydraulic, Nitrogen and
Phosphorus loads, the current design capacity is not suitable to treat the BOD/COD and Suspended Solids
loads.
Advice was sought from Unitywater regarding capacities and the potential for augmentation at the Noosa
STP. Unitywater, via Ashley Lorenz, provided the following advice:
. Noosa Sewage Treatment Plant has capacity to serve existing sewer connections and new
development designated in the current Noosa planning Scheme until late 2015. This assessment is
based upon Unitywater’s assessment of the performance of the plant and certain assumptions
about; rate of growth, influent characteristics and approval of new development not extending
beyond the urban area detailed in the Noosa Planning Scheme as at June 2012.
. The Noosa Sewage Treatment Plant is operating beyond certain aspects of its design capacity but is
producing effluent which complies with that prescribed in the environmental licence.
.
Unitywater is satisfied that the Noosa Sewage Treatment Plant is being operated very efficiently.
.
Unitywater and the treatment plant operator, Degr mont, have commenced preparation of a
business case for augmentation of the Noosa Sewage Treatment Plant. Based upon the outcomes
of an options analysis Unitywater’s Board has approved, in September 2012, a revised strategy for
augmentation of the Noosa Sewage Treatment Plant which includes a delay in the preparation of the
business case until such time as Unitywater obtains a new environmental licence. Unitywater will
lodge a development application for augmentation of the treatment plant in January 2013 and is
targeting a decision notice being issued in June 2013. It is expected that the augmentation will be
commissioned in December 2015.
The full letter from Unitywater is detailed in Appendix C.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 18
Page 20
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
6.4.1.1 Alternative Treatment Options
Should the programmed augmentation works not be completed by the expected December 2014 date, a few
sewage disposal options exist including capturing flows onsite or tankering to another treatment plant.
Based on the expected loads to be generated, onsite treatment with effluent reuse for irrigation or discharge
to nearby waterways would not be a possibility. There exists insufficient land of suitable soil profile and area
to be able to utilise effluent reuse in an efficient manner, with stormwater harvesting being of more suitable
beneficial use for open space irrigation. In addition, the limited capacity of the site’s soils to receive effluent
without release to ground or surface waters coupled with the sensitive nature of the receiving nearby waters
(Lake Weyba) including its value as a declared Fish Habitat Area and a habitat for threatened species such
as the Wallumfroglet, would make on-site treatment a last resort option.
In the interim, based on the assumption occupation of the site (and hence flows) will increase gradually over
time, the following is proposed:
> Construction of SPSNW1 and the gravity main discharging to SPSNW1 to be included in the development
subdivision works
>
Discharge of initial flows to SPSNW1 and tankering as required to the Coolum STP.
> As flows and tankering costs increase, a more permanent solution may be required. By this stage, the
discharge to Noosa STP may be an option. If not, then flows could either be treated onsite with a
packaged treatment plant with tankering disposal or a main constructed to discharge to the Coolum STP.
6.4.1.2 Alternative Network Option
Should the capacity of the Noosa STP be limited, the installation of low pressure sewers within the
development would be considered to assist in reducing flows to the Noosa STP. The use of low pressure
sewers within the development would be viable, given the topography and the requirement of pump stations
for a typical gravity sewer network, described in Section 6.3.
The use of low pressure systems can reduce the depth and size of sewerage infrastructure. In addition it is
expected that the total design flow (PWWF)would reduce with the low pressure system. The use of a low
pressure sewerage network can assist in reducing flows, as inflow and infiltration can be significantly
reduced. In this instance the design flow for low pressure sewers can reduced by at least half, refer (Table
4-2),as the design flow is Peak Dry Weather Flow (PDWF)for the system.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 19
Page 21
~,.., Carclno Noosa on Weyba
Water Supply and Sewerage Analysis
7 Conclusions
Based on the work undertaken for servicing the Noosa on Weyba development, a number of conclusions
have been made:
> The proposed development is approximately 2,730 EP and will comprise a mix of residential and non-
residential land uses on the site.
> The development is outside the current water supply and sewerage planning head works region and is
proposed to connect to the existing water supply and sewerage networks currently servicing Noosa.
> To provide water supply to the development it is proposed to connect to the Noosa Industrial DMA
(NIDMA)and serviced via the Tewantin Reservoirs.
>
Analysis undertaken by MWH on behalf of Unitywater indicated that the current NIDMA water supply
network has sufficient capacity to accommodate the development.
> To service the site, a connection to the existing 600mm diameter trunk main along Eenie Creek Road via
a 250 mm diameter main along Walter hay Drive is proposed.
> Consideration should be given to a connection to the existing 150 mm reticulation main in Lake Entrance
Boulevard to avoid dead end mains in the proposed network.
> An internal network of 200 mm and 150 mm diameter water mains will be required to service each site to
maintain Unitywater’s DSS.
> The conveyance of sewage from the site is proposed via the internal use of pump stations and local
reticulation mains. For the purposes of this study a conventional system has been identified, as per
Unitywater’s DSS.
> A Low pressure sewerage system may be considered depending on topography site constraints and
capacity at the Noosa STP. It is expected that the design flow with a low pressure system will be reduced
by at least 50%,should this system be adopted.
> A total of five pump stations are proposed. Four internal pumps will convey flow to a central pump station
to the north of the development.
> This main pump station will convey flow to the existing Noosa sewerage network and discharge to
existing pump station NVL011. The inclusion of the Noosa on Weyba development would trigger an
upgrade of this existing pump station
> The conveyance route from NVL011 follows the existing rising main and gravity network to the Noosa
STP. No further augmentation of the existing sewerage network was identified.
> While hydraulic capacity at the Noosa STP is sufficient, there is restriction in the BOD/COD capacity.
>
Unitywater has advised that the augmentation of the Noosa STP is proposed, with a completion date
scheduled for December 2015. It is expected that should the STP augmentations be completed, the STP
will be sufficient to accommodate loads from the Noosa on Weyba development
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 20
Page 22
Noosa on Weyba
Water Supply and Sewerage Analysis
CJr’)CarclnCl~
Shaping the Future
[OCR of page images]
Noosa on Weyba
Water Supply and Sewerage Analysis
CJD Cardna
Shaping the Future
Page 23
:!1
CD
-u
Figure 1 Dl
:T
’5:
Noosa on Weyba ~
~
,
~
(.0
External Water Supply
~
(])
’<
0-
~
’5:
Dl
-0
S.
LEGEND 9:
Node Maximum Hour Fire Fighting
W+E S
TI
ci"
c
~
10 Pressure (m) Pressure (m) TI
cO.
c
Existing Water
10 50.2 16.3
Proposed Water Supply Mains I:
12 49.9 16.2 CJ)
(Diam)
14 49.5 15.6 ~
150 mm
16 49.2 15.3
200mm
18 42.3 13.3 250mm
29 50.2 16.3
32 47.1 14.8
. Model Node
33 47.7 15
35 50.2 16.2
36 51.1 16.4
38 42.5 14.1
39 41.8 13.9
41 43.9 14.5
43 38.9 13
44 38.7 13
.....
46 52 16.8
47 51.9 16.8
49 46 14.4
50 42.8 13.4
56 45.5 15
58 39.8 12.6
59 38.8 12.3
62 50.4 16.3
65 47.9 15.7
67 43.5 13.7
68 49 15.4
71 46.1 14.4
N N
76 39.4 12.4
o~sa
on weyba
CJr-’) Cardno Shaping the Future
Cardno (QLD)Ply Ltd I ABN 57 051 074992
Level 11 ,North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 0733699822 Fax: 0733699722
"@2012Cardno(Old)PlyLldAIIRightsReserved. Copyright in the whole and every part of this
document belongs 10 Cardno (Old)Ply Lid and may nol be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media 10 any person withoul
the prior written consent of Card no (Old)Ply Lid."
This document is produced by Cardno (Old)Ply Lid solely for the benefit of and use by the client
In accordance wilh the terms of the retainer. Cardno (Old)ptylld does not and shall not assume
any responsibility or liability whatsoever to any third party arising out of any use or reliance by any
third party on the content of this document.
SHEET A3
Project No: 5101-19
Date: 22/10/2012
Revision Number: 2
Designed by: J.L.
Client Name: SMDS
Page 24
:!1
CD
-u
Figure 2 Dl
:T
’5:
Noosa on Weyba ~
~
,
~
Proposed Sewerage (.0
Infrastructure ~
(])
’<
0-
~
’5:
Dl
""0
S.
LEGEND 9:
W+E S
TI
ci"
c
~
TI
cO.
c
Existing Network
Pump Station
I:
CJ)
Gravity Mains ~
Rising Mains
.!! Noosa STP
Proposed Network
Gravity Mains
Rising Mains
t::. Pump Stations
Converyance
~ ,,~
rl~Oa)Sa
on weyba
’-It-,Cardno Shaping the Future
Cardno (QLD)Ply Ltd I ABN 57 051 074992
Level 11 ,North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 0733699822 Fax: 0733699722
"@2012Cardno(Old)PlyLldAIIRightsReserved. Copyright in the whole and every part of this
document belongs 10 Cardno (Old)Ply Lid and may nol be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media 10 any person withoul
the prior written consent of Card no (Old)Ply Lid."
This document is produced by Cardno (Old)Ply Lid solely for the benefit of and use by the client
In accordance wilh the terms of the retainer. Cardno (Old)ptylld does not and shall not assume
any responsibility or liability whatsoever to any third party arising out of any use or reliance by any
third party on the content of this document.
SHEET A3
Project No: 5101-19
Date: 10/10/2012
Revision Number:
Designed by: J.L.
Client Name: SMDS
Page 25
Noosa on Weyba
Water Supply and Sewe
Analysis
’-.J~ Cardno~
Shaping the Future
[OCR of page images]
Noosa on Weyba
Water Supply and Sewerage
Analysis
APPENDIX A
PRECINCT PLANS
MP005 AND MP006
cy Cardna
Shaping the Future
Page 26
I I
LEGEND:
-
SEND SITE
- RECEIVE SITE
Precinct Predominant Use AI111rOx Area Dwellings/ha Potential
!hID Dwellings
N N
A Resident’s Lounge 0.59
B Premium Residential Lots 5.65 13 73
C Apartment Living 1 Mixed Use 50
TBC (includes :t600sqm Retail space)
1.37 36
D Gated Townhouses 3.60 23 83
E Retirement Living 1 Aged Care 3.22 37 120
F Residential Lots -
Environmental Amenity 3.38 12 40
G Residential Lots -
Environmental Amenity 8.29 15 124
H Residential Lots 6.17 8 52
H Townhouses 0.80 30 24
Residential Lots 16.38 12 203
Rural Residential Lot 1.77
K Special Residential 0.66 9 6
L Retirement Living 1 Aged Care 5.20 19 100
M Parks 8.06
N Greenspace & BDOA Send Site 236.42
0 Lake Buffer Zone 1.75
TOTAL 303.3 876
*/ndicative yield only
Urban Development 18.82%
Greenspace & BDOA Send Site 77.95%
Parks & Lake Buffer Zone 3.23%
- -
NOOSA ON WEYBA -
.STRUCTURE PLAN NORTHBROOK CORP PTY LTDAND J & K HOFMANN
ro Jsa ..
Design
on weyba -
-
MlDesign Ply Ltd 0 SO.O 100 archi1re I master plannirg I urban design I interior design
ACN100492304 ~
ABN 89159048228
PlotDate:8J08I2012
W~ SCALE-1:10000@A3 APPROVED FOR ISSUE:_ 07108/2012@ ML Design Pty. Ltd. JOB NO: NORT0001 MP-005-[F] -
.
L File Path: P:INORTOOO1_Lake WeybalB_Dorumentatioo\BI~ProductionlB1_Ora’NingsVlrdliCADu..ayoutsINORTOOO1_Layout.pln
_j
Page 27
I I
i
+
,. r
....
I 1
, .
I
. ,
,
L
I I
,
,
I
.;.
, ,
,
I
1,1
" .
j
~
r
I
~
( \_--
(lI) Legend
r:===J Noosa on Weyba Site Boundary
-::::::1 Open Space Conservation Zone
r~
l ,~Precinct 1
[r- Precinct 2
~c:: Precinct 3
rf . ’
Precinct 4
, I
I
-
NOOSA ON WEYBA -
.PRECINCT PLAN NORTH BROOK CORP PTY LTO AND J & K HOFMANN
ro Jsa ..
Design
on weyba -
-
MlDesignPtyltd 0 SO.O 100 architecture I master planning I urban design I interior design
ACN100492304 ~
ABN 89159048228
Plot Date: 23/1112012
"V~ SCALE-1:10000@A3 APPROVED FOR ISSUE:_ 23/11/2012@ ML Design Ply. Ltd. JOB NO: NORT0001 MP-006-[D] -
.
L File Path: P:INORTOOO1_Lake WeybalB_Oocumentation\Bl_Production\Bl_Drawings\ArchiCAD\Layoots\NORTOOO1_Layoul.pln
_j
Page 28
Noosa on Weyba
Water Supply and Sewe
Analysis
’-.J~ Cardno~
Shaping the Future
[OCR of page images]
Noosa on Weyba
Water Supply and Sewerage
Analysis
APPENDIX B
UNITYWATER
yA YAU RC
NETWORK
ANLAYSIS
cy Cardna
Shaping the Future
Page 29
Q
It
:t
:)
g
[OCR of page images]
CO
BUILDING A BETTER WORLD
Page 30
([D)MWH. Noosa on Weyba Water Network Performance Assessment
This document has been prepared for the benefit of Unitywater. No liability is accepted by this company
or any employee or sub-consultant of this company with respect to its use by any other person.
This disclaimer shall apply notwithstanding that the report may be made available to other persons for
an application for permission or approval to fulfil a legal requirement.
QUALITY STATEMENT
PROJECT MANAGER PROJECT TECHNICAL LEAD
Mark Bruno Tony Bamford
PREPARED BY
Patrick Tunnah ....../....../..... .
CHECKED BY
Tony Bamford ....../....../..... .
REVIEWED BY
Phil Hall ....../....../..... .
APPROVED FOR ISSUE BY
Mark Bruno .
...../. ...
./.
. .....
BRISBANE
Level 3 35 Boundary Street, PO Box 3602, South Brisbane, QLD 4101
TEL +61 730295000, FAX +61 730295050
REVISION SCHEDULE
R
Signature or Typed Name (documentation on file).
Nev o
Date Description
Prepared by Checked by Reviewed by Approved by
Status: Draft 22/06/2012
Project number: Our ref: Noosa on Weyba WS Assessment.docx
Page 31
([D)MWH. Noosa on Weyba Water Network Performance Assessment
Unitywater
Noosa on Weyba Water Network Performance Assessment
CONTENTS
Introduction.............................................................................................................................. 1
1.1 Methodology........................................................................................................................ 1
1.2 Assumptions...... ..................................................................................................................
1
2 Hydraulic Model....................................................................................................................... 2
2.1 Model Update.... ..................................................................................................................
2
2.2 Model Demand.. ..................................................................................................................
2
3 Standards of Service................................................................................................................ 3
4 Network Performance............................................................................................................... 4
4.1 Maximum Hour Pressure Performance........ ..........................................................................
4
4.2 Fire Flow Pressure Performance. ..........................................................................................
6
4.3 Storage Assesment.................... ..........................................................................................
6
5 Conclusions................................................................................................................... ..........
9
LIST OF TABLES
Table 2-1: EP Summary for Proposed Noosa on Weyba Development ................................................3
Table 2-2: Model Demand for Proposed Noosa on Weyba Development .............................................3
Table 4-1: 2038 Maximum Hour Pressure Performance .....................................................................5
Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour.............................................. 6
Table 4-3: Tewantn Reservoir Storage Assesment without Noosa on Weyba....................................... 8
Table 4-4: Tewantin Reservoir Storage Assessment including Noosa on Weyba.................................. 8
LIST OF FIGURES
Figure 2-1: Updated Model Pipes..................................................................................................... 2
Figure 4-1: Network Performance Critical Pressure Locations.................. ...........................................
4
Figure 4-2 :Tewantin Reservoir Zone..... ..........................................................................................
7
APPENDICES
Appendix A Cardno Assessment Brief
Status: Draft 22/06/2012
Project number: Our ref: Noosa on Weyba WS Assessment.docx
Page 32
([D)MWH. Noosa on Weyba Water Network Performance Assessment
1 Introduction
MWH have been engaged by Unitywater to undertake a water network performance assessment of the
proposed Noosa on Weyba development. Three initial supply options have been developed and are
included within the assessment brief prepared by Cardno (refer to Appendix A).
The proposed development is located off Old Hollett Road near Walter Hay Drive. It will be serviced
from within existing Noosa Industrial DMA (NIDMA) with storage provided at the Tewantin
the
Reservoirs. Option 1 is to connect a 300 mm diameter main into the existing 375 mm diameter trunk
main along Eenie Creek Road and serve as the primary connection to the development site. Options two
and three assessed the potential for a secondary 200 mm diameter connection from the existing
150 mm diameter main in Lake Entrance Boulevard. Details of the network layout for the three supply
options assessed can be found in the Cardno Report (Appendix A).
1.1 Methodology
The assessment has applied the following methodology:
The assessment has been carried out using H20MAP Water.
The demands (EPs)for the Noosa on Weyba development site were developed by Cardno and
adopted for use in the ’Unitywater Planning Model -
Water’. Demand was distributed to
junction/s at the boundary of the development.
The water network within the NIDMA was reviewed against the latest pipe GIS layer and the
model was updated to reflect the existing water network.
Fire flow demands were added to junctions within NIDMA and a fire flow assessment was run to
determine the critical fire flow junction.
The model was used to assess supply network performance for the three supply
the water
options. The network was assessed with
and without the proposed development under
maximum hour and fire flow demand conditions during the Ultimate planning horizon.
1.2 Assumptions
The performance assessment of the water supply network has been undertaken assuming the following:
The development demands for assessment were provided by Cardno along with calculations,
and assumptions. MWH have confirmed that demand conversion factors used are inline with the
Noosa Planning Scheme Policy and no revision is necessary.
Along with the "no-development" scenario, the three options proposed within the assessment
brief were the only options assessed.
Only the full development solution was assessed. No interim development stages were
investigated.
The assessment has provided results to the boundary of the development only. No internal
water supply network was investigated and internal water supply network head losses were not
assessed.
Status: Draft 22/06/2012
Project number: Page 1 Our ref: Noosa on Weyba WS Assessment.docx
Page 33
([D)MWH. Noosa on Weyba Water Network Performance Assessment
2 Hydraulic Model
2.1 Model Update
A review of the ’Unitywater Planning Model -
Water’ H20MAP Water model was undertaken for the
Noosa Industrial DMA and the following pipes were updated into the model:
NEW-P001, 150 mm diameter main, 330 m in length, located at Noosa Civic.
NEW-P002, 150 mm diameter main, 100 m in length, located at Noosa Civic near Rene
Street.
NEW-P003, 150 mm diameter main, 420 m in length, located along Rene Street.
The updated pipes are shown below in Figure 2-1.
Water Main
r~’IT’)~’tf->p:g’~
l!}.[Q Q ~:&:.i1t,i ~
Figure 2-1: Updated Model Pipes
2.2 Model Demand
A total water demand for the site of 2,416 EP has been estimated by Card no based on current SCRC
planning information. MWH have confirmed that demand conversion factors used are inline with the
Noosa Planning Scheme Policy and no revision is necessary. The EPs considered for the site are
summarised in Table 2-1.
Status: Draft 22/06/2012
Project number: Page 2 Our ref: Noosa on Weyba WS Assessment.docx
Page 34
([D)MWH. Noosa on Weyba Water Network Performance Assessment
Table 2-1: EP Summary for Proposed Noosa on Weyba Development
339 lots 2.3 EP x lot 779.7
(assumed 2 bedroom
unit)
600 m2 100 EP per ha 6
Total 2,415.9
The water supply demands as flows for the proposed development were supplied by Card no and
confirmedby MWH. A Peak Hour demand of 31 LIs and a fire flow demand of 51 LIs (30 Us + 2/3
maximum hour) at the development site were confirmed. Table 2-2 details the demand distribution into
the H20MAP Water model. The location of proposed development connections are shown in Figure 2-1.
Table 2-2: Model Demand for Proposed Noosa on Weyba Development
Option 1 Option 2 Option 3
Model Junction ID /
Peak Fire Peak Fire Peak Fire
Description
Hour Flow Hour Flow Hour Flow
(Lis) (Lis) (Lis) (Lls)^ (Lis) (Lis)
NOOSA_ON_WEYBA_CONN1, 31.32 50.88 31.32 50.88 31.32 50.88
proposed development
connection #1
NOOSA_ON_WEYBA_CONN2, 3 32
proposed development
connection #2
^
Both fire flow demands do not occur simultaneously
3 Standards of Service
The standards of service for water supply applicable to this investigation are as follows:
Minimum residual pressure >= 22 m
Fire flow demand assessed at 2/3 PH demand
Minimum pressure under fire flow demand at hydrant = 12 m
Maximum velocity = 2.5 Us
The above standards have been been adopted from the Unitywater Desired Standards of Service.
Status: Draft 22/06/2012
Project number: Page 3 Our ref: Noosa on Weyba WS Assessment.docx
Page 35
([D)MWH. Noosa on Weyba Water Network Performance Assessment
4 Network Performance
4.1 Maximum Hour Pressure Performance
Pressures for all options within the NIDMA water supply network remained above the required pressure
of 22 m with the inclusion of the proposed Noosa on Weyba development when assessed under
Ultimate maximum hour demands.
The maximum hour critical junction within the DMA was identified as NOON246 and is located
immediately upstream of the Noosaville West DMA inlet (Figure 4-1). Pressure at this location was
identified to reduce by 8 m with the inclusion of the proposed development during the Ultimate maximum
day planning horizon (Table 4-1).
LEGEND
Water Main
0
Junction
* Maximum Hour CPP
* fire flow cpp
* Proposed Development
Connections
D DMA
Figure 4-1: Network Performance Critical Pressure Locations
Status: Draft 22/06/2012
Project number: Page 4 Our ref: Noosa on Weyba WS Assessment.docx
Page 36
([D)MWH. Noosa on Weyba Water Network Performance Assessment
Minimum pressure results identified during the maximum hour performance assessment are provided
below in Table 4-1.
Table 4-1: 2038 Maximum Hour Pressure Performance
NOOSA_ON
NOOSA_ON_W
NOON246 NTHWJ002615 NOON111 WEYBA_CON
EYBA_CONN1 N2
Connection #1 at Connection #2 at
Critical Connection #2
the intersection Connection #1 the intersection
junction of Eenie Creek at development of Lake Entrance
at
within development
Road and Walter boundary Boulevard and
NIDMA boundary
Hay Drive Attenuatta Place
metres
47.09 64.78 64.6
39.83 57.28 54.81
39.19 56.62 54.16 57.12 57.12
40.15 57.68 55.92
PASS PASS PASS PASS PASS
Status: Draft 22/06/2012
Project number: Page 5 Our ref: Noosa on Weyba WS Assessment.docx
Page 37
([D)MWH. Noosa on Weyba Water Network Performance Assessment
4.2 Fire Flow Pressure Performance
The fire flow assessment for all options identified pressures at the development site and within NIDMA
are predicted to remain above the required pressure of 12 m during 2/3 maximum hour in the Ultimate
planning horizon. 2/3 maximum hour was determined to be at 7pm and is calculated from the maximum
flow into NIDMA.
Fire flow demands were assigned to all junctions within NIDMA to determine the critical fire flow
junction. Fire Flow demand was assigned to junctions as follows:
Junctions with commercial demand 30 Us.
Junctions with residential demand 15 Us.
The critical fire flow junction was found to be near the end of Traders Lane behind 118 Noosa-Eumundi
Road (refer to Figure 4-1). Residual pressure at this location without the inclusion of the proposed
development is predicted at fire flow demand at the hydrant to be 21.12 m. The addition of the
development site is predicted to reduce pressures at the critical point to a minimum of 13.38 m at
Ultimate. The model predicts that with the development the catchment will still meet the standards of
service.
Pressure results identified at 7pm during the fire flow performance assessment are provided below in
Table 4-2.
Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour
NOOSA_ON_WEYBA_ NOOSA_ON_WEYBA_C
NTHWJ002350
CONN1 ONN2
Critical fire flow Connection #1 at Connection #2 at
junction within NIDMA development boundary development boundary
metres head
21.12
13.99 57.35
13.38 60.75 55.42
14.41 59.52
PASS PASS PASS
4.3 Storage Assesment
The Noosa on Weyba development will be supplied from the Noosaville Industrial DMA. This DMA is
one of a number of DMAs dependent on the Tewantin Reservoirs for storage as shown in Figure 4-2
(Tewantin.
Status: Draft 22/06/2012
Project number: Page 6 Our ref: Noosa on Weyba WS Assessment.docx
Page 38
([D)MWH. Noosa on Weyba Water Network Performance Assessment
Figure 4-2 :Tewantin Reservoir Zone
As the Noosa on Weyba development is located outside of existing PIP boundaries it has not been
considerd in any previous water supply planning including allowance in reservoir sizing. Storage
assessment was undertake through application of the following DSS taken from the SEQ Water and
Sewerage Planning Guidelines.
Average Day Demand:
Detached Residential -
280 Up/day
Attached Residential -
260 Up/day
Non Residential 280 UEP/day
-
Mean Day Maximum Month Demand:
Detached Residential -
1.5 x AD demand
Attached Residential -
1.5 x AD demand
Non Residential -
1.5 x AD demand
Maximum Day Demand:
Detached Residential -
2 x AD demand
Attached Residential -
2 x AD demand
Non Residential 2 x AD demand
-
Ground Level Storage Requirement:
. Maximum Day (ML) + the higher of 4 hrs of MDMM or 0.5 ML
The 2012 Unitywater Demand Model was used in the storage assessment.
Assessment prior to inclusion of the Noosa on Weyba development identified a minor deficiency at the
2031 plannig horizon as shown in Table 4-3. Table 4-4 shows that with inclusion of the development
storage deficiency is bought forward to the 2016 plannig horizon. Addtional storage within the Tewantin
Suppied reservoir zone is required prior to 2016 for standards of service to be met with inclusion of the
Noosa on Weyba development. A total storage deficit of 1.64 ML is estimated at 2031.
Status: Draft 22/06/2012
Project number: Page 7 Our ref: Noosa on Weyba WS Assessment.docx
Page 39
([D)MWH. Noosa on Weyba Water Network Performance Assessment
Table 4-3: Tewantn Reservoir Storage Assesment without Noosa on Weyba
Additional Storage
Po ulation /EP Current Capacity Required Capacity Excess /Deficie ncv Requirement
Year Detached Res Attached Res Total Res Non-Res Total ML ML ML ML
2006 15803.6 8675.8 24479.5 4244.0 28723.5 24.5 17.71 6.79 0
2011 18561.9 9396.2 27958.1 6027.2 33985.3 24.5 20.99 3.51 0
2016 21654.4 10236.4 31890.8 7589.3 39480.2 24.5 24.41 0.09 0
2021 21717.1 10241.6 31958.7 7589.3 39548.0 24.5 24.45 0.05 0
2026 21719.7 10241.6 31961.3 7589.3 39550.6 24.5 24.46 0.04 0
2031 21730.1 10241.6 31971.7 7885.0 39856.8 24.5 24.65 -0.15 0.15
Table 4-4: Tewantin Reservoir Storage Assessment including Noosa on Weyba
Additional Storage
Po ulation /EP Current Capacity Required Capacity Excess /Deficie ncv Requirement
Year Detached Res Attached Res Total Res Non-Res Total ML ML ML ML
2006 17433.8 9455.5 26889.4 4250.0 31139.4 24.5 19.19 5.31 0
2011 20192.1 10176.0 30368.0 6033.2 36401.2 24.5 22.47 2.03 0
2016 23284.6 11016.1 34300.7 7595.3 41896.1 24.5 25.90 -1.40 1.4
2021 23347.3 11021.3 34368.6 7595.3 41963.9 24.5 25.94 -1.44 1.45
2026 23349.9 11021.3 34371.2 7595.3 41966.5 24.5 25.94 -1.44 1.45
2031 23360.3 11021.3 34381.6 7891.0 42272.7 24.5 26.14 -1.64 1.64
Status: Draft 22/06/2012
Project number: Page 8 Our ref: Noosa on Weyba WS Assessment.docx
Page 40
([D)MWH. Noosa on Weyba Water Network Performance Assessment
5 Conclusions
The ’Unitywater Planning Model -
Water’ water network model has been used to assess the potential
impact of the Noosa on Weyba development in the existing DMA inregard to pressure standards at
maximum hour and under fire flwo conditons. The demand from Noosa on Weyba has been applied
based on the following criteria:
Base model set to the Ultimate planning horizon
494 Residential Lots
339 Mixed Use Residential Lots
. 600 m2 of Retail Space
. Total EP = 2416
Maximum Hour demand = 31 LIs
Fire Flow demand = 51 LIs
The assessment of the water supply network under fire flow and maximum hour demands identified the
following:
Under maximum hour demand conditions Unitywater standards of service were met at the
proposed development site and within Noosa Industrial DMA for the three supply options during
the 2038 planning horizon. No augmentation of the existing network is required.
Under fire flow demand conditions Unitywater standards of service were met at the proposed
development site and within Noosa Industrial DMA for the three supply options during the 2038
planning horizon. No augmentation of the existing network is required.
Storage assessment of the Tewantin Reservoir with inclusion of the Noosa on Weyba development was
undertaken. The storage assessment identified the inclusion of the Noosa on Weyba development
brings forward storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS
contained in this report. A total storage deficiency of the Tewantin Reservoir of 1.64 ML was identified at
the 2031 plannnig horizon.
Status: Draft 22/06/2012
Project number: Page 9 Our ref: Noosa on Weyba WS Assessment.docx
Page 41
([D)MWH. Noosa on Weyba Water Network Performance Assessment Appendix A Cardno Assessment Brief
Page 42
eJ’., Cardno
Shaping the Future
Our Ref: 5101-19
Contact: Joshua Lake Card no (Qld)Pty Ltd
ABN 57 051 074992
Level 11
30 May 2012
515 St Paul’s Terrace
Fortitude Valley OLD 4006
Australia
Unitywater
Ground Floor, 8-10 Maud Street
Locked Bag 4006
Maroochydore, Qld 4405 Fortitude Valley OLD 4006
Australia
Attention: Michael Lukin
Phone: 61 7 3369 9822
Fax: 61 733699722
Dear Sir www.cardno.com.au
Hydraulic Modelling Fee Request
Please find attached a request for a fee to undertake a water supply hydraulic model
investigation for a proposed development in Noosa.
Estimation of Population Density
Based on Sunshine Coast Regional Councils (SCRC)planning information,
an Equivalent Person (EP)population was estimated for the site. The EPs considered
for the site are detailed in Table 1.
Table 1 Population Projections
Quantity EP Density Adopted EP
494 lots 3.3 EP x lot 1,630.2
2.5 EP x lot
339 lots (assumed 2 779.7
bedroom unit)
6
2415.9
Australia Belgium
.
United Kingdom .
Indonesia .
. Kenya
United Arab Emirates .
. New Zealand
United States .
.Papua New Guinea
Operations in 60 countries
...
Page 43
Hydraulic Modelling Fee Request 2 ~,.., Cardno Shaping the Future
UnityWater
Water Supply Demand and Sewage Flow Projections
An adopted design criteria based on the 2012 South East Queensland (SEQ) Planning Guidelines was
adopted for this development. Utilising the adopted peaking factors, detailed in Table 2, the water supply
demands were calculated for the proposed development. Table 3 details the projected water supply
demands.
Table 2 SEQ Planning Guidelines Design Criteria
Additional Flow
Base Flow Unit Peaking Factors
requirements
.
Water Supply
-
-,-AD = 280LlEP/d 4 x PH:AD
..
-
... .
..
AD Average Day
-
PH -
Peak Hour
Table 3 Water Supply Demands for the Proposed Development
Options
The service development, the three options have been developed.
> Option 1: This option involves the delivery of the full supply to the development from a connection to
the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed 300mm
trunk main.
> Option 2: This option involves splitting the site and utilising two connection locations. One
connection delivering supply to the development would be via a connection to the existing trunk
mains along Eenie Creek Road to the boundary of the site via a proposed 300mm trunk main. A
second connection (200mm)to the existing mains along Lake Entrance Boulevard is also proposed
to service the western lots. The supply sources would not be linked internally.
> Option 2: This option utilising two connection locations. One connection would be via a connection
to the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed
300mm trunk main with a 200mm connection to the existing mains along Lake Entrance Boulevard.
The supply sources would be linked internally.
Scope Of Work
Cardno require the analysis of the Noosa water supply network to confirm the capacity of the network. As a
minimum Cardno would require the available pressures at the proposed connection locations for both a
maximum day and fire fighting scenarios for each option.
7501-19 www.cardno.com
Page 44
Hydraulic Modelling Fee Request 3 ~,.., Cardno Shaping the Future UnityWater Fee Request It is requested that a fee estimation and scope of works to undertake the hydraulic model analysis of the Noosa water supply network be supplied to Cardno. A prompt response to this fee request would be appreciated. To assist in this matter, please find attached plans for each service option for the development. Yours faithfully / Joshua Lake Planning Engineer, Water Supply and Sewerage For Cardno Direct Line +61 731002267 Enc: Option Plans 7501-19 www.cardno.com
Page 45
::!1
~ \ CD
~ \
~ .~ I -u
,-
T
Ii
i)f ~ "
"
~
I
~y
v.\~
c; Option 1 el.
:::J"
’-I , \ 1..:1l ~ ~<;:;
s::
r 1 ~
Lake Weyba G
~
J I o
~
I I .:..
CD
1
I
,
r
,
Water Supply Infrastructure
I , ~
I
, I
I I
I
r
I
-Connectiorrt~ /Noosa system---+ I
Option 1 -
Single Feed
CD
’<
0-
~
J
I
I
r
,
,I f_tr /_
f-"~; ,:r- .’
I J,.
s::
’
I
OJ
j~
’/- Cv
I
~
_
c
j ’0
S’
J I,
r
~
I
I.
LEGEND N
I ’
I-
,
,~
I
I
~
I
W+E cO’
c
-,
S CD
~ ~,
c;
~’Ij -
~
’I ~
J I "
n
"
I
T
~
"- I
I:’
1/
D Development Site Boundary
-n
cO’
c
CD
l- t II
t l...
~.
I,
I,
I’
1-1 ,-r
’,I
"
I
"
I;
,FTI \\... y Trunk Feed
~
I(
I:.
)- I~
’ ~II Existing Mains "Sl.
, ~
6
:::J
, r
,’\ t I’
I
U>
I ~
\ ~
"
r
~
T ~
I
J’ Peak Hour = 31 LIs
I ,
1;1- r
f.. I
1/; Fire Fighting = 51 LIs
’I
I
’f
T;r-
.I.._
I Y .;:1
:1
~
J..
i
I
I
I
~ ~ j
~
,
i
"
NOT TO SCALE
DEVELOPMENT SITE
noosa
on weyba
’\
~
~~ Cardno Shaping the Future
Cardno (OLD)Pty LId I ABN 57 051 074992
Level 11, North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley OLD 4006
Tel: 0733699822 Fax: 07 3369 9722
"@2012Cardno(OId)Ply LId All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Old)Pty LId and may not be used, sold, transferred, copied or
reproouced in whde or in part in any manner or form or in or on any media to any person without
the prior wri1ten consent 01 CardrlO (Old)Ply lid."
This document is ptcduced by Cardno (Old) Pty Lid sotely 101’ the benefit 01 and use by the client
in accordance with the terms 01 the retainer. Cardno (Old)Ply LId does not and shall not assume
any responsibility or liability whatsoever to any third party arising out at any use or reliance by any
~ third party on the content at this document
~~
....<;) SHEET A3
~’9-
~’<- Project No: 5101-19
~
~’" 29/05/2012
Date:
Revision Number: For Advice
Designed by: JL
Client Name: SMDS
Page 46
::!1
:r CD
I . ~ ,
-u
’" T
If "’
I’
\’
\
I " ~
l.lJ_
\ \ \ I \
~
~,-
1/:
~ Option 2 el.
:::J"
j,- J_ I \
II ~
r- 1 ,
t r_[ r \ s::
,1 ~
’II ,
. \
~
j " IJ f) ’1 ~. Ii Lake Weyba G
-i’ "’(l ,).,
~ >Ie i
,._
,
~ ~
0
~
~
I
IT .:..
I CD
1 .
L ’I Water Supply Infrastructure
I t <.!... I
J I
~
I,
I
{",
"Connedtlon #1’to Noosa system. I :1 Option 2 Split Feeds -
CD
’<
0-
~
." j:t I-
"r-!-- ~
I-
/~. s::
,:t- r I- OJ
,~ .L,.
/ q t ’f-
"0
-A j_
f I S’
J, 1.:., ’./.-. ii’ I
\ LEGEND N
J,
j t J
J I ’
< ,
\
\
Ii
~
< ~
I
I
I
i.
I
j
\
-
\
II
I
W+E cO’
c
~ I
,’1
S CD
iJ- IJ.. Jf
-
1 ~ I ’I ~
J I
"
I
r:
] L
/
I
~
r
,f"
~
r
,
10
1/
D Development Site Boundary
-n
cO’
c
CD
j l .J J
k t 0’-
1-
:.:) ,._~ I .. (/)
\
II
I !
I
,- j.~1 ,
I~
TI r I
’’’’
Trunk Feed
\..
}>"
"’
~
I~
~, ~ Existing Mains "’Sl.
Peak Hour = 3 LIs /.
6
~ :::J
(/)
~
], ;~
Fire Fighting = 32 Lis I’
~
~
’to ~: ~
Peak Hour = 31 LIs
Fire Fighting = 49 LIs
y ’" ~
-:CfC
~
,.
Connection #2 to Noosa system
DEVELOPMEN’T SITE NOT TO SCALE
T
noosa
I
on weyba
]
"
~~CardnD Shaping the Future
Cardno (OLD)Pty LId I ABN 57 051 074992
Level 11, North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley OLD 4006
Tel: 0733699822 Fax: 07 3369 9722
"@2012Cardno(OId)Ply LId All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Old)Pty LId and may not be used, sold, transferred, copied?l
reproduced in whde or in part in any manner or form or in or on any media to any person Without
the prior written conseot of CardrlO (Old)Ply lid."
This documeot is prcduced by Cardno (Old) Pty lid solely lor the benefit of and use by the client
in accordance with the terms of the retainer. Cardno (Old)Ply LId does not and shall rIOt assume
any responsibility or liability whatsoever 10 any third party arising out of any use or reliance by any
~""’’<- third party on the conlent of this documeot
...<:> SHEET A3
~.,..
’<-~ 5101-19
~ Project No:
~"I’
Date: 29/05/2012
Revision Number: For Advice
Designed by: JL
Client Name: SMDS
The text continues on page 47.
Used in these records
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.