                      Site Access and Driveways
               27.    The communal driveway crossover must be constructed in accordance with Council’s
                      Standard Drawing RS-056 & RS-056.1.
               28.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete;
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties;
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway;
                      d.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               29.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
                      defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
                      uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing
                      the Plan of Survey.
               30.    Fall protection must be provided to retaining walls that are over 1m high.
               31.    Any retaining walls within the bushfire protection zone shown in Figure 6.1 of the approved
                      Bushfire Management Plan, must be constructed with non-combustible or fire resisting
                      materials in accordance with the Bushfire Management Plan.
               32.    Slope and batters are a maximum grade of:
                      a.      1 in 4 for grassed areas;
                      b.      1 in 3 for planted areas; and
                      c.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               33.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               34.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g. by blocking or interfering with natural overland flows).
               35.    The fill works undertaken must not result in any ponding of stormwater within the proposed
                      lot or on adjacent lots. Any reshaping works required to prevent ponding must be effectively
                      stabilised with turf or equivalent stabilisation method.
               36.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               37.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.




                                                                                                        Page 6 of 14
Document Set ID: 21885502
Version: 3, Version Date: 12/04/2022

Used in these records

About this file

File size
222 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001 ECM_21885502_v3_Minor Change Existing Approval OPW21 0134 01.pdf · 222 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.