Original source · versioned page text
Appendix 4 - Planning Scheme Code Responses
Performance Outcomes Acceptable Outcomes
layout includes pathways:
1. located in accordance with the
Pathways Network identified in
the Local Government Infrastructure
Plan; or
2. linking to the Pathways Network
identified in the Local Government
Infrastructure Plan.
PO17 N/A – no additional lots created – boundary
Development on land within activity centres with No acceptable outcome provided realignment only
active frontages are provided with access from
a rear lane or other access streets to reduce
potential conflicts with pedestrians and cyclists.
Open Space Network Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Open Space Network
PO18 AO18.1 N/A – no additional lots created – boundary
Development provides for parks, drainage Active parkland or open space which links to realignment only
reserves and open space infrastructure that:- active parkland is provided in accordance with
the Council’s infrastructure network planning;
(a) provides for a range of passive and
active recreation settings, offering a OR
range of informal and formal
experiences to the community; AO18.2
(b) accommodates adequate facilities to Park contributions are paid in accordance with
meet the needs of the community and is the applicable infrastructure instrument.
designed to maximise use by the
community it serves; AO18.3
Land intended for public open
Appendix 4 – Planning Scheme Code Responses
Reconfiguring of a Lot – Boundary Realignment (2 Lots into 2 Lots)
51 Hamersley Lane, Lake Macdonald – Lot 5 RP203483
81 Hamersley Lane, Lake Macdonald – Lot 6 RP203483
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.