Skip to the record
For the highest quality transcripts.

Council archive · source document

A1 Size Issue F Landscape Plan 215 David Low Way Peregian Beach 24 Feb 2... · MCU13/0251

Attached to the e-mail OPW16/0056 - Operational Works Application.

of 2

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
     
     

 

 

 

 

 

 

 

 

 

 
    

 

 

 

 

 

 

 

 

 

 

 

 

  
 
 
 
 
 
  
  
  
 
 
 
  
 
 
    
      
  
 
 
 
 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 

 

 
 
   
 
     
  
 
   
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
     
 
  
 
 
 
   
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

        

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\
LANDSCAPE PLAN I | i \ | \ K
| nar | | | a
wm 4p 45 50 3 60 : ;
| ' , ! \ \ SCALE: 7: 200
| \
35 | ' ' \
\
' 18x BIKE ke .
: i" | ! | ae | KEY TO PLAN
wn] | | 51.874 DRIVEWAY/PATHS
ls 18.516 CNV . \ EXISTING CAR PARK “oo”
| MAN\ ‘ \ & <8
‘ S -s
| — s 5 Hoe S S be S $ S EASEMENT? ° ~ RCPUM( LIRGIA(11} Le = 24
\ ow ow \Sw sw Tt Si wy ‘s 65.090 row " - 91°43! 30.333 \ I 4 TURF
wer Hotz 7 ; CORRUEG 3 Des fs BLOCK RETAINING WALL AND Tere ee”
: NS PON | hat Lome ETS eset ae
\ ‘ = = ——- 7;R_S z
\ — ()URGIA PN N ( —| HH | 7 TRELLIS Fr gio lp tgs ys OPENINGS MINIMUM 125MM). FENCE
\ . EXISTING CONTOURS
\ , oN / \ \ | \ LIRGIA-4 “ON TOP. RETAINING WALL TO __12-
S ( \ LRGIA(G) ~=—4 ENGINEER'S DETALS..
| | \ \ / a | | | FicPuM _ Hee —_ RL5988 PROPOSED SPOT LEVELS
\ (29) LIR GIA \ \ \ URGIA() + — '
Y SO | + | | | LR) INSTALL 900MM DEEP ROOT BARRIER
LOADING/SERVICE . \ \ BREASE | _
INSTALL FLUSH CONCRETE al 6000 \ » \ TRAP | TENANCY | , _ TENANCY TENANCY TENANCY —— —— LINE OF RETAINING WALL FOOTING
MOWING EDGE o \ | \ ’ { | : 2 3) 4 iReLus '
\ \ i | \ RL 6000 URGIAG) '
3. \ \ \ | / \ x COR RUB - 4—}<
- a
4 ' SUPERMARKET 7 | ‘
: SERVICE YARD \ \ ae | a Ivy a
\ RL 6000 \ MACHINE . PATH as ra ; 7
\ . \ { fen ae rc URGA Sa gt
\ , atp .* , .7
(G}CUPANA |] \ \ ‘ t af | 7 .
‘ / IR GIA "4g
\ ‘ \ \ ° LIR GIA - 4: OUTDOOR DiNI
" \ ‘ LIR GIA - 4 Fo, 8
ACOUSTIC. TIMBER \ \ | re
FENCE BY OTHERS \ LoL ot —_
~ | \ , | Pi /_,
3 | ‘ | INSTALL 300MM DEPTH TOPSOIL FIC PUM -1
8 | \ . DRIVEWAY OVER FOOTING AND 100MM
\ < DEPTH MULCH. NOTE: GARDEN \
| | \ HAS SUB-SOIL ORAINAGE
| )
_ ' LREKG) GLA Z
| |
a z ‘ \ TROLLEY / ounces —[— HYS (64)
ep aD. # wupcA PATH \ 0 non BELOW. TOP OF 8
<_, _peteyitey + 4 “rei. «eee oN petieg eg sft INSTALL ROOT. FOOTING aaa HELTER <
|. /\« |e 5]. 5 == : a a Js 4 a ; < / \ BARRIFR ' Satoh = ROVIDE 1150mm HIGH
\ : Se : ARRIER WITH VERTICAL
35) OM HYS 5 RRR GIA \ (4)UIR GIA | ‘ WLRGA — i —\ | \ ! \ | I = \ BALUSTERS THAT D0 NOj
(35) LIR GI \ - |
LIR GIA (4) UR GIA) 1 (HLIR GIA Lo? / | CUP ANA (2) ' 4 h = ACILITATE CLIMBING
/ i ' g
| ' : i yee 1)ACMB
| VT @URGA | / ; | CBR Kare =
INSTALL ROOT Vo ott | 4 ' too [scent \ / | Ed, i < Oo
BARRIER \ \ / — \ \ PS AY 8s : (6)GREC 3° —
' \ SS | | , BLOCK RETAINNG WALL. AND : (rad Q
\ XL — HEIGHT. POWDERCOATED aS)
1 c c METAL(NON-CLIMABLE” ANB xt
“om ns = \ (S)LIRGIA | {OPENINGS MNIMUM 1254). FENCE Q
SS La | _i or, RETANG Wall To
4 ENGINEER'S DETAILS. = gycarous / Cocare ESTMATED .
T. ZA {tone INSTALL ROOT ( (ACM BLU aT Tm ‘ |
11% rT /BARRIER eg INSTALL ROOT ,
: 3 — a BARRER one Wy
| & / \ . - {(3)LOM HYS Y - 1) CUP ADI
. ; J | roa) (OUP A
a “4 I | “om : ({CUP ANA yore cco
Y y _— PIS OR PIII LY / is
AO ag EI ERA . scone nih
mS (CUP ANA Ta / Lo PN | (5)LOMHYS [OCATE ESTIMATED! MATURE TREE
ee c (bP ana } 4 TRUNKS A MNIKUM OF 1100mM/ Hi , —— LOMHYS (AI Frno er
M = \ ; (41) /
apt Hole “> [ \ 45.378 PATH U! 5.200, AWAY FROM WALL / FENCE! “TRAN GROUNDCOVERS TO SPL d y A
P oO ~~ o j \ \ 9 \ | OVER RETAINNG WALL EDGE — “|b”
sw ——+~ @™ ~~ By, e - a 43 Cy oo Y !
2 /§ / \ | - abot CUP ADO ACM BLY ‘HOM BLU /
EASEMENT og) 8 boy __ EASEMENT. _| \ “| “ ANS me / / i) iso
41.404 x \ i B® é wyoPaR-2g—h ;
+) | y 5 AP TRILAU() 7 /~ Y Wy
oe te a to y % a LY fe t
we BLOB bs . eS clHorg =
A Type fei / 8) TURF SV Is \ E b SSSR INS A igs os
Ve EL TELE OM ws te _ es ; a
40064 3,000 Zs zits (22\GAH SEI \ 13.688 | 8.000 5.781 “ we ow! 2 ig ’ o SF 24, oo" (Se aX
~ INSTALL FLUSH CONCRETE \ (a) NOD \ ee a y
MOWING EDGE FNS \ pe BO. WR aS
INSTALL SOMM DEPTH SUGAR CANE MULCH To ~ _ (unycar ape \ 5 y = =
SURFACE OF BIORETENTION. AP2LY JUTE XS | BLO(K RETAINING WALL AND ‘.M“HEIGHT \ | mannoue- © / / / an ole en bescx ©
\ WEBBING OVER MULCH, ANB PIN DOWN AT N POWDERCOATED METAL (NON-CLIMABLE AND ow w Aw 39 - CARG
MAXIMUM 500MM CENTRES, KEEP MULCH 5 ~ | \ RETAN MINIMUM SMM) FENCE ,ON TOP. / i / / 7
AWAY FROHGBUNT STEM ‘8 RETAINNG WALL T0 ENGINEERS tetas. / oN / UNNAMED ROAD
y> 1 NL s0 ° Soe \ \ ‘ ’
/ /— TuRF/RE-TURE. NY * \ of HN , rs *¢ ds ab ds
/ / 1, DISTURBED AREAS / tT Y \ \ \ \ \
i \ L
7 LS <
0 \- a a a 4 Y \ se!
) / , be wan ove JZ J a “ \ \ /
/ ~* So vfiy < a \ -
/ / 4 a / —
f 4
/
4
SHEET SIZE:
MARK BALDOCK CLIENT: DRAWING TITLE PROJECT DETAILS: DRAWING NUMBER:| | ay”
Tel: (07) 36488436 ‘ ' _ DATE:
LANDSCAPE ARCHITECT 1 (G7) 3ac03975, «| SCAANLON PROPERTY |LANDSCAPE PLAN 215 David Low Way Peregian Beach | 501-LPI GY) Ess
(B.App.Sc.Blt.Env, Grad.Dip.Lands.Arch.) CURRENT ISSUE: G PROJECT NO:
Mob: (0407) 114 605 GROUP Qld 4573 : :
PO Box 373, Annerley Qld 4103 Email: [email protected] SCALE: 1:200 150)

 

 

 

 

 

 

 

 

 
Full text of the other 1 page

Page 2

 

 

PLANT SCHEDULE

 

TREES
ACM BLU
CUP ADD
CUP ANA
TRI LAU

SHRUBS
CAL ROP
COR RUB
MET THO

VINE/ESPALIER

BOTANICAL NAME / COMMON NAME

Acmeéna hemilampra / Blush Satinash

Cupaniopsis anacardioides } Carrot Wood
Cupaniopsis anacardioides / Carrot Wood
Tristaniopsis laurina / Giant Water Gum

BOTANICAL NAME / COMMON NAME

Callistemon viminalis “Rose Opal’ / Pink-flowered Bottlebrush

Cordyline terminalis ~Rubra® / Rulera
Met-osideros thomas: / New Zealand Christmas Bush

BOTANICAL NAME / COMMON NAME

 

FIC PUM

GROUND COVERS

Ficus pumila / Creeping Fig

BOTANICAL NAME / COMMON NAME

 

CAR APP
CAR GLA
GAH SEI

GRE COO
HIB SCA
{SO NOD
JUN USI
LIR GIA
LOM FYS
LOM LON

MYO PAR

 

2 x hardwood

Carex appressa / Tall Sedge

Carpobrotus glaucescens / Pig Face
Gahnia sieberiana / Sword Grass

(300mm height at planting)

Greuvillea cooroora / Cooroora Cascade
Hibbertia scandens / Guinea Gold Vine
Isolepis nodosa / Knobby Cubrush
(300mm height at planting)

Juncus usitatus / Sawgrass Sedge
(300mm height at planting)

Liriope muscari “Evergreen Giant® / Evergreen Giant Border Grass
Lomandra hystrix / Swamp Mat Rush
Lomandra longifolia / Mat Rush

(300mm height at planting)

Myoporum parvifolium / Trailing Myoporum

 

 

 

KEY:
COIN 100MM D=PTH MULCH
“7 | 300MM DEPTH TOPSOIL
LALL
Zz
BACKFILL PLANT HOLE WITH
IMPORTEC TOPSOIL

 

 

 

 

Form watering basin by mounding soil
around edge

 

 

 

 

stakes YJ

  
 

Finished grond leve| .
aay Excavate plant hole 2 x diamter of root ball,

and greater than soil depth of pot
Install (2x) slow release fertiliser tablets or

 

 

 

 

slow release fertiliser pellets into plant hole at
time of planting
Fill excavated plant hole with water and allow

 

 

NOTES:

water to drain away prior to installing plant.
Water plant and plant hole after planting.

 

-DO NOT PLACE TOPSOIL OVER ROOT BALL

-ROUGHEN SIDE AND BASE OF PLANT HOLE TO ENCOURAGE ROOT
DEVELOPMENT AFTER EXCAVATING PLANT HOLE

-TAMP BASE OF PLANT HOLE PRIOR TO PLACING PLANT TO PREVENT

SETTLEMENT

-WATER PLANT HOLE THOROUGHLY BEFORE AND AFTER PLANTING

TYPICAL TREE PLANTING DETAIL

 

1:40

SLOW RELEASE “—

32 9343.19-34

100MM DEPTH MULCH

0.10

ORGANIC MATTER

 

 

OT

 

ROOT BARRIER

TO 900MM DEPTH.
INSTALL TO
MANUFACTURER’S
RECOMMENDATIONS

  
  
  

 

 

TT; J Po eet
We I-III

 

 

 

 

 

 

 

CONT
1OOL
1OOL
45L
1OOL

CONT

300mm
200mm
200mm

 

CONT
200mm

 

CONT
140mm
140mm
Tubestock

140mm
140mm
Tubestock
Tubestock
14Omm
200mm
Tubestock

140mm

ORGANIC SOIL BLEND TO
AS4419, NO MORE THAN 30%

B HORIZON SOIL BLEND

WITH NO ORGANIC MATTER

TREE TRENCH OVER STRUCTURAL SOIL

 

3

1:25

P-CO-PER-O1

DENSITY
Ome
3/m2
B/m2

O.7/m2
3/m2
8/m2
8/m2
S/m@
3/m2
Bim]

3/m2

Qty
42
99

20
33
30

27

2i1
206
164

26

Install slow release]
fertiliser pellets
into plant hole at
time of planting

KEY:

WN 100MM DEPTH MULCH

EXISTING SITE SOIL

 

GH

 

 

CULTIVATED SUB-GRADE
Form watering
basin by
mounding soil
around edge

 

 

 
  
  
  

BACKFILL PLANT 4OLE WITH
TOPSOIL

 

 

 

__ Finished ground level

 

r— Fill excavated plant hole with water
and allow water to drain away prior to
installing plant. Water plant and plant
hole after planting.

 

 

 

 

 

 

 

 

 

 

Excavate plant hole 2 x diamter of root
ball, and greater than soil depth of pot

DYDY.

 

NOTES:

-DO NOT PLACE TOPSOIL OVER ROOT BALL
-ROUGHEN SIDE AND BASE OF PLANT HOLE TO ENCOURAGE ROOT
DEVELOPMENT AFTER EXCAVATING PLANT HOLE

-TAMP BASE OF PLANT HOLE PRIOR TO PLACING PLANT TO PREVENT
SETTLEMENT

-WATER PLANT HOLE THOROUGHLY BEFORE AND AFTER PLANTING

HRUB GROUNDCOVER PLANTING DETAIL

LANDSCAPE NOTES

 

1 GROUND WORKS

1 GENERAL
14 TOPSOIL
General

Topsoil to comply with AS 4419 'Scils for Landscaping’ & ASTM D5268-07 ‘Standard Spec for Topsoil’. Soil

conditioner to AS 4454 'Composts, Soil Conditioners & Mulches'.

Test both imported & Site obtained topsoil & potting mixes to AS 1289 (Methads of Testing Soil) &

AS 3743. Provide 1 test per 10 m3. Provide Soil Supplier Test Compliance Certificate.

Topsoil to contain organic matter 6-8% by mass & have sandy loam texture to AS 4419.

Soil organic matter to be 6-8% by mass.

Imported topsoil mix ta comply with the following:

- Contain organic matter which supports plant life.

- Components to be evenly cistributed throughout the mix.

- Mixes to be mechanically screened prior to despatch using screen size: <25mm.

- The mix is to be moist but still free flowing & of such moisture content that water cannot be
squeezed from it by hand.

- Material to be void 0’ ingrecients which d splay high shrinkage tendencies.

- Free of acrid odours (including those caused by excessive ammonia or organic acids),
chemicals & toxins detrimental to plants & human touch contact.

- Free of stones, clay lumps, weeds and weed propagules including Cyperus Rotundus
(nut-grass tubers), tree roots, sticks, rubbish, sharp items & other foreign matter.

- Free of pests and diseases such as pathagenic organisms e.g. Phytophthora spp and the
larval stage of insect pests.

SUBMIT detail of soil additives.

Topsoil Spreading

Topsoil to grassed and turfed areas: 100mm (min) thick.

Topsoil to planting areas: 300mm (min) thick (add 75mm to this min thickness for planting area crown).

Crown topsoil in planting areas.

Lightly consolidate topsoil to a smooth surface, free from lumps of soil and roots, ready for planting.

Progressively layer (max 100mm compacted thickness) & tamp topsoil to prevent voids & subsidence.

Prevent excess compaction.

Add new topsoil to subsided topsoi {inclucing during the Defects Liability Period) to bring the topsoil back

up to doc levels.

1.2. CULTIVATION

Cultivate to loosen the existing ground to subsequently receive topsoil.

Cultivaton depth for subsequent grassed areas: 150mm deep.

Cultivaton depth for subsequent plants & planting areas: 300mm deep.

Break-up cultivated earth so that pieces are less than 50mm. Remove stones exceeding 50mm, and any

other deleterious material fram cultivated earth including roots, sticks, weeds.

2 SOFT LANDSCAPING

2 MATERIALS

2.1 MATERIAL COMMON DETAIL

Provide plant life in healthy conditicn, without sca’ring or deformations. Establish plant life for optimum
growth ‘or the environmental conditions.

Continuously Work to keep plant life free of disease, and free of plant (weeds) & anmal pests. Immediately
replace failed planting.

2.2. MULCH

Provide mulch to AS 4454 'Composts, Soil Conditioners & Mulches'. Mulch to be free of deleterious and
extraneous matter including soil, weeds, sticks, roots. Mulch to be sieved to size to prevent accumulation of
mulch fines.

Spread mulches everly to amin depth of 100mm. UDO. Grade the finished surface evenly. Do not place
mulch in contact with stems of planis.

Mulch types - TEA TREE MULCH

2.3. CHEMICALS

SUBMIT a Schedule of proposed chemicals to be used in landscape construction & maintenance including
additives, pesticides, herbicides, un-doc fertilizer, disease treatments.

24 FERTILIZER

Deliver fertilizer to Sits in sealed bags, branded with the fertilizer type & Manufacturer name.

2.5 TURFING

Type - WINTERGREEN TURF OR SIMILAR

Turf to be free from weeds & other foreign matters. Turf to be comprised of consistently thick grass & root
(fully soiled) parts. Grass part to be 20mm thick, root part to be 25mm thick.

Evenly mix fertilizer irto the topsoil before placing the turf.

Lay turf within 24 hours of cutting. Preven: turf from drying out between cutting and laying.

Lay turfalong land contours with staggered, butt joints. Immediately after laying, roll turf with a 90 kg/m
roller. Fill joints & depressions with topsoil. On slopes too steep for rolling, evenly tamp the turf.
Immediately atter rolling, irrigate with a fine spray so that the soil is moist fo ¢ depth of 100mm.

Lay turf flush with adjacent surfaces. Grade falls evenly. Turf surface to be smooth & consistent.

When turf is established, mow at 25mm above soil level, remove cuttings & top dress max 10mm deep with
topsoil to fill joints and correct surface unevenness.

21 days after turfing, sroadcast evenly a minimum of 10 g/m2 of sulphate of ammonia fertiliser over the
whole of the area of turfing.

When the turf s established, mow at regular intervals to maintain an average height of 30mm.

Manually extract weeds that emerge in the turfed areas. Where necessary soray wth a selective broad leaf
weed herbicide.

Tolerance: Max 15mm under a 3000mm straight edge any direction.

2.6 PLANTING

Plant Quality

Plants to have well-balanced branching foliage typical of their species for the season.

 

1:20 32 9333-01

Plants to be free from pests, diseases, physiological disorder & nutritional deficiency, and be substantially
free from evidence of any previous disorder.

Plants shall have been grown in their final containers in environmental conditions similar to that expected
for where they will be planted, for min 42 days before Site delivery.

Plants to be planted in the sun are io be previously 'sun grown’ or 'sun hardened’, for min 42 days before
Site delivery.

Site deliver plants in pathogen free, weed free medium.

Plant roots to be undamaged, unrestricted. well-p'oportioned in relation to the size of the plant & suitable for
transplantation.

Legibly label each plant by botanical name, common name & plant characteristics, on a durable
weather-proof tag.

Tree Stock: Not to have co-dominant stems. To have crown foliage symmetry with no side exceeding 20%
of the lesser foliage side. North aspect of trees in the Nursery to be identified & trees planted with this side
facing north.

Plant Containers

Provide plants in new or sterilised recycled polypropylene containers or polythene bags of potting media
volumes, sized as follows, UDO:

Height (mm) Pot Diameter(mm) __ Potting Media Volume (litres dry)

 

 

 

 

 

 

150 140 2
200 200 4
300 300 13
400 400 45
450 400 76
500 500 404
Planting

Excavate olanting holes to a size that allows the following min amount of topsoil backfill beneath & around
the plant root system, UDO:

Plant Height at time of planting (excluding the root ball- mm) Thickness/depth of topsoil
around the root ball

 

 

 

 

 

 

 

0-300 100
300-500 150
500-1000 200
1000-2000 250
2000-2500 350
2500-3000 450
Over 3000 550

 

Thoroughly water plants immediately before planting. Thoroughly water the planting hole immediately
before planting.

Remove plants from containers with min soil oss & root disturbance. Lightly brush the root ball surface to
loosen root ends.

Position pants in the cetre of planting holes. Set plants plumb & at a level for natural relationship of the
plant with the ground surface.

Place slow release prolanged release type fertilizer around plants at the time of planting.

Backfill with topsoil to be firm around the plant without air pockets. Dish the soil around plants for water
capture (dish diameter to match pot diameter or root ball).

For plants to be over 2030mm tall at maturity, vertically embed in the backfill, a 75mm dia, 300mm length of
black colour, slotted agr cultural drain pipe behind the plant (protruding above the mulch 20mm) as a deep
watering mechanism. Place mulch to 50mm deep in the base of the pipe.

Commence planting immediately after Site delivery.

If unforeseen planting delay occurs, transplant plants into larger pots.

Do not plant in unsuitable weather conditions including extreme heat, cold, wind, rain.

Arrange sufficient off-Site plant quantities to allow for on-Site plant failures to avoid delay.

Replace dead or dying plants within the Site area during the period between on-Site start & the end of the
Defects Liability Period. Replace damaged plants within the Site area during the period between on-Site
start & Practical Completion.

Stakes & Ties

Plants with stems or trunks to be staked to give plant support. Stakes to be straight, undamaged, have flat
top ends & pointed driving ends.

Stakes & components (ties, caps) to be of a neutral & natural colour (ie grey, black, brown) which can be
achieved by painting.

Cap all stakes after their placement, with a neutral & natural coloured wired-on plastic safely caps.

Single stakes to positioned behind the plant (ie opposite the likely pedestrian traffic side), double stakes to
be positioned evenly apart & parallel to the likely pedestrian traffic side, triple stakes to be positioned evenly
apart with 2 stakes positioned behind the plant (ie opposite the likely pedestrian traffic side).

Position stakes outside of the topsoil zone oart of the planting hole.

Tie plant to each stake at the top 10% of the exposed to view stake. Tie also as required to straighten the
stem or trunk.

Remove stakes & ties no longer required to support the plant, at the end of the Defects Liability Period.
Stakes to comply with the following table, UDO:

 

 

 

Plant Height Stake Number Stake Size (mm) & Type Stake In-ground Depth/ Ties

(at time of Exposed Height (mm)

Planting

mm),

900-1500 2 38x33 HWD 300/1000 Plastic
1500-1800 3 50x59 HWD 400/1200 Plastic
1800-2400 3 Steel star picket 600/1800 Steel rope

 

Plastic ties: Proprietary ties.

Steel rope ties: 3mm dia galv steel wire rope, cut ends steel clamped, turnbuckle tension adjustment, plastic

guards against trunk, the loop dia around trunk to be 3 times the dia of the trunk at that tie point.

2.7 MAINTENANCE

Maintain construction Work. After Practical Completion, maintain the Work for 12 WEEKS to the coc

standard. Maintenance includes:

- Watering, fertilizing, pest & disease control.

- Mowing, weeding, aerating, removal of cuttings

- Pruning (to AS 4373), tne intention of pruning being to maintain healthy foliage or remove damaged
growth.

- Maintaining stakes & ties.

- Replacing damaged or failed planting.

- Top dressing & soil replacement/ re-topping, mulch maintenance.

SUBMIT detail of proposed:

- Pruning & plant replacement.

- Tree surgery Work.

- Chemicals to be used.

 

 

MARK BALDOCK
LANDSCAPE ARCHITECT

(B.App.Sc.Blt.Env, Grad.Dip.Lands.Arch.)
PO Box 373, Annerley Qld 4103

Tel: (07) 38488436
Fax: (07) 38923575
Mob: (0407) | 14 605
Email: [email protected]

 

DRAWING TITLE
NOTES

CLIENT:
SCANLON PROPERTY

GROUP

 

PROJECT DETAILS:
1501-LP2

DRAWING NUMBER:

SHEET SIZE:
Al

 

 

215 David Low Way Peregian Beach

CURRENT ISSUE: G

DATE:
dune 15

 

 

Qld 4573
SCALE: 1:20/10/25

 

 

 

 

PROJECT NO:
150)

 

 

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

A1 SIZE ISSUE F LANDSCAPE PLAN 215 DAVID LOW WAY PEREGIAN BEACH 24 FEB 2....pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.