Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (29.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

~,.., Carclno                                                                             Noosa on Weyba
                                                                        Water Supply and Sewerage Analysis




Table of Contents

1      Introduction                                                                                           4

2      Noosa on Weyba Population                                                                              5

3      Desired Standards of Service                                                                           6
       3.1         Water Supply                                                                                6

       3.2         Sewerage                                                                                    7

4      Noosa on Weyba Flow Projections                                                                        8
       4.1         Water Supply Demands                                                                        8

       4.2         Sewerage Flows                                                                              9

       4.3         Integration with IWCMP                                                                     10

5      Water Supply Network Analysis                                                                          11
       5.1         Servicing Strategy                                                                         11

       5.2         External Network                                                                           11

       5.3         Noosa on Weyba Network                                                                     12

6      Sewerage Network Analysis                                                                              13
       6.1         Servicing Strategy                                                                         13

       6.2         Network Analysis                                                                           13

       6.3         Noosa on Weyba Network                                                                     16

       6.4         Noosa Heads Sewerage Treatment Plant                                                       18

7      Conclusions                                                                                            20




Appendi              s

Appendix A         Background Data
Appendix B         Unitywater Hydraulic Network Anlaysis
Appendix C         Unitywater Response



Tables

Table 2-1      Noosa on Weyba Population Projections                                                           5

Table 3-1      Adopted Water Supply Network Planning DSS                                                       6

Table 3-2      Adopted Sewerage Network Planning DSS                                                           7

Table 4-1      Water Supply Demands                                                                            8

Table 4-2      Sewerage Flow Projections                                                                       9

Table 6-3      NVL040 Design capacities                                                                       15

Table 6-5      Noosa on Weyba Proposed Pump Station Details                                                   17

Table 6-6      Noosa STP Design Capacity and Current Plant Loadings                                           18




Figures
Figure 6-1     Eenie Creek Road Trunk Main Hydraulic Analysis Results                                         15




Northbrook Corporation Pty. Ltd.                    Version 3                           28 November 2012
5101-19                                      Commercial in Confidence                              Page iii

Used in these records

About this file

File size
29.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12_0208.pdf · 29.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.