Original source · versioned page text
Appendix H - Biodiversity Code
Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
wetlands and adjacent riparian zones are Biodiversity Overlay Maps OM1.1 to OM9.1, except Lomandra Park. A setback of 21.3m is provided to the
protected by – for- surveyed standing water level to the edge of Villa 4 works.
a) avoiding any new development in the a) temporary use of the land; or
riparian buffer area; b) infrastructure which provides access to a As part of the proposed development water quality and
b) retaining aquatic and terrestrial habitat watercourse for recreational purposes; quantity will be managed as per the attached Integrated
in riparian zones; Water Management Plan (IWMP) by Callaghan and Toth
c) maintaining wildlife corridors along OR Pty Ltd. A series of rainwater tanks and biopods will treat
watercourses and drainage lines for S5.2 Where constructing a Detached house or sediment and nutrients in stormwater flows to protect the
native fauna movement; Community residence and on an allotment situated water quality of the adjacent watercourse.
d) avoiding edge effects and wholly within the Riparian Buffer Area,
incompatible uses in riparian zones; a) fronting the Noosa River – development is A series of detention tanks are also proposed to ensure
e) maintaining bank stability by setback a minimum of 40m from mean high water there is no change to stormwater flows to the adjacent
minimising bank erosion and spring or as otherwise prescribed by the watercourse.
slumping; Environmental Protection Agency’s Erosion prone
f) maintaining water quality by filtering Area Maps; Weeds will be managed in the retained vegetation areas,
sediments, nutrients and other b) not fronting Noosa River – bushfire buffer areas and the adjacent Lomandra Park as
pollutants; and development is located outside the riparian zone per the attached Rehabilitation Plan 1714-20, 21 & 22.
g) removing undesirable plant species and setback a suitable distance from the
and replacing them with vegetation of watercourse having regard to the development
local origin; constraints of the property and the need to protect
environmental and riparian values;
OR
S5.3 For Animal husbandry on premises in the
Rural Zone –
a) stock proof fencing is installed along watercourses
at a distance of no less than 10m from the top of
the bank;
b) stock watering points are located no less than
15m away from the top of the bank of
watercourses; and
c) stock crossing points across watercourses are
defined and controlled with stock proof fencing, to
prevent stock from damaging riparian vegetation
or banks to watercourses;
OR
S5.4 Recreational facilities (including playgrounds,
pergolas, barbeques etc) are setback a minimum of
30m from the top of the bank of a watercourse and
10m from the top of the bank of a drainage line;
OR
C:\Users\User\Documents\JOBS\C&T\1714 Carramar MCU\Correspondence\Correspondence\Biodiversity Overlay_CarramarExtension_final.docx pg. 9
pg. 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.