Council archive · source document
07/1764 - MCU - Detached House [As Published] · 132007.1764
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local govemment tidal areas refer to Guide 24.
Unless you answered “none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency {EPA).
Itan agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
felation to this matter.
Local government is the assessment manager
for all prescribed tidal work.
Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
locat govemment tidal areas refer to Guide 24.
Unless you answered ‘none of the above" to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidal work.
Coastal management
For more information refer to Guide 18.
Uniess you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter. ©
9.
IDAS Assessment Checklist, Version 20, 2 Apri 2007
The application involves operational work that is: ( tick the applicable boxes)
Of
Oi)
D iil)
iw
tidal work"® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Of
tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; of
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any boxes (a) to (i) below are ticked.
(1 (a) _ constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal12 intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark; .
temoving or interfering with coastal dunes on Jand, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other @®
than State coastal land, above high-water mark; or
none of the above.
0 (b)
O©
Od)
Oe)
Of
Og)
Oh)
Ow
10. The application involves operational work that is: (ick the applicable box/es)
11.
OV
Oi)
Oil)
6 (iv)
tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
tidal work that is prescribed tidal work" - complete Part P of Form 1; OF ,
carried out within a coastal management district’ under the Coastal Act and for -
(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;
OD (b) reclaiming land under tidal water — complete Part M of Form 1; or
(1 ()_ constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;
none of the above.
The application involves: (tick the applicable box/es)
Ot
O«i)
Diy
ow
ww
work carried out completely or partly in a coastal management district"
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
the construction of a new premises with a GFA" of at least 1000m2
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1
none of the above
a material change of use assessable under a planning scheme involving —
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidat work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the (PA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidat area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act
16 GFA is defined in sch 14 of the IPA to mean the grass floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an arlificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway. .
Page 4
a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1764 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.