PLANNING AND ENVIRONMENT COMMITTEE MEETING AGENDA 11 MAY 2021
Page 22 of 64
PLANNING AND ENVIRONMENT COMMITTEE MEETING AGENDA 11 MAY 2021
S | McCullough
=|Robertson
5) excessive traffic volumes within foreshore areas, on adjoining lands and within the
watercourse; and
c¢) unacceptable risks to personal and public safety,
' $12.6 Unit developments with common property along canal frontage met the
following—
a) amaximum of 2 jetties per unit development;
b) jetties are shared between unit owners;
Cc) aminimum of 20m separation is provided between each jetty;
d) the jetty is setback a minimum of 3m from the prolongation of boundaries; and
e) jetty heads and pontoons are not constructed (Refer Figure 14-37).’
AND
‘$12.7 For unit developments where each unit has its own individual canal frontage—
a) a joint application with the adjoining owner is made (Council is unlikely to support a
Jetty application for the exclusive use of one unit owner); and
b) Jetties are constructed as follows—
i. the jetty is shared between two unit owners;
fi. the jetty straddles the common boundary of the two units;
fii, jetty heads and pontoons are not constructed; and
tv. fencing between the two properties is setback a minimum 1m from the
revetment wall to allow for efficient access to the jetty by both owners (Refer
Figure 14-38)...”
Applicable Probable Solution
7.6 The preliminary merits issue is the determination of the applicable assessment benchmarks
(Probable Solution $12.6 as against $12.7). If $12.7 is found to be an applicable Probable
Solution, in our view Council cannot maintain its refusal, and should approve the application
because:
(a) the proposed development prima facie complies with Probable Solution $12.7;
(b) no other probable solutions are raised as potential non-compliances;
60909286v2 | Legal opinion — Australian Sunrise Citrus & Ors v Noosa Council - Appeal D209 of 2020 11
Page 22 of 64See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.