2021-05-11 Planning & Environment Committee Meeting Agenda

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING AND ENVIRONMENT COMMITTEE MEETING AGENDA                                       11 MAY 2021


7.    Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
      revetment wall.
8.    A rigid handrail must be fitted on one side of the walkway.
9.    No posts or vertical supports of the proposed jetty are to extend vertically from the structure
      unless they provide necessary support for the handrail.
10.   No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
      elevating a vessel above the water without Council approval.
11.   There must be no electrical reticulation system carrying electricity in excess of 24 volts
      beyond the revetment wall unless all switches and power outlets are positioned above the
      1%AEP flood level.
12.   Lighting associated with the use must be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
13.   Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
      5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
      a.    Located clear of this rock protection where applicable; or alternatively
      b.    Where the scour protection extends beyond 750mm:
            i.    Prior to driving piles, the rocks are to be removed to expose the geotextile and
                  the geotextile cut neatly to allow it to be turned back. During pile driving, care is
                  to be taken to ensure the geotextile is not damaged. At the completion of pile
                  driving, the fabric is to be turned down around the pile and the rocks replaced
                  around the piles
14.   The jetty is to be used for private purposes only with no commercial operations to be
      undertaken.
15.   Boat repair activities are not permitted on site.
16.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
17.   The mooring facility must not be utilised for live-aboard purposes.
18.   Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
      (1994) and the Environmental Protection (Water) Policy 2009.
19.   Certification by a Registered Professional Engineer of Queensland that states that the jetty
      is constructed in accordance with best practice methods and is structurally sound must be
      submitted to Council. This certification must be submitted to Council within three (3) months
      of the completion of the works. A final inspection and approval of the structure by Council’s
      Inspector is also required. Please contact Council’s Development Assessment Branch on
      5329 6500 to arrange the inspection.
20.   After completion, the proposed works must be maintained in a sound state of repair in
      accordance with the approved plans
      Performance Bond
21.   Security in the form of a cash bond or trading bank guarantee to the sum of $2500 must be
      submitted to Council, to secure performance of all conditions of this approval, prior to
      commencement of works. The cash bond or trading bank guarantee will be returned on
      performance of the conditions of approval less any costs incurred by Council in respect of
      enforcing performance of this permit. Council reserves the right to call upon the bond or
      guaranteed sum to effect compliance with conditions.




                                                                                        Page 5 of 64
Log in to download the original file

2021-05-11 Planning & Environment Committee Meeting Agenda(PDF, 11MB).pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗