Original source · versioned page text
Appendix F. Civil Engineering Report Part 1
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Proposal plans, Traffic report, Landscape Plans & Civil Eng Report - MCU17/0572 & OPW17/0611.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
Proposed Service Station – 175 Eumundi Noosa Road, Noosaville Ref: 20769 C R001 Rev 05 15.12.17 December 2017 16 CONCLUSION The site appears to be well serviced by reticulated water, stormwater infrastructure, sewerage, communications and electricity. These services will need to be connected during development. Information discussed in this report is inferred from DBYD records and information gathered via site investigation. To understand with greater certainty the requirements from Unitywater (UW) for this development, a Service Advice Notice Request has been prepared and lodged with UW with an expected issue date November 2017. The required infrastructure will be subject to the conditions attached to the Development Approval to be provided by Noosa Shire Council and any nominated referral agencies. As outlined in Section 8 of this report, ADG recommends no inclusion of on-site detention measures due to no net increase in post-development peak flow and an overall site reduction of impervious areas. In preparing this report, we have achieved all requirements for Stormwater Management Plans as described in QUDM 2013 standards, as well as a pollutant load reduction as required by the SPP 2017 and Noosa Shire Council standards. ADG recommends the use of the following treatment devices to meet the treatment targets specified by the relevant authorities: SPEL Puraceptor (High-Risk Area Only) StormSack (or approved equivalent) Gross Pollutant Trap (GPT) First Flush Device/s Detailed engineering diagrams and management requirements for the proposed development are to be submitted to Council for approval prior to any works commencing on site in accordance with an Operational Works Approval with design certification prepared by a qualified stormwater engineer or scientist. BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.