Appendix F. Civil Engineering Report Part 1

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Proposal plans, Traffic report, Landscape Plans & Civil Eng Report - MCU17/0572 & OPW17/0611.

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

                                                      Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                                   Ref: 20769 C R001 Rev 05 15.12.17
                                                                                                     December 2017

9.2.2    High-Risk Area Treatment
         Due to the greater probability of oil and petroleum discharge within the high-risk area, specific site
         requirements have been identified which include:

            The containment of any potential contaminants typically associated with fuel dispensing and
            bulk filling with a high environmental risk;
            The provision of a canopy directly above the fuel dispensing and bulk fuel unloading areas in
            order to intercept rainfall and minimise stormwater entering the area; and
            The separation of the high-risk area from surface runoff from surrounding uncovered areas.

         To achieve these site-specific requirements a bund will be implemented surrounding the proposed
         high-risk area in order to essentially separate the area from the remaining site. Runoff collected within
         this bunded area (the high-risk area) will be directed to an underground SPEL Puraceptor (or
         approved equivalent) to treat stormwater runoff and separate potential contaminants. Treated runoff
         from the Puraceptor will be directed directly to the bio-filtration basin. It must be noted that treated
         runoff leaving the Puraceptor will not be of an adequate standard to discharge directly to the Lawful
         Point of Discharge (LPD) and must be directed to the bio-retention basin for further treatment prior
         to discharge to the LPD. SPEL Puraceptors are manufactured to set capacities. The appropriate
         SPEL Puraceptor model will be selected to store the full volume of the largest compartment size of
         the fuel suppliers refuelling tanker.

         For further information on the conceptual layout of the proposed development refer to the
         development drawings prepared by Nettleton Tribe Architects in Appendix B. Refer to Appendix G
         for further information of the proposed SPEL Puraceptor.

9.3      Erosion and Sediment Control
9.3.1    Pre-Development Phase

         An Erosion Hazard Assessment has been carried out for the proposed development – refer to
         Appendix E for a copy of the completed Noosa Shire Council form. As a result of this assessment,
         it was determined that the overall site is a ‘low’ risk.

         Prior to construction commencing, the following erosion and sediment control measures will need to
         be installed around the subject site to minimise disturbance and ensure the quality of runoff
         discharging from the site is of an acceptable standard:

            Sediment barriers to be installed on all entrances to downstream stormwater infrastructure (i.e.
            gully pits);

            Designation of transport routes through the site to minimise vegetation disturbance;

            Maximise retention of existing vegetation to reduce soil disturbance and provide filter strip
            treatment for runoff;

            Install construction entry and exit shakedown areas;

            Sediment fences are to be installed on the downstream boundaries of the subject site; and

            Install dust control measures as required.

         All erosion and sediment control measures are to be designed and installed in accordance with IECA
         Guidelines. Further details regarding the proposed erosion and sediment control measures will be
         provided during the detailed design phase of the development.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                                Page 19
Log in to download the original file

Appendix F. Civil Engineering Report Part 1.pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.