Skip to the record
Accept no substitutions.

Council archive · source document

Stormwater Management Plan_Issue C · MCU21/0175

of 37

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 28 July 2021



 Parameter                                                                                     Value


 Rainfall Threshold (mm)                                                                        1

 Soil Storage Capacity (mm)                                                                     18

 Initial Storage (% of capacity)                                                                10

 Field Capacity (mm)                                                                            80

 Infiltration Capacity Co-efficient a                                                           243

 Infiltration Capacity Co-efficient b                                                           0.6

 Initial Depth (mm)                                                                             50

 Daily Recharge Rate (%)                                                                        0

 Daily Base Flow Rate (%)                                                                       31

 Deep Seepage (%)                                                                               0


                           Table 1 – MUSIC Rainfall Runoff Parameters (Commercial)

5.3.3.4 Pollutant Export Parameters
Specific Pollutant Export Parameters must be applied to each node type as cited in the Water By
Design MUSIC Modelling Guidelines. The values shown in Table 2 are for split catchment
commercial areas.

Runoff pollutant concentrations are generated stochastically from the defined mean and standard
deviation.
 Land Use – Commercial                   Log10 TSS (mg/L)                   Log10 TP (mg/L)            Log10 TN (mg/L)


                                         Base            Storm             Base         Storm          Base      Storm
                                         Flow             Flow             Flow          Flow          Flow       Flow

 Roof                Mean                  0              1.30               0          -0.89           0        0.37

                     Std. Dev.             0              0.38               0          0.34            0        0.34

 Roads               Mean                0.78             2.43             -0.6         -0.30          0.32      0.37

                     Std. Dev.           0.39             0.38              0.5         0.34           0.30      0.34

 Ground              Mean                0.78             2.16             -0.6         -0.39          0.32      0.37
 Level/Open
 Space               Std. Dev.           0.39             0.38              0.5         0.34           0.30      0.34
                                Table 2 – Pollutant Export Parameters (Commercial)


 Excellence with Economy in Engineering                                                                                  11
 l:\8000-8999\8200-8299\8293\reports\28-07-21 stormwater management plan_issue c.docx

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan_Issue C.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.