Original source · versioned page text
Appendix 4 - Planning Scheme Code Responses
Performance Outcomes Acceptable Outcomes Response
Growth management
Rearrangement of Lot Boundaries
PO26 AO26 While it is acknowledged that the proposed lot sizes do
Development provides that the rearrangement The rearrangement of lot boundaries results is an not comply with the minimum lot size requirements, it is
of lot boundaries is an improvement on the improvement to the existing situation whereby the noted that the existing lot sizes were less than the
existing situation. size and dimensions of proposed lots comply more minimum area for the rural zone. It is also important to
fully with Table 9.5.1.4 Minimum lot size and note the resulting lot sizes ae in keeping with the
dimensions and at least one of the following is character of the immediate surrounding area. While the
achieved: lots are zoned rural, the primary uses on the subject land
and the surrounding areas is ‘rural residential’ with only
(a) the rearrangement of lots remedies an small-scale agricultural or horticultural uses.
existing boundary encroachment by a
building or structure; The purpose of the realignment is to improve land
(b) the rearranged lots will be made more management through the consolidation of the more
regular in shape; productive and long-established grazing parts into one
(c) access is provided to a lot that previously property.
had no access or an unsuitable access;
(d) the rearranged lots better meet the overall Furthermore, there is a significant improvement from an
outcomes for the zone and the local plan environmental perspective that now sees the waterway
area in which the site is situated; and associate riparian vegetation contained wholly on
(e) the rearrangement of lots provides for a proposed Lot 6.
significant improvement in rural
productivity; or
(f) the rearrangement of lots results in a
significant improvement in the protection
of environmental values.
If involving a standard format lot with common property such as requiring a community management scheme under the Body Corporate and Community
Management Act 1997
PO27
Community title subdivision only occurs once No acceptable outcome provided N/A
construction of approved buildings on site is
completed.
Appendix 4 – Planning Scheme Code Responses
Reconfiguring of a Lot – Boundary Realignment (2 Lots into 2 Lots)
51 Hamersley Lane, Lake Macdonald – Lot 5 RP203483
81 Hamersley Lane, Lake Macdonald – Lot 6 RP203483
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.