Council archive · source document
07/1764 - MCU - Detached House [As Published] · 132007.1764
so « ‘For more information refer to Guide 11. Hf you ticked (i) - the relevant Port Authority is the assessment manager for the application. if you ticked (if} Queensiand Transport is.a concurrence agency for the application. INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apri! 2007 State-controlled road matters 2. The application involves: (tick applicable box/es) For more information refer (o Guide 3. (1(i) development on land contiguous" to a State controlled road and for - Unless you answered “none of the above" to Q2, . : . , the application triggers referral to the Department (a) material change of use assessable against the planning scheme; of Main Roads (DMR) as.a referral agency. O (b) reconfiguring a fot unless - (n certain circumstances DMR will be an advice . : . agency, while in other circumstances DMR will « the total number of lots is not increased; and ; be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased; sae 2 Oe I Reaulaton qi assist youto C1 (¢) operational work (not associated with a material change of use assessable against the concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)- * associated with access to a State-controlled road; or « for filling or excavation; or « involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlied road. , O (ii) development on land not contiguous to a State-controlled road and - OO @) material change of use - « assessable against the focal government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; (1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation, 9 and exceeding the thresholds set by that schedule; @ C1 (c) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a fot mentioned in (b) above)- * assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. M1 (iii) none of the above ~ Clearing vegetation 3. The application: involves: (tick applicable boxes) For more information refer to Guide 12. oO (i) material change of use - Unless you answered “none of the above" to Q3, . . . the application requires assessment by the (a) assessable against the planning scheme; Department of Natural Resources and Water ining — (NeW), (b) on alot containing fan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or manager for the application, NRWisa « ifthere is no property map of assessable vegetation for the lot - remnant vegetation; concurrence agency for the application in relafon (c) where the existing use of the tand is a rural or environmental use; and if you ticked 03(9 of (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 Teferral to NRW for assessment regardless of O (ji) reconfiguring a lot - whether vegetation clearing is proposed or not. . aan (a) on a lot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation ) the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration is 2 hectares or larger; . (c) where 2 or more lots are created; and . (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 Oi (ii) operational work - , (a) for the clearing of native vegetation where the vegetation cléaring is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form 1 [i (iv) none of the above. Strategic port land 4. The application involves: (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI Act) - complete Part f of Form 1 (1 (il) a material change of use that is inconsistent with the fand use plan approved under the TI Act for the strategic port land - complete Part t of Form 1 MA (iii) none of the above 4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State- contralied road. Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1764 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.