4.3 Integration with IWCMP
An integrated water cycle management plan (IWCMP)has been prepared as part of the Noosa on Weyba
development. This report references Integrated Watercycle Management Plan Noosa on Weyba
Development (Gilbert and Sutherland, August 2012).
The ICWMP considered several servicing options for the development. The Gilbert and Sutherland report
recommends, Option 4 as the preferred servicing strategy. In summary:
Option 4 assumes sewage is treated off-site at the Noosaville STP and maximises rainwater harvesting at
each residence, typical of IWCWMP systems in high rainfall areas. On site rainwater harvesting assists to
achieve a reasonable reduction in potable water demands.
An overview of the Option 4 servicing strategy is provided below:
. Domestic water supply: sourced from the municipal supply and domestic rain tanks (for toilet cisterns
and laundry);
. Wastewater management: sewerage from development precincts to the Noosaville STP;
. Domestic garden irrigation supplied from the domestic rain tanks;
. Roof tank overflow and stormwater flows through bio-retention swales and basins, prior to creek
discharge.
The domestic rain tank system in Option 4 lends itself to staged developments and does achieve compliance
with the demand off-set targets set in the Queensland Development Code.
While the reduction of potable demand via the use of rainwater tanks was considered, the overall sizing of
infrastructure, particularly water supply is governed by the supply of fire fighting flows to the site.
Northbrook Corporation Pty. LId Version 3 28 November 2012
5101-19 Commercial in Confidence Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.