Hydraulic Modelling Fee Request 2 ~,.., Cardno Shaping the Future
UnityWater
Water Supply Demand and Sewage Flow Projections
An adopted design criteria based on the 2012 South East Queensland (SEQ) Planning Guidelines was
adopted for this development. Utilising the adopted peaking factors, detailed in Table 2, the water supply
demands were calculated for the proposed development. Table 3 details the projected water supply
demands.
Table 2 SEQ Planning Guidelines Design Criteria
Additional Flow
Base Flow Unit Peaking Factors
requirements
.
Water Supply
-
-,-AD = 280LlEP/d 4 x PH:AD
..
-
... .
..
AD Average Day
-
PH -
Peak Hour
Table 3 Water Supply Demands for the Proposed Development
Options
The service development, the three options have been developed.
> Option 1: This option involves the delivery of the full supply to the development from a connection to
the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed 300mm
trunk main.
> Option 2: This option involves splitting the site and utilising two connection locations. One
connection delivering supply to the development would be via a connection to the existing trunk
mains along Eenie Creek Road to the boundary of the site via a proposed 300mm trunk main. A
second connection (200mm)to the existing mains along Lake Entrance Boulevard is also proposed
to service the western lots. The supply sources would not be linked internally.
> Option 2: This option utilising two connection locations. One connection would be via a connection
to the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed
300mm trunk main with a 200mm connection to the existing mains along Lake Entrance Boulevard.
The supply sources would be linked internally.
Scope Of Work
Cardno require the analysis of the Noosa water supply network to confirm the capacity of the network. As a
minimum Cardno would require the available pressures at the proposed connection locations for both a
maximum day and fire fighting scenarios for each option.
7501-19 www.cardno.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 7 of 37 Appendix 5 - Water and Sewer Infrastructure Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 29.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.