Delegated Report - Code - MCU22 0139 CHANGED FROM COUNCIL REPORT [As Published] · MCU22/0139
Very large file (12.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
26. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
27. All planting areas on the eaves must be planted and maintained at all times, with replacement
planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
ENGINEERING
Site Access and Driveways
28. A sealed access driveway must be provided from Elanda Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and be generally in accordance with SCG Consulting’s
Driveway & Access Plan (33082-OW3.1, Rev. A) dated 23 October 2023.
Car Parking
29. A minimum of 2 covered car parking spaces and one additional space must be provided on
the site. The works must include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities
Stormwater Drainage
30. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. Disposal of stormwater must be undertaken without the use of mechanical
systems (pumps). The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with N. Koloff & Associates’ Stormwater Drainage
Plans dated 2 May 2023.
Services
31. Underground reticulated electricity and telecommunication services must be provided to
each unit/lot in accordance with the standards and requirements of the relevant service
provider.
32. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
33. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
34. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
35. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Document Set ID: 22625793
Version: 14, Version Date: 03/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - MCU22 0139 CHANGED FROM COUNCIL REPORT [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.