Diamond St Minor Change - App A SARA Approved Plans

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                       1901-9327 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5).


 No.      Conditions                                                                    Condition timing
 Material change of use
 Schedule 10, Part 9, Division 4, Subdivision 2, Table 4, Item 1 (Planning Regulation 2017)—The chief
 executive administering the Planning Act 2016 nominates the Director-General of the Department of
 Transport and Main Roads to be the enforcement authority for the development to which this
 development approval relates for the administration and enforcement of any matter relating to the
 following conditions:
 1.       The proposed development, including the awnings and all permanent             At all times
          structures, must be carried out generally in accordance with the
          following plans as amended in red, to show all permanent structures
          must not extend into the state-controlled road corridor:
              Proposed Site Plan prepared by Verve Building Design CO,
                  dated 16.04.2019, reference 18043-DA02 and revision C
              Building Elevations and Perspectives Plan prepared by Verve
                  Building Design CO, dated 16.04.2019, reference 18043-
                  DA03 and revision B
              Building Elevations and Perspectives Plan, prepared by
                  Verve Building Design CO, dated 16.04.2019, reference
                  18043-DA04 and revision B
              Building Elevations and Perspectives Plan prepared by Verve
                  Building Design CO, dated 16.04.2019, reference 18043-
                  DA05 and revision B
              Level 1 & Roof Plan prepared by Verve Building Design CO,
                  dated 16.04.2019, reference 18043-DA06 and revision A.
 2.       Balconies on all units of the north facing elevation as shown on              Prior to the
          Building Elevations and Perspectives Plan prepared by Verve                   commencement of use
          Building Design dated 16.04.2019, reference 18043 DA03 and                    and to be maintained at
          revision B, must include:
                                                                                        all times
               (a) balustrades that are solid, gap-free and continuous for their
                   complete length other than gaps required for drainage
                   purposes in accordance with the Building Code of Australia;
                   and

               (b) highly acoustically absorbent material treatment for the total
                   area of the soffit above these balconies.
 3.            (a) Stormwater management of the development must ensure                 (a)      At all times
                   no worsening or actionable nuisance to the state-controlled
                   road.                                                                (b)      At all times
               (b) Any works on the land must not:
                    i.    create any new discharge points for stormwater runoff
                          onto the state-controlled road;
                   ii.    interfere with and/or cause damage to the existing
                          stormwater drainage on the state-controlled road;
                   iii.   surcharge any existing culvert or drain on the state-
                          controlled road;
                  iv.     reduce the quality of stormwater discharge onto the


 Department of State Development, Manufacturing, Infrastructure and Planning                             Page 3 of 8
Log in to download the original file

Diamond St Minor Change - App A SARA Approved Plans.pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.