Original source · versioned page text
2022-08-18 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 18 AUGUST 2022
a. Commercial Business Type 1 – Office
b. Commercial Business Type 2 – Medical
5. The approved uses and associated activities must not result in environmental nuisances
such as noise, visual or odour impacts that unreasonably diminish the amenity of the
area or surrounding uses.
Currency Period
6. This development approval lapses if the use has not happened by 18 August 2028,
unless an application to extend the currency period is approved by Council.
Built Form and Development Appearance
7. The maximum height of the development must be in accordance with the approved
plans.
8. Certification must be submitted to Council from a Licensed Surveyor which certifies that
the buildings do not exceed the maximum height requirement of this Decision Notice.
9. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining properties.
10. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like.
11. The development must incorporate the colour scheme and proposed mix of building
materials as outlined in the approved plans (Perspectives, prepared by Buchan dated
18.05.2022).
12. Any exterior façade where plain concrete is used must be painted or otherwise sealed to
prevent staining and mitigate against graffiti.
13. Any security screens on the premises consist of grille or translucent screens and not
solid shutters, screens or roller-doors.
14. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary;
b. fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties. Where screened by landscaping, landscaping beds must
be at least 1.5 metres wide.
15. No part of the site may be used for outdoor storage of materials.
Performance Bond
16. Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond
or guaranteed sum to effect compliance with conditions.
Street Identification
17. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Water & Sewer Connections
18. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
Page 20 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.