                       AGENDA


         General Committee
              Meeting


          Monday, 12 December 2016

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington



   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2016-12-12 General Committee Agenda(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 75 (of 81)

Section 2

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


TABLE OF CONTENTS

ITEM                                                                                         PAGE


ATTENDANCE & APOLOGIES                                                                            -
PRESENTATIONS                                                                                     -
ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                              -
1      MCU6/0066 & OPW16/0133 - DEVELOPMENT APPLICATION FOR MATERIAL
       CHANGE OF USE FOR A SERVICE STATION, CONVENIENCE SHOP AND FOOD
       OUTLET AND OPERATIONAL WORKS FOR SIGNAGE AT 6 TAYLOR COURT,
       COOROY
       (Planning & Environment Committee Agenda, 6 December 2016, Item 1, Page 3)
       Refer to Further Report provided at Page 3 of General Committee Agenda
       Reason for referral: Cr Jurisevic disagrees with the recommendation

2      OPW16/0016 - APPLICATION FOR DEVELOPMENT PERMIT FOR OPERATIONAL
       WORKS - PRESCRIBED TIDAL WORKS (DECK) AT 2 PARKYN COURT,
       TEWANTIN
       (Planning & Environment Committee Agenda, 6 December 2016, Item 3, Page 32)
       Reason for referral: To allow the application to be discussed with all Councillors

ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                             -
Nil.
REPORTS DIRECT TO GENERAL COMMITTEE                                                              3
3      MCU16/0066 & OPW16/0133 - FURTHER REPORT - APPLICATION FOR
       SERVICE STATION, CONVENIENCE SHOP & FOOD OUTLET & SIGNAGE AT 6
       TAYLOR COURT, COOROY                                                                      3
4      MCU16/0090 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
       USE FOR WELLBEING TYPE 2 - SOCIAL (SUNSHINE BUTTERFLIES) AT 468
       MCKINNON DRIVE, COOROIBAH                                                                 7
5      DRAFT DEVELOPMENT ASSESSMENT RULES FOR NEW PLANNING ACT                                  27
6      ENDORSEMENT OF BIODIVERSITY ASSESSMENT REPORT                                            36
7      AWARD OF TENDER 1516T043 WASTE MANAGEMENT CONTRACT 2017 - 2024                           42
8      LEASING OF THE DEMOUNTABLE BUILDING AT BICENTENNIAL COMMUNITY
       CENTRE                                                                                   62
9      NOOSA BIOSPHERE RESERVE BOARD ANNUAL REPORT                                              64
10     OYSTER RESTORATION PROJECT - ACCEPTANCE OF DRAFT RESOURCE
       ALLOCATION AUTHORITY CONDITIONS                                                          68
11     FINANCIAL PERFORMANCE REPORT - NOVEMBER 2016                                             75
CLOSED SESSION                                                                              -




                                                                                       Page 2 of 81

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                           12 DECEMBER 2016


REPORTS DIRECT TO GENERAL COMMITTEE
3                        MCU16/0066 & OPW16/0133 - FURTHER REPORT - APPLICATION FOR SERVICE
                         STATION, CONVENIENCE SHOP & FOOD OUTLET & SIGNAGE AT 6 TAYLOR
                         COURT, COOROY
DOCUMENT INFORM AT ION




Author                               Development Planner, Glen Conforti
                                     Planning & Infrastructure Department

Index                                ECM / Application / MCU16/0066 & OPW16/0133

Attachments                          1.   Plan of Development for the Industrial Estate

EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the reports by the Development Planner to the Planning & Environment
Committee meeting dated 6 December 2016 and the General Committee meeting dated 12
December 2016 and refuse Application No. MCU16/0066 & OPW16/0133 for a Development
Permit for Material Change of Use of Premises - Retail Business Type 2 Shop & Type 5 Vehicle
Uses, Entertainment & Dining Business Type 1 - Food & Beverages and Operational Works for
Signage, situated at 6 Taylor Court, Cooroy for reasons outlined in the Planning & Environment
Committee Meeting Agenda dated 6 December 2016.


REVIEWED REPORT
1.                       BACKGROUND
A report on this application was considered by the Planning and Environment Committee on 6
December 2016 (Item 1, Page 3) and was subsequently referred to the General Committee
Meeting. During the course of discussions at the Planning and Environment Committee meeting,
Councillors requested additional information in relation to:
                       Information on the off-site effects of modern service stations;
                       Setbacks in relation to the Seqwater Development Guidelines – Development Guidelines
                         for Water Quality management in Drinking Water Catchments; and
                       Clarification on the 10 metre landscape buffer to Holts Road.
                       The impact on the Myall/Elm Street intersection


1.1. Off-site effects of modern service stations
Council’s Environmental Health Officers with extensive experience in Brisbane and Noosa Local
Government areas have observed numerous occurrences of leaking underground petroleum
storage systems (UPSSs) of older service stations. Information on impacts of modern service
station UPSSs was not able to be accessed in the time available. A message has been left with
Seqwater water Monitoring Department with no response at time of writing this report.




                                                                                                 Page 3 of 81

Section 4

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


1.2. Seqwater Development Guidelines 2012
The following Table 1 compares the developments setbacks with the Seqwater Development
Guideline’s setbacks for Dangerous and Hazardous Substances Management, Storage and
handling with the developments’.

Feature                                  Seqwater              Proposal (Approx. distance)

Surveyed bank of an intermittent water   50m                   Drainage line/feature 110m
course


Surveyed bank of a permanent water       100m                  250m
course

Water supply well, bore and/or dam       250m                  370m

Nearest cut, embankment or other point   30m                   N/A
where effluent might surface

Upper flood margin level of an urban     400m                  4km to Lake Macdonald
water supply storage

Natural grade                            10%                   4%

Flood immunity                           1 metre above 1 in    N/A
                                         50

1.3. 10m landscape buffer to Holts Road
The original condition of the approval for the industrial estate required an increase in lot 4’s size
to allow a suitable building area and a 10m landscaped buffer to the Holts Road frontage. Lot 4 is
shown on the Plan of Development (POD) as Attachment 1. As part of the representations to the
condition of approval, the applicant at the time advised lot 4 would be dedicated as road reserve.
Lot 4 was therefore never increased in size but subsequently dedicated as road reserve. An
extract from Councils Senior Planning Officer representations report is provided below:
    ‘The applicant has since advised that they would prefer to enter into an agreement with
    Council whereby on the cessation of the Boral Timber office, lot 4 be dedicated as road
    reserve. The applicant has also advised that they would be prepared to ensure this area is
    clear of any contaminants, buildings removed and that a strip be planted. The applicant has
    advised further that Boral Timber are long term tenants and that this dedication may not
    occur for some time. This approach is considered reasonable, as the proposed lot
    dimensions are adequate for the need of Boral Timber and permits in the long term a buffer
    to be achieved of the development to the Bruce Highway’.
Condition 11.5 of the approval required a 10 wide buffer to Holts Road. Condition 11.5 reads as
follows:
Condition 11.5
    Lot 4 shall be amended to be a minimum of 40 metres wide in order to incorporate a future
    10 metre landscape buffer to Holts Road. Alternatively Council may accept a legal
    agreement that provides for the dedication of lot 4 as road reserve on the cessation of the
    Boral Timber office. Where lot 4 is dedicated to Council, this land shall be free of any
    contaminants, buildings/structures removed and a 10 metre wide buffer to Holts Road
    planted in accordance with Council’s Policy on Landscaping Guidelines. All reasonable
    costs associated with the legal agreement shall be reimbursed to Council.
The intent of the POD is for a 10m wide landscaped buffer to the full frontage of Holts Road to
screen development.

                                                                                       Page 4 of 81

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                     12 DECEMBER 2016


1.4. Myall/Elm Street intersection
Council’s external traffic consultant suggests the proposal would have a negligible positive
impact on the intersection.


2.      CONCLUSION
No further information could be provided in regard to the off-site impacts of modern service
station due to time constraints, but substantial evidence of older service stations leaking UPSSs
has been identified. The development meets the setback requirements of the Seqwater
Development Guidelines 2012. The intent of the POD at the time was to have a 10m wide
landscape buffer to the full frontage of Holts Road after the dedication of lot 4. The
recommendation remains unchanged.


Departments/Sections Consulted:
     Chief Executive Officer                    Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                                Waste & Environmental Health       Revenue Services

     Executive Office                       X   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                             X   Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                                Page 5 of 81

Section 6

Page 6 of 81

=
z                                                                       f              s.  §         i                                                                   3      °       a
i                                        :       ¢i.g          ER          Uae         ie            ;                                                                   aif           ©
       >                       p         t           ae        4    $     lead se e |  ay  BF        5         ters
=           ob                  fos    p HE, Pee                    .   WER SF      |g 2 3!          y     8    ee:                                                    g                Ss
       >                g      &   c.f ete     b 4  beee —    cs    EE  Besatete    toss   2     Ma  f    25   BREts                                                   g      als}      2
ITCitkE                E           ES dstus   FE BRE      ¢   ce    MS  isssoses    ¢  g2  fs     ays     OE   Masts                                                   a+,             o
 oO   Sk          EE           e   b8 peeks   go gate §       se    fs    Fog   gf Sge8s         ee   o-  ke Bes ah
      =f          EE   &       Soci tebe)     ba    pees  §   SE    Mp    lees at   tbe    re     Bey sf}       ~$ 2)                                                       318
      cee   Bs    5     '      £   $6  sbogt   ££   F25g 2    2     Be    Ee  3g g  os 3h  Ef    §        te    Bios:                                                                   ®
CeehkeE             E          fpf     Estee peg tetas        gt     ME   [Ra dd    eghe a            tis      Bile                                                                     D
Fei               #    i:      e   #2 poegs $62 cag 5         22    Bie   LE        gepeey        Bes boot     Beet!                                                                    o
       —.         <    is       ROS PecKe        &      s £   3F     .    Hes   ig | 2 gees       33      3%     t
-Kceek            i   EE       §   28 ole:     Ges tes ¢      $F    be  Ka sie      2  otice      Boe tock     Bal:                                                           2        ou
      pie         Be    Bout       Ede              pcre            BRS       ap       tes       chy      GE   OBESE                                                        | @
x     255    Bis  2     ,     *F    steko e    st   this «    sf     af tH sloszaz   & 35282      so  §   «gh   234%                                                             o
      cee    My   BE    Be    och  edbesedi Ggesttee £        sf    NE eee    gig   z  taxce      Piss (gS      Babs                                                        |
      eos   BS          ‘     SP   FO8EEos     casacace 3     z=    os   eeceegce   ¢  Panes      SER     Of Bek Se                                                           5
      tes    EP   $     2     Sh   pegeegie ee ertars &       as     Be   Bisel gg) 8 ERRSE       ge  s   ¢5    BS
      si          fe  Re      go   gegbense    ofegrety   ©   29     BSE akg  gg    eetgete       Bat sop 8     Mba?                           e           2                |
      ‘ls    EP   3     5     =5   Bes    its  SoRaRece    &  ee    BE    iyigd) 8 8 oe Ebbe      ge  &   }    oss                                                            e
      25    9     .     Ly    bo   gEepeses    S3eabsas &     5      ABR   gg | Sgeeets           tg  t   fs    ehey                            ‘          ¢             <
      Set    BS   OE    OS  oc 22  stg eeay    Suse pee   #   83     sf) 2 8         spiguc       Bes t   $h   Bees                            =           =             >|   25
      Skee        Be  fi, uc Ss    Salevia’ ¢ fpeees te cs           te              irderts,     fee     cf    meet.                          e           S                  os
      sia    Be   BS  Be  2S 32    spe Gstapee peeks      25 Es     Bis              Epsgege:     MSS ge  bP   Bo i2as                         5s    2     §                  Eo
      eos    fe   EE      Ss Tag ceagsces gpetpise bs 88           Ess        .     seroscet      Boe gr  iy    Beebe                          8      i    &                | az
      abe    Be   fis Bi ct ct; see hhiug eds ratte       a2 e:    fee        bg    bbedpise      Bes G2  FE Boa dee                            Ss   >                           z
      feo    Bs   s    it ub $3    HG ibieetineh gia #¢            «Bes  Bs   $  >  sehbeene      RF  os} re   eget;                           ie     5    2                | oz
      rep    Me   is?   Be 2i20i3 erititlibetirins tea: MOREA                 gs    sssaee        Bee ce  fe Mea tt                             @     8  ¢€              §|   $9
        s         25   Be reSkE See seidecctcenssg ess         t   «Bes    :         Sgsecatt     Moy fe  $      ; 538                          5    %     °              -   =
      cee    Be   BSS By cs Hh              a                      -                 eieere       de  Ef  sy   areas                            .    ©                        Sz
      be    Bae   Moe  Boge acvk Ziprctassssaes               ef   Bee |] a   ce ig)  fe.         Pe  ge  t     45553                          7     =     s             s|   6
      Sak   Bee  Bek   Bee         <28                        ste    Be ||    8 2    ee           Aboay   ak    Begins                          ‘    2     og            &#   O6
      cht  BS:   Bet  Bo?          ges                        eco  Biss             Be                                                          ;     8    =             o,   Be
      she mee    Bes   Boa         ht                                                                                                           5     $s   &            :e|   &
        24                                                                                                                                     »      :    5            fa|    ~o
                                           i                   t                                                      J                       ws      |                        aie
         5       F                  §      i                   i                                                     ,                          !     |
                                                                                                                                                      |                 ag 2%"
         7       ‘                         a                  i      i                                            :                             \    u                        w
         i       +t                 i      }                  i      i                                                                         oe
         =       ;                  i      i                         é                                                                          |                             <
         i       te                 :      OE:                 :                                                                                |
         $       i                  $      i                   i     é                                                                                          3        |e
                 i        :         i                          ;     og                                                                         g             33         z|”
         i       S322     §         :      5                   '     if                                                                         <             28         wi}  w
         Peel:                      oR Et                     mi                                                                                iin                      lilg
         ;       Bald]              :      -                         owe                                                                        =             2
         bg      388  8   2         2      :                   :     3                                                                          a       e     $2
         2       333      f         S                                  j                               $                                                z     38         of
                          :                                            ?                              9         g                                       a     =             |
                          ‘                                            é                              4         &                               2       «     °          ie
                    ;                          sr?         f|          .                                        s                               §       gs    ss         wiw
                    S 2.  Zea  tf                 3  3    : 3          ¥                                        2                               ?       ¢     <S         >
                 15       otk Se               205   5   38          fed                                        e                               5       8     87              >
                 go       88 tf                aon   bees            he                                         ah                              3       &     &£         us
                 5s       teist, fi            CRE   PPETE           +:                                         ge                              2       z      Ss        a
                  aif     boetee               Ete yh 8              + 3                                        en                              3       &     83            |=
                 Brag?)   gititaed             $host ce              te                          ;              So                              3       g     a?         u=
          Pye h           Teme         ihe gee tite           Sh aes                               A.           oe                              8       8     88         Fila
         gn fey Pneitis                 Pots Peek aay           i Hee?                        e\                3                               i                        <    wi
          CRBREE: RH GGHT TBE TE a                                                           FNS              GF                                                         ro
         RC  GIBESE cra  feebrenQoBht gUBME ges ce}      23    Bt? GiB y                    :        Ss         &                                                        no
         a2 Sheets tga PSteree te    + ees   gba     SESE MRS pee                                     A                                    2
        ie       SEPSR Eo aaka HBSe     rages                                              >            a                                                                 Ke  o
          2 raBS                                                                                    ,    ss                                os
                                                                                          {                 Ki                                                           a 0
                                                                                                       Ble                                 “1                           = See
                                                                                                         a     N                                                        a
                                                              /                                                  ~
       a                                                     /                  d                                    .                                                       wi
      :                                                     /                   j                                      \                                                     >   ¢
       EE                                                                       i
       c- 2f                                               e       S            ?                                         \                                                  xe)
       ee OS                                               s      1s           Ls                                       \                                               Sj So:
       is  gt                                             e      &                                                      1                                                    oe:
       ag  Es                                           g       b              ;                                        \                                               S522:
       gi &%                                           “s      ‘              ‘                       2                Rat                                              E°. 85:
       bz  22                                                 S/                                   wos                   \                                                   wat    a
       se  28                                                Ss    3         i                        2              \  4   \                                           gee         t
       4F ij                                        bey             se                                               st.                        .                       Gn   se:   .-
        Ls                                                         23       Ps                        a                      \                                               &  ¢
       ne                                         So =          eee                                                  sta                      3                         ‘Hye 23233
       53 of                                     es                BEA                                                                          &                       Bossi:
       BS 85                                         OS         \  ae                                                  \  YY                    %                           zs:
       BS ES                                        y           Ss    SK                                                                        &                       OG        a<3
       ez #                                                       SMO                                                       \                             ©             Oem #5255;
       a, BS                                                   :      ~S   Mina            s        33 ae                    \                            4                  own    &
       EE  EE                                     $           3         :                 5                                  \                            2                  Zghaus
       Ei                                        €            SP yw     ane               Fd          BE                   \\\                            g             Bie.
       sf <?                                    o             =m     Be        ee see     1                                   \e | ge                     7             he   ee
       Ee 5D                                   ¢                             Ogg  Sige        fax                              S\  Ue                     +                  zo   ¥5
       “2                                     as                        a      Oe             Lea                            \ \e\ gt                     =             @8s*;
       y2 *3                                  /                        Sa         Gy            ae         z                  \\2                         :             Baz:
       Bs Se                                 /            a          ip ie     a “y                              sizy9         &                          =
       zy  Ss                                                -                x    ™    SS,                                                                :                     a4
     ae    is                              ,              eg                 fee       SS MeOy,        =      ow              \                         ao                     4 5
       3 wd                                                   /                    rN    \E          oe                         &                       <<                       i 2
                                                             /                     Hy      AN  8 /E                              \g                     &§               aj       f
                                                   $      /    =                            baz                                  5                      oe                   “gS
                                                           a                       =      ~    2"    |=                                                 BS                 ‘erm     |e
                                                  &                    Z             wf          y                                \                     eee                    “
                                                    +                                oi                                           5                     a 3 §
                                                        oe          ms              #8 &        {Ae                          2     |                    mee
                                            ag       |                                       &        i      os               3    |                    Seep            |
                                             =        /                                  Ss          8          =              re  |                    See              P) 2) 8) 8)
                                                                                      =                         °              a                        a                        =  £
                                          é         :                              he  yay                      2                   \                   Eas               tt
                                          4        /                              Fis chimes                                                            a. xe              g| $i:
                                         2                                       J   eh  ee)                                        \                   age             §/5/8/   8].
                                        s                                       >       2                                                               -ogn            SiS)  818i
                                                    .                               3                                               |                   bode
                                               ag                             oe       3                                                                ari                     |
                                                    =                           4s ee                                                  |                nls                  oF
                                                                               /         er aa                                         \                                      -
                                       3                                              s                          a              -                        esee                  =
                                                                              /                                                                                               5
                                                                                                                                        \                                    3
                                                                              /                                                                                               -
                                                         2                   /                                                          \                 s                   5
                                                      <3                     /                                                          a                  §    of            :
                                                                           |                                                         St   |               gnee                 |
                                                                           2                             &                            an                 E238
                                                                           }                              °                                  ’             Be                  |      !
                                                                         8                            aS                                   \             o8 Bot
                                                                          ]                              s                                              |e8 &!                 \
                                                   tee                   /                                                                es            EE: of           4
                                                                                                                                                         Pek §
                                                                                                                                                         ess.           4      Hl
                          ‘                            “~e              /                                                                        \                         T      aA
                           8                                ~\                                                                                    ‘                     5/8181 8)81.| oe
                           §                                 ~~         /                                                                                               Sa} 3) 3 z
                           s                                    -      j                                                                                                 ++-+-+-4—5 We
                           3                                           /                                    ——           —                                              iz iulalela| 38
                           3                                         “i             =              ~[eatie 2,00                                                          Pll      gs
                                                                                                                                                                         #4)   |  i
                  ;                                                                                                                                 73  +   ~—          slaia| el | Bis
                                                                                                                                                                        3} 4\a| | ni
                                                                                                                                                                        iE 3)
                                                                                                |    e08 S¥,c0                                                          aelg  ae “f
                                  a                                     s                       |                      ,                                                Bab   eute
                                      .                                {8                                              g                                   <3           alata 3 late
                   Oy                                                   8                                            “3                                     BS          i 3314) lee
                                                                        s                                                                                   S\N         olzialzle| | ab
                                           za                           Gj                                             &                                                olslelmiel | ty
                   Ay     ey                   ss                                                                     ia                                                ERs       tf
                    thy     yp                                                                                                                                          ia ls/alt ust
             AD       Oy
5	1	1	1	149	3	461	3234	44	39	51	4y,
5	1	1	1	149	4	2103	3274	25	32	0	le
5	1	1	1	149	5	2127	3274	64	35	0	lelslal
5	1	1	1	149	6	2201	3267	17	49	58	|
5	1	1	1	149	7	2221	3279	50	33	0	99
4	1	1	1	150	0	237	3247	2034	88	-1	
5	1	1	1	150	1	237	3247	71	28	36	eu
5	1	1	1	150	2	433	3263	18	24	30	2,
5	1	1	1	150	3	2017	3303	6	10	92	\
5	1	1	1	150	4	2099	3299	92	32	0	S19/SGicl
5	1	1	1	150	5	2196	3294	23	45	74	|
5	1	1	1	150	6	2222	3312	49	23	24	peak
4	1	1	1	151	0	231	3264	2040	102	-1	
5	1	1	1	151	1	231	3264	77	49	56	\G
5	1	1	1	151	2	446	3273	31	32	35	In,
5	1	1	1	151	3	513	3268	30	31	26	“29
5	1	1	1	151	4	2031	3326	8	12	93	\
5	1	1	1	151	5	2099	3314	66	52	0	ISiele
5	1	1	1	151	6	2170	3320	21	42	8	gl
5	1	1	1	151	7	2221	3334	21	23	16	38
4	1	1	1	152	0	275	3290	1982	95	-1	
5	1	1	1	152	1	243	3299	51	12	31	WY
5	1	1	1	152	2	472	3290	32	32	47	%
5	1	1	1	152	3	2099	3345	85	40	0	aisialei3|
5	1	1	1	152	4	2203	3330	11	59	74	|
5	1	1	1	152	5	2221	3344	36	32	29	Ag
4	1	1	1	153	0	2099	3366	172	44	-1	
5	1	1	1	153	1	2099	3389	20	5	20	el
5	1	1	1	153	2	2146	3366	67	42	0	elol@l
5	1	1	1	153	3	2221	3375	50	35	0	assy

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                            12 DECEMBER 2016



4                        MCU16/0090 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
                         WELLBEING TYPE 2 - SOCIAL (SUNSHINE BUTTERFLIES) AT 468 MCKINNON
                         DRIVE, COOROIBAH
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Planning & Infrastructure Department

Index                            ECM / Application / MCU16/0090

Attachments                      1.   Proposal Plan
                                 2.   Concurrence Agency Conditions


         APPLICATION DETAILS
         Applicant                           Sunshine Butterflies Inc
         Proposal                            Development Permit for Material Change of Use of Premises -
                                             Wellbeing Type 2 – Social (respite centre)
         Properly Made Date                  18 August 2016
         Information Request Date            7 September 2016
         Information Response Date           4 November 2016
         Decision Due Date                   15 December 2016
         Number of Submissions               3 Submissions (1 objection and 2 in support)


         PROPERTY DETAILS
         Property Address                    468 McKinnon Drive, Cooroibah
         RP Description                      Lot 2 RP 214534
         Land Area                           20200m²
         Existing Use of Land                Sunshine Butterflies


         STATUTORY DETAILS
         SEQRP Designation                   Rural Living Area
         Locality                            Cooroibah
         Zone                                Rural Settlement
         Overlays                            Biodiversity Overlay – Environmental Protection
                                             Natural Hazards Overlay - High Potential Acid Sulfate Soils
                                             Natural Hazards Overlay – High and Medium Bushfire Hazards
         Assessment Type                     Impact




                                                                                                   Page 7 of 81

Section 8

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 12 December 2016 regarding Application No. MCU16/0090 for a Development Permit for
Material Change of Use of Premises - Wellbeing Type 2 - Social (respite centre) situated at 468
McKinnon Drive, Cooroibah and:
A.   Approve the application in accordance with the following conditions:
           PLANNING
           Approved Plans
     1.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.

            Plan No.       Rev.    Plan/Document Name                                Date

            L002           A       Landscape Concept Plan, prepared by Sunshine      20.9.2015
                                   Gardens

           Nature and Extent of Approved Use
     2.    The approved use is Wellbeing Type 2 – Social being for a respite centre for people
           living with disabilities and their families and associated ancillary office and agricultural
           uses. The approval does not include a cafe.
     3.    The maximum number of special events per year is six (6).
           Landscaping
     4.    Existing trees on the site and within road reserves must be retained, except where
           required to be removed to accommodate the approved use.
     5.    All native trees must be retained within the Biodiversity Overlay. The area must be
           rehabilitated with koala food trees such as Eucalyptus robusta, Eucalyptus
           tereticornis and Eucalyptus grandis
     6.    Screening vegetation must be planted along all boundaries in accordance with
           Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines and the
           approved Landscape Concept Plan. The planted vegetation must consist of native
           and endemic species.
     7.    A minimum of 3m of screening vegetation must be provided between the boundary
           and any car parking.
           Built Form and Setbacks
     8.    The maximum height of the development must not exceed 9 metres at the pitch of the
           roof above the finished ground level and the natural ground level and must be 2
           storeys.
     9.    All buildings and structures must be setback a minimum of 6 metres from all
           boundaries.
           Performance Bond
     10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
           must be submitted to Council, to secure performance of all conditions of this
           approval, prior to the issue of a Development Permit for Operational Works. The cash
           bond or trading bank guarantee will be returned on performance of the conditions of
           approval less any costs incurred by Council in respect of enforcing performance of
           this permit. Council reserves the right to call upon the bond or guaranteed sum to
           effect compliance with conditions.

                                                                                        Page 8 of 81

Section 9

GENERAL COMMITTEE MEETING AGENDA                                            12 DECEMBER 2016


         Street Identification
   11.   The street address of the development must be clearly visible and discernible from
         the primary frontage of the site by the provision of a street number and, where
         appropriate, the developments name.
         ENGINEERING
         Site Access and Driveways
   12.   Sealed access driveways must be provided from McKinnon Drive to all parking and
         manoeuvring areas of the development. The works must be undertaken in
         accordance with the Department of Infrastructure, Local Government and Planning
         response reference number SDA-0816-032888 dated 7 November 2016 and
         generally in accordance with Council’s standard drawing RS-056.
   13.   Approval from the Department of Transport and Main Roads for the final design of the
         site access and driveway works must be submitted in writing to Council prior to the
         issue of any Development Permit for Operational Works.
         Car Parking
   14.   A minimum of 21 car parking spaces must be provided and marked on the site and
         made available and accessible at all times while the use is open for business. The
         works must be undertaken in accordance with an Operational Works approval and
         must include in particular:
         a.   service vehicle parking, manoeuvring and standing spaces
         b.   dimensions, crossfalls and gradients in accordance with Australian Standards
              AS/NZS2890.1:2004, AS/NZS2890.6:2009 and AS2890.2:2002.
   15.   The carparking area must be constructed with either a sealed surface or other bound
         material that is suitable for the intended use. Certification of the proposed surfacing
         from an RPEQ must be submitted as part of the operational works application.
   16.   All car parking areas and access driveways must be maintained exclusively for
         vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
   17.   Directional signage must be provided to direct visitors and guests to the car parking
         spaces provided on site.
         Traffic Management
   18.   A traffic management plan for both the regular operation of the development and any
         special events must be submitted as part of the Operational Works application. The
         traffic management plan must include but not be limited to:
         a.   day to day parking of the various vehicle types
         b.   parking for larger vehicles (buses, deliveries, waste collection etc)
         c.   overflow parking for special events
         d.   temporary traffic control measures on McKinnon Drive
         e.   endorsement by the Department of Transport and Main Roads.
         Stormwater Drainage
   19.   Stormwater runoff from the development must be disposed of on-site without causing
         scour or damage to the subject site or any adjoining property. The works must be
         undertaken in accordance with an Operational Works approval and must include in
         particular:
         a.   collection of runoff from the buildings and hardstand areas


                                                                                      Page 9 of 81

Section 10

GENERAL COMMITTEE MEETING AGENDA                                           12 DECEMBER 2016


         b.    collection of runoff from the carparking areas and access aisles
         c.    certification from an RPEQ that states the development of the site will not
               create a worsening for downstream properties in regard to stormwater quality or
               quantity.
         Earthworks and Retaining Walls
   20.   All fill and associated batters must be contained entirely within the subject site unless
         written permission from the respective landowner(s) is provided to Council.
         Damage to Services and Assets
   21.   Any damage caused to existing services and assets as a result of the development
         works must be repaired at no cost to the asset owner at the following times:
         a.    where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
         b.    where otherwise, upon completion of the works associated with the
               development.
         Any repair work which proposes to alter the alignment or level of existing services
         and assets must first be referred to the relevant service authority for approval.
         Noise
   22.   Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
         compressors, pumps etc on site should be situated within the building or suitably
         provided with noise reduction measures and located as to prevent a noise nuisance
         beyond the boundary of the site and not exceed the levels specified in Table 1.
          TABLE 1

                    NOISE LIMITS AT A SENSITIVE RECEPTOR

                             Noise level at noise sensitive place measured as the adjusted
              PERIOD
                             maximum sound pressure level (L10, adj,T)

              7am – 6pm          Background noise level (L90,T) plus 5 dB(A)

              6pm – 10pm         Background noise level plus 5 dB(A)

              10pm – 7am     Background noise level plus 3 dB(A)

                    NOISE LIMITS AT A COMMERCIAL PLACE

                             Noise level at a commercial place measured as the adjusted
              PERIOD
                             maximum sound pressure level (L10, adj,T)

              7am – 6pm          Background noise level (L90,T) plus 10 dB(A)

              6pm – 10pm         Background noise level plus10 dB(A)

              10pm – 7am         Background noise level plus 8 dB(A)




                                                                                   Page 10 of 81

Section 11

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


     23.   When requested by Council, a Noise Impact Assessment Report (NIAR) showing
           monitoring and recording of noise levels must be undertaken to investigate any
           complaint (other than a frivolous or vexatious complaint) caused by noise emissions
           from operations at the premises. Such monitoring must be undertaken within a
           reasonable and practicable timeframe nominated by Council and be performed by a
           suitably qualified person in accordance with accepted guidelines and standards. The
           report must be submitted to Council detailing the results of such monitoring and
           recommendations for any measures to achieve compliance with limits outlined in
           Table 1 of this Decision Notice.
           For the purpose of measuring and certifying relevant noise conditions and reporting
           (e.g. mechanical plant and equipment, a/c units, motors, refrigeration equipment,
           compressors, pumps, rooftop plant and equipment. etc) a suitably qualified person is
           either:
           i)    a Registered Professional Engineer of Queensland, or
           ii)   an environmental consultant with a minimum of three (3) years current
                 experience in the field of acoustics.
           Public Health Act 2005 - Rainwater Tanks
     24.   In accordance with the Public Health Act 2005, rainwater tanks must be constructed
           with mosquito proof screens (made from either brass, copper, aluminium or stainless
           steel), and constructed with a mesh size of no more than 1mm, and must be installed
           in a way that does not accelerate corrosion. Tanks that contain flap valves must be
           installed so that when closed, mosquitoes cannot pass through the valve. It is
           unlawful under the Public Health Act 2005 to construct, install or be in possession of
           a tank that does not comply with these requirements.
     25.   Where it is intended to use rainwater for drinking purposes, a suitable treatment
           system is required to be installed to disinfect or treat the water to microbiological and
           physical standards as described in the current Australian Drinking Water Guidelines
           2011 to make it fit for drinking purposes.
           Refuse
     26.   The developer must provide waste storage and disposal facilities in accordance with
           Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
           and Industrial Premises”, including an external imperviously paved area correctly
           sized for all refuse and recycling containers and suitably screened from public places
           and neighbouring properties.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:
     1.    ‘Our Backyard’ offers rural type uses which are compatible with and maintains the
           rural residential character of the area.
     2.    The proposal partially fills a gap in support services for people living with disabilities
           and their families while not adversely impacting on surrounding rural residential
           properties.
     3.    The proposal will generally add positively to Noosa’s social fabric providing a benefit
           to the community and is consistent with the intent of Noosa Social Strategy.
C.   Include the Department of Transport and Main Roads conditions as detailed in their
     Concurrence Agency response dated 7 November 2016.




                                                                                     Page 11 of 81

Section 12

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


REPORT
1.   PROPOSAL
The application seeks approval for the charitable organisation Sunshine Butterflies Incorporated
to establish ‘Our Backyard’, a hobby farm designed to improve lives of people with disabilities
and their families offering support, information and individual assistance. Our Backyard is
proposed to incorporate all Sunshine Butterflies activities in a rural setting which includes art,
drama, woodwork, horticulture, permaculture gardening, aquaculture, swimming and animal care.
The development proposes an administration office, respite house, sheds, therapy room and
general spaces and raised gardens for the various activities. Hours of operation are 9am to 4pm
with overnight respite consisting of 2 members/clients at a time. It is envisaged there would be 5 -
10 staff per day plus up to 20 clients per day. A free transport service is offered to clients from
town.
The development proposes 21 car spaces with access to the site being a dedicated entry and
separate exit point to maintain safety.
Events will include overnight camp outs up to 6 times per year and 3 major fundraising events
with up to 100 patrons attending each event. The implementation of parking would be managed
through a parking management plan which includes off site parking and shuttle bus drop off
arrangements.
On site sewage treatment is provided with temporary portaloos proposed for the occasional
special event.
The area of the site affected by the Biodiversity Overlay is proposed to be enhanced into a
koala/wildlife area.
The use has been operating in a limited capacity for approximately 1 year.
The application is before Council as the proposed use is inconsistent in the Rural Settlement
zone. Figure 1 is a master plan of the site.




Figure 1 – Site layout




                                                                                     Page 12 of 81

Section 13

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


2.   SITE DETAILS
2.1. Background
The site previously operated as a nursery.
2.2. Site Description
The 2.01ha rectangular shaped lot has approximately 178m of frontage to McKinnon Drive and a
slight slope from the south west to the north east corner of the site where 3 dams exist. There is
a scattering of vegetation around the boundaries with no significant stands of vegetation existing.
2.3. Surrounding Land Uses
The site is surrounded by typical small rural residential holdings. An access easement serving a
battle axe property adjoins the site’s western boundary. Across McKinnon Drive is Tewantin
National Park.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions;
   any Structure Plan or Master Plan in place for declared areas;
   any Preliminary Approval Overriding the Planning Scheme for the land;
   the Planning Scheme for the local government area; and
   any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policy
State Planning Policy mapping identifies the following applicable layers:
   Transport Noise Corridor – Noise Corridor
   Water Quality – Climatic regions, stormwater design objectives
   Natural hazards Risk and Resilience – Bushfire Hazard
The proposal complies with the provision for water quality and bushfire hazard. The application
was referred to Department of Transport and Main Roads (DTMR) as a Concurrence Agency
who have provided conditions requiring an upgrade of McKinnon Drive and raised no noise
concerns in regard to the development.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Rural Living Area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan and does not trigger assessment
as the proposed Community Activity proposes less than 5000m² of Gross Floor Area (GFA) and
less than 250m² of incidental commercial activity. Furthermore, the proposal promotes the
outcomes of Regional Policy 6 which seeks to ensure cohesive and inclusive communities that
provide a full range of services.




                                                                                    Page 13 of 81

Section 14

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
   SEQ Regional Plan Regulatory Provisions
The proposal is for a community activity within the Rural Living Area and is consistent with the
SEQ Regional Plan Regulatory Provisions.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroibah Locality and is zoned Rural Settlement. The
proposed use is identified as inconsistent within the zone and is required to follow an impact
assessable application process.
The proposed use is defined as Wellbeing Type 2 - Social. The applicant, Sunshine Butterflies
Inc., a community organisation is providing a use that plays an important role in Noosa’s social
fabric supporting those living with disabilities and their families. The ‘Our Backyard’ is a unique
vision which requires a rural setting in close proximity to town to ensure no locational
disadvantage for clients.
Cooroibah Locality Provisions
The most relevant Overall Outcomes for assessment of the proposed inconsistent use include:
5.7.2 The overall outcomes sought for the Cooroibah Locality are the following—
a)    New uses and works are located, designed and managed to—
      i    be compatible with other uses and works;
      ii maintain the safety of people and works;
      iii avoid significant adverse impacts on the amenity enjoyed by users of other premises,
           including impacts on acoustic and visual qualities; and
      iv avoid significant impacts to native habitat including fragmentation, attrition, or removal
           of vegetation or significant habitat features;…
f)    The dominant land uses are—
      i    rural settlement, at varying densities consistent with the environmental constraints of
           the area; and
      ii open space, comprising natural bushland settings in both public and private tenure;…
i)    Residential and rural settlement uses in the area are supported by a community focal point,
      with basic services to support the local community;…
m) Areas of native remnant or regrowth vegetation, including their biodiversity and habitat
      values are protected;…
v)    For the Rural Settlement Zone—detached housing on large lots—
      i    is the dominant building form, to the general exclusion of other uses;
      ii incorporates designs that respond to, and are integrated with site characteristics
           including steep slopes and native vegetation;
      iii offers a relaxed rural lifestyle for residents;
      iv contributes to the rural or semi-rural character and amenity of the area;
      v may be located in close proximity to working farms or other rural industries;
      vi offer convenient access to Tewantin via sealed roads;
      vii include associated home-based businesses on large lots such that neighbours are not
           impacted upon; and
      viii are dominated by native vegetation and landscaping;




                                                                                    Page 14 of 81

Section 15

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


While the proposal is defined as a Wellbeing use and inconsistent in the zone, many of the
services offered are of a rural nature typically seen in the rural residential areas and therefore the
Overall Outcomes offer some support for the use. The proposal is compatible with the
surrounding area being of rural/semi-rural character which is utilising large open spaces in a
bushland setting for the farm based activities. The development is proposing to rehabilitate the
land affected by the Biodiversity Overlay, which is currently degraded and a landscaped buffer is
proposed along all boundaries. Given the rural nature of the use, significant impacts are unlikely
to the surrounding properties, albeit some unobtrusive and minor noise impacts may occur
occasionally when special fundraising events are held.
Notwithstanding the above, the proposal is inconsistent with the intent for the site and the
applicant must therefore demonstrate a need for the proposal within the subject zone. Need for a
development is commonly recognised as relating to community wellbeing. A development may
be said to be needed if, on balance, it improves community wellbeing. Wellbeing may be
improved by access to new services or facilities or a range of other ways. In addition, new uses
must be compatible with surrounding uses in terms of amenity, the environment and economics.
Need
The Noosa Social Strategy identifies that many community service providers are located outside
the Shire and ‘as a result Noosa Shire residents often have to travel to access services. Some of
these service providers are actively exploring the possibility of creating one stop shops to co
locate multiple services across the Shire in order to better meet the needs of their clients,
enhance information flow and achieve efficiencies of scale and better use of resources’.
Charitable organisations are an integral part of the social fabric providing essential services that
are to some extent not provided by the government or business sectors. The Social Strategy
states:
‘Not-for-profit community organisations fill the gaps left by the government and business sectors,
often providing direct assistance to the most vulnerable in the community. Support from
corporate sponsors and the community, as well as government at all levels, is needed to sustain
a healthy not-for-profit sector.’
The following key issue is outlined in Noosa Social Strategy as challenging to the Noosa
community:
‘Support, respite and affordable independent living options: Teenagers and adults with an
intellectual or physical disability (and their carers) living in the Noosa Shire have particular needs
that are not always being met particularly in living, vocational and study skills.’
A ‘one stop’ hobby farm based respite and support service is currently not readily available for
individuals living with disabilities and their families in Noosa. The proposal is a unique service
that partially fulfils the need outlined above by the Noosa Social Plan. It is considered the
application has merit in that it fulfils a need and is improving the wellbeing of the individuals and
families it supports as well as the community’s wellbeing by adding positively to Noosa’s social
fabric.
Land Use & Works Provisions
The following Planning Scheme Codes are most applicable to this application:
     Community Uses Code
     Landscaping Code
     Engineering Works Codes
     Biodiversity Overlay
     Natural Hazards Overlay Code




                                                                                      Page 15 of 81

Section 16

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:
Access
McKinnon Drive is a State Controlled Road and concerns were raised by Council and DTMR in
regard to access to the site. DTMR have provided conditions requiring some upgrading works to
McKinnon Drive and restricted access to an entry only (western driveway) and exit only (eastern
driveway). This will ensure safety for people and property entering and exiting the site. Refer to
Attachment 2.
Carparking
It has been determined the proposed 21 formal car spaces is adequate for the proposed daily
operations. Concern is raised as to the carparking for special events as the applicant foresees
approximately 100 patrons attending the site. The applicant suggests that overflow parking for
special events can be managed through off site parking and shuttle buses. A condition is
recommended that a traffic and car parking management plan for special events to ensure there
is no impact on surrounding properties and to maintain safety.
Protected vegetation
The trees located in the lots eastern portion are protected by the Biodiversity Overlay. The
proposal seeks to enhance this area and provide a koala/natural habitat area. This meets the
intent of the Biodiversity Overlay Code while providing a vegetation buffer between the adjoining
rural residential use. A scattering of trees exist along the boundaries outside the Overlay. A
condition is recommended to retain this vegetation and provide some additional vegetation to
ensure a buffer to the adjoining neighbour.
Bushfire
The lot is separated by McKinnon Drive to Tewantin National Park, the highest bushfire risk area.
The adjoining lots are lightly vegetated and there is good separation between the existing and
proposed structures to ensure safety of people and property.
Effluent disposal
The applicant has provided an effluent disposal report that demonstrates the new effluent
disposal system is sufficient for the uses proposed on a daily bases. Portaloos are proposed for
special events to supplement the on site disposal system.


Assessment of Applicant’s Grounds for Approval
Applicant’s ground
The Sunshine Butterflies provide a valuable and needed service to the community and the
development of the facility on the subject site will clearly benefit the community by supporting and
improving the lives of individuals with a disability and their families.
Assessment
Agree. The Noosa Social Strategy outlines there is a need for this type of social infrastructure.
The assessment is whether the subject site is the best location for the use being located in a
rural residential area. This is addressed in this report.
Applicant’s ground
It is considered an over-riding need exists for the development in the public interest; and the
social, economic and environmental benefits in developing the site for this community use justify
approving the proposed development. The application has considerable merit and sufficient
planning grounds exist to approve the application despite the conflict with the Planning Scheme.



                                                                                     Page 16 of 81

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                     12 DECEMBER 2016


Assessment
The proposal has merit and a justified community need which aligns with the Noosa Social
Strategy. This report addresses whether there is sufficient community benefit to justify approval
despite the conflict.
Applicant’s ground
The site is ideally situated to provide a spacious, desirable and relaxed rural setting for clients, an
engineering access study has determined McKinnon Drive can safely accommodate the access
traffic generated by the use, minimum noise impact will occur from the development, and the on-
site infrastructure has been appropriately upgraded to accommodate the use, which is located in
close proximity to a significant town centre.
Assessment
Some of the proposed services provided by Sunshine Butterflies are typically rural in nature and
conducive to a rural residential setting. The administration component is a quiet use unlikely to
negatively impact on the surrounding area. The applicant has demonstrated that traffic generated
by the use can be addressed by some upgrade works to McKinnon Drive. It is agreed that
minimal noise would be generated by the use and the new effluent disposal system can
accommodate daily operation with the addition of portaloos for larger special events.
4.    CONSULTATION
IDAS Referral Agencies
The application was referred to Department of Transport and Roads as a concurrence agency.
Their assessment forms part of this report.
4.1. Other Referrals
The application was forwarded to the following internal Council specialists:
    Engineering Officer
    Environmental Health Officer
    Environment Officer
4.2. Public Notification
The application was publicly notified for 15 business days in accordance with the Sustainable
Planning Act 2009. Three (3) properly made submissions were received, 1 objection and 2 in
support. The following table provides a summary and assessment of the issues raised by
submitters.
 Issues                                                   Comments
 Supporting submissions
 ‘I believe that projects such as this will benefit both community and members of sunshine butterflies. This
 project will also profoundly inspire the community around’.
 ‘This letter is to support the proposed development at Sunshine Butterflies on McKinnon Drive, Cooroibah.
 We are the immediate neighbours living next’… door. ‘The combination of their work ethic and accumulated
 skills, their passion for making a positive influence in these kids lives, their management structure and solid
 foundational values, are the basis of why this organisation's proposed development project will have long
 standing ongoing prospects for years to come’.
 1 submission objecting to the proposal
 Noosa Council should reject the application for the      It is agreed the proposal is an inconsistent use in
 following reasons                                        the zone and conflicts with the planning scheme.
  The proposed development is an inconsistent use       The assessment as to whether there is an
                                                          overriding need is addressed in this report.
     in a rural settlement zone
  Conflicts with the Planning Scheme

                                                                                             Page 17 of 81

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                         12 DECEMBER 2016


Issues                                                         Comments
 Fails to justify an overriding need that outweighs
    the constraints of the site
The scale and intensity of the uses exceeds what is            The services offered are of a rural nature which are
appropriate for the site.                                      generally uses seen in rural residential areas. The
                                                               fundraising events will be managed to minimise
                                                               impacts on the surrounding area.
The proposal …raises questions over projected staff            Agree. A traffic and car parking management plan
numbers and given the facilities are open to the               is conditioned to be provided to Council to formalise
public it is likely that at peak times visitor vehicles will   off site parking and mini bus arrangements. The
out number proposed parking facilities. Questions are          applicant suggests larger events will occur up to 3
raised on the applicants projected traffic and parking         times per year.
volumes based on observation of numerous
fundraising and promotional events and activities
already undertaken on site.
Given the applicant’s failure to realistically predict the     DTMR are a concurrence agency to the application
clients, staff and day visitors, it is considered the          and have provided conditions for road upgrades to
traffic report and design for the entrance unreliable. It      ensure safe entry to and access from a state
is probable during busier times vehicles will attempt          controlled road.
to enter the property simultaneously, which is a
safety risk.
It is unclear whether live music will be included with         Agree. Conditions could be included to ensure
the larger events. Music in rural/rural residential            noise levels to not exceed acceptable levels should
areas raise planning conflicts.                                music be included at events.
We reject the applicant’s contention the ‘proposed             Disagree. The site is approximately 5 kilometres
development is for a respite centre for disabled               from Tewantin and considered in close proximity to
persons in a rural/rural settlement setting in close           Noosa centres.
proximity to the Noosa town centres.
The proposal will create service issues for water and          The site has adequate areas for delivery trucks and
portable toilet delivery truck.                                dedicated entry and exit points. Works conditioned
                                                               by DTMR will improve access.
‘It appears from the proposal the applicant intends to         Agree. The café/kitchen does not form part of this
develop the site in the future to include such facilities      application.
as a café. It is unclear from the proposal whether this
would be open to the public as well as clients. Such a
use is well beyond the scope of a "Wellbeing type 2’
It is of concern the applicant has proceeded with an           The use has been operating in a limited capacity for
inconsistent use of the site and now seeks                     approximately 1 year. The applicant seeks approval
retrospective approval. Council endorsement of such            for the existing and proposed use.
breaches of process creates a dangerous planning               The applicant’s planning report outlines the
precedent.                                                     intended use of the site.
The applicant's conduct in operating outside a lawful
approval raises questions over the credibility of
information provided in support of this application,
particularly in regards to projected visitor numbers
and frequency of proposed events.
…the applicant failed to comply with Public                    Disagree. It has been determined the applicant has
Notification obligations as set out in the Sustainable         undertaken Public Notification in accordance with
Planning Act 2009. The applicant only erected                  the SPA 2009.
signage on their property indicating the application
for a Material Change of Use on 24 or 25 November.
This was approximately one week prior to close of
submissions. This provided limited opportunity for the
community and neighbouring residents to provide a
properly made submission.


                                                                                                 Page 18 of 81

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                     12 DECEMBER 2016


5.      CONCLUSION
The proposed use is inconsistent in the Rural Settlement zone. However, the proposal offers
rural type uses typically found in the semi/rural areas, of which cannot be provided in an urban
area. There is a clear need for ‘Our Backyard’ proposal which partially fills a gap in supporting
people living with disabilities and their families; challenges which are outlined in Noosa’s Social
Strategy. Traffic and car parking raises some concerns. Road upgrades to the site’s frontage
would alleviate daily traffic concerns, and when a car parking and traffic management plan is
implemented, special events are unlikely to adversely affect the surrounding rural residential
uses. The proposal provides significant community benefit close to Tewantin with minimal
impacts on the surrounding rural residential area.
The following grounds are considered sufficient to overcome the conflict with the Planning
Scheme for the proposal:
1.      ‘Our Backyard’ offers rural type uses which are compatible with and maintains the rural
        residential character of the area.
2.      The proposal partially fills a gap in support services for people living with disabilities and
        their families while not adversely impacting on surrounding rural residential properties.
3.      The proposal will generally add positively to Noosa’s social fabric providing a benefit to the
        community and is consistent with the intent of Noosa Social Strategy


Departments/Sections Consulted:
     Chief Executive Officer                X   Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                                Waste & Environmental Health       Revenue Services

     Executive Office                       X   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                             x   Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                               Page 19 of 81

Section 20

Page 20 of 81

LEGEND
 ‘ Pent bey Cate FR Cheers Come Leer Corer OT Uv mtennrhiiteereaet Arte TO eet Vatiny Chee
 2 Geetwetetetee Oe = (Cheha Com Open Ae S Oy Cowie 7 Gere Cen             A
 2 fewvooe Carne wad = Omondery Deen “ Ow uh Yer Eno * Romina ib             ”
 S. Sresemuemes  ot laumumnamadine as cosets    i wearommmatnn iy                                                                  hi     b            .                                                       ~ ey
 2 ace           8 Sees ences Sinem ene                                   «                                        www.sunshinebutterflies.com.au                                            .      ae            ay
    ed           34 Corer Peting le Are $2 An eotmg Mae won 0 Gee Ane                                                                                                                       * PA          ie      “
   tee Tete      2 ere Peo Seraye 2 Cote        Shree Core Od Ae                                                                                                              Ls —~ ft =    4 a   /       *
 1 Pee           2 Compenttteya ating Mie OY Mts Pome Be iter Ligpatees                                                                                                 Sek                 ® fe    al a. f    - a
 12 Peet ae red Ore 2 Wet ties  5S Trmeemnny Peery 7 eee Cane On Ae                                                                                               oe ee             -   yi    pe     5	1	1	1	10	23	3008	488	80	20	17	Pes
4	1	1	1	11	0	144	500	2900	32	-1	
5	1	1	1	11	1	144	505	15	11	31	2
5	1	1	1	11	2	172	498	33	26	39	Pat
5	1	1	1	11	3	204	498	45	26	0	Soting
5	1	1	1	11	4	250	498	49	26	44	Benet
5	1	1	1	11	5	366	505	16	11	32	3
5	1	1	1	11	6	398	498	73	26	0	Myencone
5	1	1	1	11	7	470	498	29	26	58	tay
5	1	1	1	11	8	589	505	17	11	68	2
5	1	1	1	11	9	619	498	70	26	0	iteweGR
5	1	1	1	11	10	691	498	40	26	89	Shop
5	1	1	1	11	11	812	505	17	11	0	G8
5	1	1	1	11	12	847	505	168	13	25	Site
5	1	1	1	11	13	892	498	36	26	44	Gee
5	1	1	1	11	14	927	498	33	26	21	Yard
5	1	1	1	11	15	963	505	52	13	13	Signage
5	1	1	1	11	16	2308	522	7	4	4	a
5	1	1	1	11	17	2436	509	22	5	0	“o
5	1	1	1	11	18	2497	507	16	14	19	~~
5	1	1	1	11	19	2638	509	38	5	23	aie
5	1	1	1	11	20	2845	511	20	14	33	43
5	1	1	1	11	21	2934	513	25	9	10	ro
5	1	1	1	11	22	3019	500	25	32	43	oY
4	1	1	1	12	0	144	521	2849	24	-1	
5	1	1	1	12	1	144	522	15	11	39	14
5	1	1	1	12	2	173	514	44	27	24	Nene
5	1	1	1	12	3	216	514	50	27	34	Semen
5	1	1	1	12	4	266	514	52	27	36	Parting
5	1	1	1	12	5	367	522	16	11	19	3
5	1	1	1	12	6	400	521	155	15	5	PrengDersucher
5	1	1	1	12	7	521	514	36	28	49	Aree
5	1	1	1	12	8	561	514	19	28	45	=
5	1	1	1	12	9	589	522	17	11	40	G4
5	1	1	1	12	10	619	514	64	28	26	nemo
5	1	1	1	12	11	699	514	47	28	44	Actety
5	1	1	1	12	12	745	514	34	28	56	Ares
5	1	1	1	12	13	783	514	14	28	37	=
5	1	1	1	12	14	843	514	34	28	55	Gate
5	1	1	1	12	15	878	514	57	28	0	igre
5	1	1	1	12	16	1228	539	4	3	0	-
5	1	1	1	12	17	2260	525	15	20	31	Sy
5	1	1	1	12	18	2379	543	2	2	16	j
5	1	1	1	12	19	2517	524	2	5	0	°
5	1	1	1	12	20	2736	540	12	4	0	v
5	1	1	1	12	21	2815	524	39	21	45	al
5	1	1	1	12	22	2971	510	17	32	45	~~
4	1	1	1	13	0	143	525	2984	41	-1	
5	1	1	1	13	1	143	539	112	12	13	ee
5	1	1	1	13	2	265	526	108	36	35	ee
5	1	1	1	13	3	366	539	90	14	20	ee)
5	1	1	1	13	4	589	539	17	12	18	8
5	1	1	1	13	5	624	538	141	15	26	Bere
5	1	1	1	13	6	663	526	27	36	38	Kuo
5	1	1	1	13	7	690	538	66	15	0	tnt
5	1	1	1	13	8	771	526	15	36	0	§—
5	1	1	1	13	9	812	539	17	12	23	Bore
5	1	1	1	13	10	885	526	39	36	40	Latin
5	1	1	1	13	11	924	526	66	36	0	Baatnty
5	1	1	1	13	12	2137	550	81	8	34	aad
5	1	1	1	13	13	2355	525	61	41	0	ws
5	1	1	1	13	14	2754	545	4	6	0	F
5	1	1	1	13	15	3004	547	21	16	14	wae
4	1	1	1	14	0	144	545	2927	44	-1	
5	1	1	1	14	1	144	556	15	12	60	38
5	1	1	1	14	2	178	556	132	12	0	Cowerad
5	1	1	1	14	3	230	548	30	30	49	remus
5	1	1	1	14	4	280	548	23	30	26	Disa
5	1	1	1	14	5	365	556	16	11	56	43
5	1	1	1	14	6	400	556	91	13	0	Enrra
5	1	1	1	14	7	443	547	6	30	32	»
5	1	1	1	14	8	448	556	41	13	0	Sepae
5	1	1	1	14	9	589	556	16	12	18	$2
5	1	1	1	14	10	625	548	33	30	46	Kant
5	1	1	1	14	11	657	548	33	30	71	Toot
5	1	1	1	14	12	690	548	38	30	21	Great
5	1	1	1	14	13	812	556	16	12	35	21
5	1	1	1	14	14	847	548	46	30	48	Mistery
5	1	1	1	14	15	895	548	38	30	44	Grow
5	1	1	1	14	16	933	548	20	30	45	Om
5	1	1	1	14	17	958	548	30	30	47	Arne
5	1	1	1	14	18	1254	561	99	5	0	—_—-—
5	1	1	1	14	19	2079	550	63	29	0	—¥
5	1	1	1	14	20	2179	553	15	26	20	a
5	1	1	1	14	21	2272	546	44	43	54	ae
5	1	1	1	14	22	2351	568	8	6	34	=
5	1	1	1	14	23	2475	578	34	2	0	>
5	1	1	1	14	24	2675	545	26	30	13	ox.’
5	1	1	1	14	25	2781	561	38	20	15	re
5	1	1	1	14	26	2840	552	40	19	14	~~
5	1	1	1	14	27	2935	563	2	2	0	.
5	1	1	1	14	28	3025	545	39	39	6	ae
4	1	1	1	15	0	144	564	2812	49	-1	
5	1	1	1	15	1	144	573	14	11	53	17
5	1	1	1	15	2	170	563	34	33	55	Pow
5	1	1	1	15	3	203	563	34	33	25	Ane
5	1	1	1	15	4	366	573	16	13	62	<2
5	1	1	1	15	5	395	564	99	33	0	RanedVegze
5	1	1	1	15	6	494	564	61	33	22	Geers
5	1	1	1	15	7	554	564	17	33	22	=
5	1	1	1	15	8	617	564	48	33	38	Arnal
5	1	1	1	15	9	670	564	42	33	10	Chater
5	1	1	1	15	10	812	572	17	14	43	2
5	1	1	1	15	11	841	564	31	33	1	Hot
5	1	1	1	15	12	871	564	42	33	0	Houne
5	1	1	1	15	13	1889	587	12	10	0	”
5	1	1	1	15	14	1956	579	68	18	36	ng!
5	1	1	1	15	15	2176	584	73	14	25	a
5	1	1	1	15	16	2330	590	3	3	0	:
5	1	1	1	15	17	2412	597	4	1	0	:
5	1	1	1	15	18	2500	579	2	3	37	:
5	1	1	1	15	19	2556	583	3	3	0	;
5	1	1	1	15	20	2639	582	6	4	0	.
5	1	1	1	15	21	2711	575	8	10	0	-
5	1	1	1	15	22	2812	581	22	9	0	eae
5	1	1	1	15	23	2915	564	41	49	0	r)
4	1	1	1	16	0	144	586	2963	34	-1	
5	1	1	1	16	1	173	582	48	31	34	Gowen
5	1	1	1	16	2	220	582	63	31	0	Heages
5	1	1	1	16	3	366	590	16	12	36	2
5	1	1	1	16	4	395	583	73	31	45	Wrestchar
5	1	1	1	16	5	475	583	55	31	8	Garome
5	1	1	1	16	6	589	589	17	13	51	2
5	1	1	1	16	7	618	583	40	31	42	Oftce
5	1	1	1	16	8	657	583	53	31	45	Storage
5	1	1	1	16	9	812	589	17	13	37	8
5	1	1	1	16	10	847	590	53	12	33	Wem
5	1	1	1	16	11	1854	586	92	22	18	Sie
5	1	1	1	16	12	2044	598	12	12	22	‘
5	1	1	1	16	13	2103	590	128	25	32	Sg
5	1	1	1	16	14	2245	596	76	19	23	Cae
5	1	1	1	16	15	2391	601	13	4	59	a
5	1	1	1	16	16	2550	603	8	4	58	2
5	1	1	1	16	17	2793	589	74	27	39	tag.»
5	1	1	1	16	18	2960	609	2	5	0	;
5	1	1	1	16	19	3071	591	36	29	44	as
4	1	1	1	17	0	144	600	2849	36	-1	
5	1	1	1	17	1	144	608	15	12	29	39
5	1	1	1	17	2	172	597	36	30	72	Lawn
5	1	1	1	17	3	212	597	38	30	65	Prone
5	1	1	1	17	4	250	597	33	30	41	Arom
5	1	1	1	17	5	365	608	18	11	33	06
5	1	1	1	17	6	396	597	75	30	0	Comments
5	1	1	1	17	7	471	597	53	30	28	Garten
5	1	1	1	17	8	589	607	17	13	43	©
5	1	1	1	17	9	617	597	53	30	20	Fareed
5	1	1	1	17	10	670	597	48	30	11	Arent
5	1	1	1	17	11	717	597	43	30	28	Yars
5	1	1	1	17	12	812	607	17	13	19	6
5	1	1	1	17	13	847	608	66	12	28	Sere
5	1	1	1	17	14	1705	613	64	17	31	ao
5	1	1	1	17	15	1847	611	22	8	71	—
5	1	1	1	17	16	1914	618	70	15	19	Fey
5	1	1	1	17	17	2051	611	6	8	15	4
5	1	1	1	17	18	2133	622	5	5	65	»
5	1	1	1	17	19	2356	610	23	12	0	-
5	1	1	1	17	20	2797	614	2	4	4	i
5	1	1	1	17	21	2860	617	10	14	93	4
5	1	1	1	17	22	2890	600	20	36	18	2
5	1	1	1	17	23	2991	622	2	3	69	i
4	1	1	1	18	0	143	624	2925	19	-1	
5	1	1	1	18	1	143	624	16	12	35	28
5	1	1	1	18	2	178	618	41	28	6	Teen
5	1	1	1	18	3	218	618	43	28	36	Leer
5	1	1	1	18	4	260	618	43	28	23	Teer
5	1	1	1	18	5	400	625	68	13	0	Beanie
5	1	1	1	18	6	590	625	16	11	45	72
5	1	1	1	18	7	616	619	45	28	41	Anim
5	1	1	1	18	8	670	625	103	11	0	Pamtn
5	1	1	1	18	9	733	619	35	28	38	Geom
5	1	1	1	18	10	779	619	15	28	30	=
5	1	1	1	18	11	812	624	18	12	30	OB
5	1	1	1	18	12	842	619	34	28	30	Penn
5	1	1	1	18	13	880	619	21	28	20	Pine
5	1	1	1	18	14	1613	633	10	4	44	=
5	1	1	1	18	15	1917	633	2	2	32	a
5	1	1	1	18	16	2022	630	74	12	0	_s
5	1	1	1	18	17	2142	632	1	3	0	‘
5	1	1	1	18	18	2900	632	37	10	27	i
5	1	1	1	18	19	3046	627	22	16	19	a.
4	1	1	1	19	0	142	612	2944	81	-1	
5	1	1	1	19	1	142	642	16	11	65	7)
5	1	1	1	19	2	173	635	40	28	29	Laer
5	1	1	1	19	3	212	635	39	28	27	Oe
5	1	1	1	19	4	252	635	40	28	0	kunm
5	1	1	1	19	5	292	635	40	28	57	Aree
5	1	1	1	19	6	331	635	29	28	41	=
5	1	1	1	19	7	365	641	17	12	49	4
5	1	1	1	19	8	397	635	38	28	11	Once
5	1	1	1	19	9	436	635	64	28	0	Rtontiane
5	1	1	1	19	10	502	635	47	28	0	Patan
5	1	1	1	19	11	590	641	15	11	35	Tt
5	1	1	1	19	12	618	635	38	28	28	Orem
5	1	1	1	19	13	656	635	52	28	24	Tress
5	1	1	1	19	14	712	635	35	28	30	fame
5	1	1	1	19	15	812	641	18	12	45	86
5	1	1	1	19	16	843	634	75	28	0	Hoseutes
5	1	1	1	19	17	917	634	52	28	20	Treg
5	1	1	1	19	18	971	634	40	28	54	Shee
5	1	1	1	19	19	1491	656	10	10	8	ot
5	1	1	1	19	20	1579	648	72	17	45	a
5	1	1	1	19	21	1801	633	36	36	24	waa
5	1	1	1	19	22	1881	649	11	9	44	ch
5	1	1	1	19	23	1967	650	8	10	56	“
5	1	1	1	19	24	2291	645	20	24	14	ey
5	1	1	1	19	25	2390	612	41	81	17	eB
5	1	1	1	19	26	2840	645	4	2	24	-
5	1	1	1	19	27	2907	660	6	6	75	x
5	1	1	1	19	28	3025	639	37	22	11	Pr
4	1	1	1	20	0	142	653	2882	31	-1	
5	1	1	1	20	1	142	658	17	13	29	2
5	1	1	1	20	2	170	654	40	24	33	leer
5	1	1	1	20	3	214	654	52	24	0	Fucton
5	1	1	1	20	4	268	654	33	24	41	Ae
5	1	1	1	20	5	366	658	16	13	70	@
5	1	1	1	20	6	390	654	108	24	0	Deotinsites
5	1	1	1	20	7	504	654	58	24	1	Sweeny
5	1	1	1	20	8	589	658	16	12	48	(72)
5	1	1	1	20	9	620	654	32	24	10	Kee
5	1	1	1	20	10	662	654	52	24	0	Gonew
5	1	1	1	20	11	812	658	17	12	52	ST
5	1	1	1	20	12	842	654	58	24	0	Cereed
5	1	1	1	20	13	900	654	54	24	0	teeten
5	1	1	1	20	14	954	654	32	24	52	ant
5	1	1	1	20	15	1487	667	2	3	25	 £
5	1	1	1	20	16	1525	653	53	31	6	foe
5	1	1	1	20	17	1646	668	38	6	0	r-
5	1	1	1	20	18	1950	664	5	4	33	ye
5	1	1	1	20	19	2183	676	1	3	0	j
5	1	1	1	20	20	2262	666	4	3	0	P
5	1	1	1	20	21	2833	675	2	3	0	:
5	1	1	1	20	22	2885	653	18	24	0	re
5	1	1	1	20	23	2930	668	8	13	48	>
5	1	1	1	20	24	3016	673	8	7	49	le
4	1	1	1	21	0	143	665	2929	41	-1	
5	1	1	1	21	1	143	676	16	12	10	2
5	1	1	1	21	2	178	676	67	11	0	Gaiteeee
5	1	1	1	21	3	366	676	16	11	0	SS
5	1	1	1	21	4	400	676	158	14	0	Metiatiayetetines
5	1	1	1	21	5	590	676	15	11	31	73
5	1	1	1	21	6	617	664	53	30	37	linker
5	1	1	1	21	7	672	664	33	30	13	Beam
5	1	1	1	21	8	840	665	33	30	40	Pied
5	1	1	1	21	9	875	665	16	30	33	nat
5	1	1	1	21	10	898	675	83	15	0	bemeng
5	1	1	1	21	11	945	665	26	30	38	rome
5	1	1	1	21	12	1350	676	137	23	0	(genet
5	1	1	1	21	13	1847	699	9	2	0	F
5	1	1	1	21	14	1941	681	15	14	61

                                                                                                                                          ——          s           me    '                  ny    a     ae me
 = tet ieee      @ Cutter Fem Oven TS Netw Arent ome 2 Cortrenee com               ee                                —      i      =                    ~ -
 29 athe Coenen  {98 Ctits Drvatrtnt ethrromes 7 Amntoms tum Siprteery 3 te    wees  icy a    7  er   1           Poa                          f   Jam”     :    je                        ge Pan     Mer
                                                     Ne                    OD      ee    ee es                                                     iS                                       ae        Fed
                   eS     »       -     r          =         es    \ 7  recht       '    \       ,                                           x            D. ;    rome    a      F             6  ="   if
                 Wma                       FN             oa         Te                                                                                                Se              fae      bad
                 fu        = ane       ec         “3    ve \   2 siaik| { waite S      )       M 4          |                             ms             2 .        gt              e 4     ~~     li
                      Pe      ree ew               2) \agR Qe                                ‘lds          fl                 er]                                  ow,    oe         ae       ee
                     y eHe\    corte ares’                  :   .    —          .           2     -     ~                                                      \a                     :     Roe |
                   iS apo                                @e D           Rees                           ae                                                        |  9 eye
4	1	1	1	31	0	441	994	2485	91	-1	
5	1	1	1	31	1	441	1014	109	49	5	ae
5	1	1	1	31	2	585	1008	66	53	28	at
5	1	1	1	31	3	711	1040	12	18	0	.
5	1	1	1	31	4	877	1015	46	45	45	ool
5	1	1	1	31	5	931	1023	20	27	25	A
5	1	1	1	31	6	1619	1028	6	2	0	;
5	1	1	1	31	7	1968	994	85	91	8	&
5	1	1	1	31	8	2420	1048	6	11	0	:
5	1	1	1	31	9	2589	1024	12	33	78	\
5	1	1	1	31	10	2668	1042	4	4	26	§
5	1	1	1	31	11	2715	1012	45	60	19	uaa
5	1	1	1	31	12	2770	1018	68	50	0	e
5	1	1	1	31	13	2891	1009	35	49	13	y
4	1	1	1	32	0	436	1052	2461	31	-1	
5	1	1	1	32	1	436	1060	19	11	57	>
5	1	1	1	32	2	503	1055	55	14	41	a
5	1	1	1	32	3	580	1052	79	26	6	et
5	1	1	1	32	4	687	1059	6	4	28	a
5	1	1	1	32	5	839	1059	62	24	22	ae
5	1	1	1	32	6	1014	1075	3	2	0	~
5	1	1	1	32	7	2348	1071	2	2	0	¥
5	1	1	1	32	8	2412	1073	3	3	45	.
5	1	1	1	32	9	2675	1062	30	13	0	Neca
5	1	1	1	32	10	2743	1072	3	10	66	/
5	1	1	1	32	11	2804	1059	13	19	30	Pea
5	1	1	1	32	12	2894	1077	3	3	2	-
4	1	1	1	33	0	420	1049	2480	81	-1	
5	1	1	1	33	1	420	1051	82	56	44	ao
5	1	1	1	33	2	775	1065	167	44	32	425)
5	1	1	1	33	3	1093	1074	17	13	0	-
5	1	1	1	33	4	1346	1097	16	10	8	.
5	1	1	1	33	5	1689	1098	82	8	28	—
5	1	1	1	33	6	2133	1068	241	50	77	Vee
5	1	1	1	33	7	2398	1049	215	81	44	0@)\
5	1	1	1	33	8	2735	1076	165	32	23	eG
4	1	1	1	34	0	504	1095	2475	91	-1	
5	1	1	1	34	1	468	1107	69	33	21	pe
5	1	1	1	34	2	663	1108	19	13	42	a
5	1	1	1	34	3	776	1108	114	43	46	“Shen
5	1	1	1	34	4	942	1117	20	28	41	©
5	1	1	1	34	5	1043	1127	3	5	41	;
5	1	1	1	34	6	1185	1113	21	14	0	“
5	1	1	1	34	7	1306	1110	2	2	31	:
5	1	1	1	34	8	1553	1106	66	29	42	SL,
5	1	1	1	34	9	1676	1110	44	34	0	Se
5	1	1	1	34	10	1736	1110	43	29	51	a
5	1	1	1	34	11	2007	1111	23	9	58	~
5	1	1	1	34	12	2156	1114	80	24	33	a
5	1	1	1	34	13	2269	1125	18	8	20	,
5	1	1	1	34	14	2326	1114	77	72	64	@
5	1	1	1	34	15	2541	1095	72	79	6	+
5	1	1	1	34	16	2645	1113	45	20	19	Sy
5	1	1	1	34	17	2822	1096	54	80	24	Ny
5	1	1	1	34	18	2976	1113	3	3	25	A
4	1	1	1	35	0	439	1127	2561	81	-1	
5	1	1	1	35	1	439	1148	20	17	92	¥
5	1	1	1	35	2	529	1172	7	14	63	4
5	1	1	1	35	3	665	1139	26	50	7	i?
5	1	1	1	35	4	782	1153	31	26	58	1
5	1	1	1	35	5	838	1152	75	33	33	are
5	1	1	1	35	6	1043	1159	32	31	9	me
5	1	1	1	35	7	1183	1165	49	19	17	=
5	1	1	1	35	8	1245	1143	23	15	57	2
5	1	1	1	35	9	1425	1185	4	3	31	i
5	1	1	1	35	10	1560	1165	19	15	0	o
5	1	1	1	35	11	1626	1128	10	46	77	|
5	1	1	1	35	12	1681	1154	44	44	75	S
5	1	1	1	35	13	1738	1148	41	53	61	ay
5	1	1	1	35	14	1868	1158	17	13	12	a
5	1	1	1	35	15	2100	1132	64	76	8	~
5	1	1	1	35	16	2217	1127	58	57	0	~
5	1	1	1	35	17	2557	1172	5	7	8	/
5	1	1	1	35	18	2654	1161	17	11	10	i
5	1	1	1	35	19	2699	1150	64	40	22	f=
5	1	1	1	35	20	2839	1167	17	7	9	7
5	1	1	1	35	21	2998	1157	2	2	49	i
4	1	1	1	36	0	446	1179	2244	52	-1	
5	1	1	1	36	1	446	1191	27	5	59	as
5	1	1	1	36	2	691	1189	33	21	14	Pee
5	1	1	1	36	3	768	1182	53	24	0	[8
5	1	1	1	36	4	837	1183	44	27	0	(ae
5	1	1	1	36	5	976	1183	4	11	0	j
5	1	1	1	36	6	1058	1184	15	18	47	=
5	1	1	1	36	7	1152	1175	20	38	33	en
5	1	1	1	36	8	1247	1179	25	18	26	eo
5	1	1	1	36	9	1472	1193	15	9	11	co
5	1	1	1	36	10	1595	1180	42	51	49	a
5	1	1	1	36	11	2550	1187	3	3	0	/
5	1	1	1	36	12	2586	1189	104	21	25	Lae
4	1	1	1	37	0	526	1194	2273	39	-1	
5	1	1	1	37	1	526	1207	3	2	2	¢
5	1	1	1	37	2	674	1194	41	32	22	Fo
5	1	1	1	37	3	785	1209	23	9	32	a
5	1	1	1	37	4	826	1201	73	19	23	nT
5	1	1	1	37	5	1072	1194	34	32	32	wy?
5	1	1	1	37	6	1567	1194	17	32	1	_—
5	1	1	1	37	7	1661	1194	16	32	26	se
5	1	1	1	37	8	2363	1212	27	3	24	—
5	1	1	1	37	9	2610	1202	13	16	30	Me
5	1	1	1	37	10	2704	1197	32	36	56	&
5	1	1	1	37	11	2790	1212	9	7	27	e
4	1	1	1	38	0	460	1196	2781	73	-1	
5	1	1	1	38	1	460	1237	11	11	0

                                         Ay)                RAs cee       fae                       She      wo @              Pee         oO           ee                  igs EP ep
                        po             EO            ae ag                                     FAG                            Saami! at
                        e-.         |  See                 WE         a                       »   tow                                                                  tae                              :
                         a‘                              ‘          Saag   - a g             4   m (oy   oe       we                                                    a          s                      Wnhosres ts Coe Rave Yard
                             _*                                eS                              “N     =~ %        ~                                                      _       t <fa                    See
                            s                          “A     a            gua G                             ad ‘gp                       =                          nage 1s       ao           Cur Serine ie 2 8 sew ‘mate Fare 1 Comet ot ot
                         x          4                =X —_     *.   its   «            ‘.       =  ars    cy     ros                                                 ax 4% iil ie Re                os Lee
                           ey  b                    li   {eatery    _ 7 Heat                   bs    fon ‘age Cob ae                                                       eon       e          Cte Bamnyare & Pee pow terme of gf Somewne Hometien onketen ey.
                                                     yi                                       ‘’    Re        eS                                                  —.       Aad   fa)             ine: ere at cna & went aarp erty ey
                            eS                    viene         OM)         wg                SB ww                                                              yet”               ©          Se See eaten ee, eoeatae
                             \                  eo           Sigel                                   Oooo                                                        eG                              BRE GR ERTS
                              Lat?         ebphelgtes Sa                         *.    *.    gue @                                                          \  pall ee                           ieee ee eee eerie
                                        8 OSS. A                           @\)l) |e)          See         ae ae                                                  NE                               evereeee Basho ree een ence eee
                                   ;      £  3 hen tee     iP Lae          =|   as       .    Rule ead sted                      TT          a             ».     7 a        “$a,               These 99 We ater ein copy oa 8 Hy som say
                                    —_- >      eo)          gg        A Fae EN      ESB. GR                 Fe eg    iT ORLY         0h    aes ae        et       :    a                        Petite tan   yA ne mr
                                         b.   B       a    an a. -                                   e          4  Py  Does          iT             eee    as   ‘   et        ‘                  ot   1 Cm temtttend comet oF at 8 Pw
                                ve    op  ae          ie      wh      “          ag   ae   6     Le            ee                et py ane                 Ca Lae ne                             Tepnndemes ence tees ween Ba teorine sata
                                                                                                                                                                                                 Se
                                                                                                                                                                                                 avers ne gear) ons on eg pce
  __————                        rn                                                 7a                 Poet                         Pp    North      ome ow       fom   ow
 H                                   TJ orn:                                     ~e                                                                                                 Landscape Concept Plan
  {_                                                                                                                                                == =
ry                                     == =                                                                     oe                                                                            Our Back Yard
 aaa ieee wetartall                                                                                                                                   agg                                    468 Mckinnon Drv Cooroibah
    caer                            a a                                            Wash 0488                Sree toerte                                                       ee
                                   Tr foe fol om |                            Damion Waish : 0488 558893                                             me 12000 |                     rmning to            Loo2

                                                                                                                                                                                                        Page 20 of 81

Section 21

Page 21 of 81

1840 Lz ebeq
                                                      oa              are                          a                                                     a oe
                                                                                                                                                         | UMC)   UORCLOSO9 USAC SEQ NOY]  4
               SSS                                                    =.                                                                         te ee
      an |      ee                                 Pe              aon MY         uZi08 STWONASE S] ageuew paloid g Si0BUIUD                    ONY AveREnIN ——————                pot
           bis 0zsoL
5	1	1	1	6	3	1153	359	116	43	84	ONNDIOW
5	1	1	1	6	4	1275	359	44	43	0	e9P
5	1	1	1	6	5	1321	359	23	43	91	-
5	1	1	1	6	6	1343	359	64	43	0	GNA
5	1	1	1	6	7	2598	375	280	50	0	/_—t+—+———*+ cae nana
           Meemeree| LNOAV (VE) ANSALVEUL HVBIOYOOD BAD NONNDII 89" GVA! at                       wao j                     a a                          ——
       tv NMOHS SV) 3NV1NUNL LHOTY SISva      MOVE UNO ‘sarsusaLLN        ins =e                                                  a        es                ae           ale =) 7          =
       Pes      23                   va tone                      —     ¥            ;                     “oF         te  a ems                    ay ca   ge iY     ye    A           ek
                 a2  cme                   on |     i ss        .  f a | »~ ay                  mn       si  a              :   af pre                     a A               a?     See
             —                         tr. bs    ‘      s     * y     -?    vet      : os +         . h      thee   oo     bs  ™ i a         =4      .  PY  .               Pen       A    -
            se        7    °           eal  P    v1 vans    od Cd           7%      ig      .   ‘ . :    _   hb     a        Ag                =  ha     *    x     :        le          yo
                                      280      ans  he              Han           -          le  ‘ on? >     ae —-             =       .       ded    »         :                  ou”
                            7220    tae         I      gO      an                 |       é      Te        Be nrc ae      Tae    Ss            te         at   Pn,              Pat Fr
       NOSNELGININAAVAOISOdHd =|     j   &      i       aces Fe, '                            A       Rent en     a Aart       eS       pay .       ;    pot  as                  - aalke
              Nawnws 40300300       f              £0            ai    wae              a   a  Oe a    :      wd
5	1	1	1	16	13	2025	661	84	57	16	Pane,
5	1	1	1	16	14	2136	683	159	35	22	nae
5	1	1	1	16	15	2376	689	41	25	0	y
5	1	1	1	16	16	2443	691	74	25	25	See
5	1	1	1	16	17	2560	696	7	15	14	a
5	1	1	1	16	18	2906	719	2	2	43	hn
5	1	1	1	16	19	2953	673	40	52	31	ie
5	1	1	1	16	20	3103	675	30	60	43	we
4	1	1	1	17	0	568	671	2579	75	-1	
5	1	1	1	17	1	568	671	114	50	0	anaon
5	1	1	1	17	2	791	677	108	25	0	eH
5	1	1	1	17	3	1041	690	101	25	30	A
5	1	1	1	17	4	1167	693	2	3	26	OE
5	1	1	1	17	5	1259	686	44	15	38	ee
5	1	1	1	17	6	1290	673	39	57	29	a
5	1	1	1	17	7	1504	709	24	12	41	a
5	1	1	1	17	8	1549	699	107	32	15	eS
5	1	1	1	17	9	1810	719	84	12	0	Me
5	1	1	1	17	10	2075	709	366	37	27	ye
5	1	1	1	17	11	2469	715	12	24	32	ae
5	1	1	1	17	12	2545	712	18	29	8	a
5	1	1	1	17	13	2598	722	69	19	30	ee
5	1	1	1	17	14	2684	719	83	18	11	ee
5	1	1	1	17	15	3074	726	11	13	12	vat
5	1	1	1	17	16	3142	732	5	12	39	|
4	1	1	1	18	0	389	743	2740	77	-1	
5	1	1	1	18	1	389	753	5	5	91	4
5	1	1	1	18	2	471	747	29	21	9	a
5	1	1	1	18	3	559	743	6	9	0	-
5	1	1	1	18	4	640	751	13	8	66	~
5	1	1	1	18	5	688	751	11	16	80	“
5	1	1	1	18	6	757	766	21	10	38	ae
5	1	1	1	18	7	823	755	12	17	38	y
5	1	1	1	18	8	854	748	7	26	32	7
5	1	1	1	18	9	966	774	7	6	0	:
5	1	1	1	18	10	1038	757	8	8	0	S
5	1	1	1	18	11	1088	750	7	9	44	7
5	1	1	1	18	12	1139	753	6	8	0	-
5	1	1	1	18	13	1299	755	56	16	13	a
5	1	1	1	18	14	1390	769	17	18	49	mt
5	1	1	1	18	15	1448	769	2	5	0	:
5	1	1	1	18	16	1486	785	5	3	0	’
5	1	1	1	18	17	1539	774	7	6	0	*
5	1	1	1	18	18	1561	763	32	24	62	on
5	1	1	1	18	19	1606	767	43	13	0	—
              ee    ile    oo         i ee               _            eS     ae          ee i ae        <a     <.     we           ett       ae      4 i   Oe ee                       hy.
                                                                                              -               >        .  ae         |       =     ie:  A s   em      ep &            eae
              -   oo Ae a    aoe        he       is         a. |    +     cys na       : oe,    aoe -  A a           rs -     7          7  <.  : _    3  “  -    Dn  7 rs  Ne       -    is
           _      .   ok                Fy     .               ¢      ,   £     aay       7            »      ~~;         5	1	1	1	21	14	2259	854	30	39	30	re
5	1	1	1	21	15	2532	877	16	5	41	we
5	1	1	1	21	16	2639	881	5	5	0	,
5	1	1	1	21	17	2723	879	76	22	0	Seed
4	1	1	1	22	0	338	837	2674	105	-1	
5	1	1	1	22	1	338	851	5	6	31	7
5	1	1	1	22	2	403	866	54	12	25	=
5	1	1	1	22	3	530	838	20	40	31	a
5	1	1	1	22	4	647	868	8	6	32	he
5	1	1	1	22	5	750	877	10	8	18	OSS
5	1	1	1	22	6	846	863	51	28	31	el:
5	1	1	1	22	7	941	857	54	50	44	ha
5	1	1	1	22	8	1014	873	52	18	45	a
5	1	1	1	22	9	1158	837	93	70	18	bs
5	1	1	1	22	10	1286	875	75	24	52	a.
5	1	1	1	22	11	1508	859	18	21	30	-
5	1	1	1	22	12	1582	876	72	36	34	Mad
5	1	1	1	22	13	1657	876	123	36	89	TWNOLLWN
5	1	1	1	22	14	1790	876	125	36	33	NILNWMAL
5	1	1	1	22	15	1918	876	18	36	37	|
5	1	1	1	22	16	2094	904	12	6	7	bs
5	1	1	1	22	17	2334	900	1	3	0	/
5	1	1	1	22	18	2447	893	69	27	20	ae
5	1	1	1	22	19	2606	894	20	29	18	i.
5	1	1	1	22	20	2686	909	42	18	17	ee
5	1	1	1	22	21	2899	890	26	52	21	mM
5	1	1	1	22	22	2990	898	18	36	0	.,
4	1	1	1	23	0	472	887	2670	69	-1	
5	1	1	1	23	1	472	887	5	7	0	-
5	1	1	1	23	2	539	889	27	16	38	iJ
5	1	1	1	23	3	708	894	3	1	0	:
5	1	1	1	23	4	858	890	81	26	20	in
5	1	1	1	23	5	927	880	37	40	10	Xe
5	1	1	1	23	6	1042	893	11	8	0	°
5	1	1	1	23	7	1263	896	15	10	0	eo
5	1	1	1	23	8	1373	906	9	18	0	-
5	1	1	1	23	9	1465	911	10	16	0	,
5	1	1	1	23	10	1724	928	30	6	24	ns
5	1	1	1	23	11	1877	917	34	15	56	7
5	1	1	1	23	12	2065	918	6	18	0	j
5	1	1	1	23	13	2338	911	8	35	0	cs
5	1	1	1	23	14	2440	924	44	12	13	a.
5	1	1	1	23	15	2500	925	36	22	40	See
5	1	1	1	23	16	2635	934	8	5	0	‘
5	1	1	1	23	17	2701	931	167	23	17	Fa
5	1	1	1	23	18	3014	951	18	5	41	m
5	1	1	1	23	19	3090	936	6	6	33	>
5	1	1	1	23	20	3129	937	13	9	0	*
4	1	1	1	24	0	518	892	2342	92	-1	
5	1	1	1	24	1	518	931	3	3	53	ti
5	1	1	1	24	2	580	892	17	36	50	au
5	1	1	1	24	3	655	918	14	4	0	~
5	1	1	1	24	4	820	922	45	16	42	that
5	1	1	1	24	5	900	931	3	3	78	4
5	1	1	1	24	6	948	938	4	3	0	;
5	1	1	1	24	7	1017	935	2	3	18	’
5	1	1	1	24	8	1336	927	10	18	18	j
5	1	1	1	24	9	1370	919	35	18	0	Ls
5	1	1	1	24	10	1461	938	46	19	24	CaN
5	1	1	1	24	11	1658	940	10	12	0	-
5	1	1	1	24	12	1738	917	15	33	0	Pr,
5	1	1	1	24	13	1819	956	12	6	20	2
5	1	1	1	24	14	1851	922	25	35	25	ay
5	1	1	1	24	15	1909	947	35	17	12	ie
5	1	1	1	24	16	1978	921	21	40	22	ra
5	1	1	1	24	17	2096	923	36	34	44	Pe’
5	1	1	1	24	18	2211	956	22	13	8	5
5	1	1	1	24	19	2356	961	3	2	0	,
5	1	1	1	24	20	2434	947	11	26	86	4
5	1	1	1	24	21	2497	948	40	23	35	i
5	1	1	1	24	22	2569	957	20	18	0	-
5	1	1	1	24	23	2702	955	2	2	43	.
5	1	1	1	24	24	2770	976	10	8	0	»
5	1	1	1	24	25	2803	932	18	28	0	.S
5	1	1	1	24	26	2852	963	8	4	0	D
4	1	1	1	25	0	447	940	2353	66	-1	
5	1	1	1	25	1	500	954	8	12	16	a
5	1	1	1	25	2	864	955	20	16	8	a:
5	1	1	1	25	3	941	940	16	14	33	a
5	1	1	1	25	4	1046	941	9	36	23	il
5	1	1	1	25	5	1265	952	27	27	3	2
5	1	1	1	25	6	1293	948	28	35	35	oe
5	1	1	1	25	7	1464	967	40	17	21	Pn
5	1	1	1	25	8	1691	956	6	13	0	:
5	1	1	1	25	9	1836	978	52	11	13	a?
5	1	1	1	25	10	1911	969	8	9	1	hi
5	1	1	1	25	11	2075	994	3	1	0	-
5	1	1	1	25	12	2134	992	4	6	4	,
5	1	1	1	25	13	2151	970	44	29	37	eer:
5	1	1	1	25	14	2507	983	3	5	32	i
5	1	1	1	25	15	2768	1003	32	3	0	;«
4	1	1	1	26	0	523	966	2597	85	-1	
5	1	1	1	26	1	470	957	49	41	4	<i.
5	1	1	1	26	2	670	970	7	5	51	f
5	1	1	1	26	3	769	966	3	5	24	ae
5	1	1	1	26	4	915	978	6	5	0	/
5	1	1	1	26	5	996	970	99	20	31	dal.
5	1	1	1	26	6	1140	992	9	11	39	aX
                                                                                -     es      at et Ae ae               ee             s      a,    ee               -      ae          aT
                          -        Vpey            ee Sah       in      SF     ee                 aad a       ek            me                           ne         Re                     ]
               eS       ee                           -     b              P     Ohae                    Ae     ee           ey           eee ae         <<               Y                “
        e <                 yi  ¥     oe  ars     > ye          i             af . -                   , ‘ Cg               : 7%     4     3    7 es             Sl        ea    -
        ;       :           ae!  ofa                            >    ~   -    ~                                 ime  ,      /   ;     ee              .     ,   “      7   sy  ®      -*
                     m                          »    -   .  P    a    :      >             -                     ~    ¥      ;   ———       a            rv»         2         3NIvi34 3601 | .
        gr               ;      o                        as      *       ae        .                  a    ~~        ‘ee          ae      ey,   J               ra       AAWCQOONNAATISOIN © |
      ee                        “  tats    be     .       =              A         I
5	1	1	1	34	9	1600	1219	11	8	0	—
5	1	1	1	34	10	1690	1217	16	6	17	ea
5	1	1	1	34	11	1959	1224	2	3	48	:
5	1	1	1	34	12	2049	1219	10	13	0	-
5	1	1	1	34	13	2114	1230	4	2	25	mins
5	1	1	1	34	14	2155	1230	6	6	0	*
5	1	1	1	34	15	2226	1230	84	15	18	anol
5	1	1	1	34	16	2510	1215	39	37	2	Pe)
5	1	1	1	34	17	2618	1238	3	4	8	f
5	1	1	1	34	18	2748	1234	25	18	13	cae
5	1	1	1	34	19	2921	1244	37	12	14	iy
5	1	1	1	34	20	3064	1223	82	47	32	ae
4	1	1	1	35	0	328	1202	2800	76	-1	
5	1	1	1	35	1	328	1202	4	6	0	;
5	1	1	1	35	2	500	1211	23	6	22	mn
5	1	1	1	35	3	653	1197	8	28	0	/~
5	1	1	1	35	4	669	1197	10	28	11	>
5	1	1	1	35	5	830	1204	54	17	1	a
5	1	1	1	35	6	1039	1221	9	4	0	_*
5	1	1	1	35	7	1118	1224	4	3	14	m
5	1	1	1	35	8	1366	1230	9	6	0	oo
5	1	1	1	35	9	1498	1234	1	3	0	-
5	1	1	1	35	10	1584	1231	28	10	0	00g
5	1	1	1	35	11	1633	1236	4	5	24	2
5	1	1	1	35	12	1671	1230	5	5	17	Eee
5	1	1	1	35	13	1760	1237	10	4	43	oD
5	1	1	1	35	14	1835	1234	24	14	0	aT
5	1	1	1	35	15	1932	1230	48	18	56	Ca
5	1	1	1	35	16	2020	1238	24	12	26	a
5	1	1	1	35	17	2217	1225	85	53	31	“toot
5	1	1	1	35	18	2430	1246	4	9	0	‘
5	1	1	1	35	19	2485	1228	22	28	55	~~
5	1	1	1	35	20	2612	1257	2	3	0	;
5	1	1	1	35	21	2682	1253	48	15	24	=
5	1	1	1	35	22	2907	1252	7	6	2	_
5	1	1	1	35	23	3090	1263	38	11	16	—
4	1	1	1	36	0	328	1203	2817	93	-1	
5	1	1	1	36	1	654	1199	33	64	2	ar
5	1	1	1	36	2	793	1203	27	47	4	8
5	1	1	1	36	3	966	1230	25	16	11	giv
5	1	1	1	36	4	1102	1240	28	6	38	a
5	1	1	1	36	5	1377	1230	87	26	0	ho
5	1	1	1	36	6	1495	1226	77	68	29	ame
5	1	1	1	36	7	1577	1230	69	42	33	es
5	1	1	1	36	8	1685	1253	47	14	50	|
5	1	1	1	36	9	1755	1230	112	41	7	Se
5	1	1	1	36	10	1942	1250	30	35	39	A
5	1	1	1	36	11	2022	1256	87	16	20	Seal
5	1	1	1	36	12	2137	1249	160	41	13	AE
5	1	1	1	36	13	2475	1265	75	29	31	ae
5	1	1	1	36	14	3094	1251	43	56	23	nt
4	1	1	1	37	0	328	1246	2789	67	-1	
5	1	1	1	37	1	328	1250	1	6	85	|
5	1	1	1	37	2	403	1246	173	13	13	ee)
5	1	1	1	37	3	675	1251	15	7	31	a
5	1	1	1	37	4	838	1260	11	5	38	3
5	1	1	1	37	5	912	1261	3	3	47	_
5	1	1	1	37	6	1070	1260	2	2	0	:
5	1	1	1	37	7	1510	1270	5	6	52	4
5	1	1	1	37	8	1638	1265	49	14	22	tom
5	1	1	1	37	9	1799	1255	16	31	37	Pe
5	1	1	1	37	10	1898	1277	4	3	20	at
5	1	1	1	37	11	2020	1275	4	7	42	7
5	1	1	1	37	12	2092	1277	6	3	0	”
5	1	1	1	37	13	2152	1289	3	2	58	:
5	1	1	1	37	14	2273	1279	4	4	0	-
5	1	1	1	37	15	2469	1287	20	5	21	oe
5	1	1	1	37	16	2699	1294	4	2	17	ae
5	1	1	1	37	17	2764	1269	16	31	44	ra
5	1	1	1	37	18	2920	1295	17	10	62	4
5	1	1	1	37	19	3039	1309	2	4	0	,
5	1	1	1	37	20	3100	1300	17	13	37	\
4	1	1	1	38	0	351	1257	2747	83	-1	
5	1	1	1	38	1	351	1257	30	7	23	Se
5	1	1	1	38	2	549	1260	73	22	25	ee
5	1	1	1	38	3	872	1267	30	20	44	=
5	1	1	1	38	4	975	1273	5	7	59	J
5	1	1	1	38	5	1033	1273	22	16	39	Do
5	1	1	1	38	6	1279	1277	7	6	68	~
5	1	1	1	38	7	1373	1287	10	15	76	a
5	1	1	1	38	8	1422	1277	12	17	58	Ff
5	1	1	1	38	9	1520	1283	115	18	0	“~~
5	1	1	1	38	10	1696	1291	111	15	53	i”
5	1	1	1	38	11	1907	1288	4	3	0
                    ne       a            .             a              ,        .                                    i |. oh).  oe             a      ¢                .        5     ok    =
      en                        SS            a         4  x,    -                           an                        es oe               Paes                  —s
       >     ~         est Sain            .    ase         iG   ‘        >             “    ,       “       e   i   +         ee      , a  ching i ae   eee      2                      7
                                                                                                                 a |              »     ol     ie Ps         ova.          a            —
      Pen           > eee                  Sted.              ala fh aoa               aon aor mtg      t Ds     er   | ad  c     si   ——* ————              J  BE         -     —       ‘
               Tee            |: A         ae    ©       SS                eeeesnea seer                                                              “i:        =       Pa te)          we
      Rd     ae       -     ate A                        a + -                       a.           z        a5        “i    a                       aT i        ae                   —
      iia      —            ye       aa     ——       a      ind ee                 §   rf cf            \    &       :   Th         _—_—            P         -    -   Z Oe              -
      ies                                   ee:                        ee     atts                             At                ee          re                 ae.                 eh
           .  qn.      ,      re   ~        .    “er,                   —      a      me    JARO NONNDPIN        2     ee       ;   -           >
5	1	1	1	46	18	2813	1510	50	43	14	Ral
5	1	1	1	46	19	2887	1517	20	59	1	F
5	1	1	1	46	20	2906	1521	109	51	30	ee
4	1	1	1	47	0	414	1495	2599	81	-1	
5	1	1	1	47	1	414	1503	8	18	0	,
5	1	1	1	47	2	694	1495	94	35	0	,
5	1	1	1	47	3	824	1500	178	49	31	thin”
5	1	1	1	47	4	1069	1511	13	8	44	te
5	1	1	1	47	5	1296	1499	16	61	3	if
5	1	1	1	47	6	1668	1524	108	50	22	Rh
5	1	1	1	47	7	1840	1525	80	34	31	ea
5	1	1	1	47	8	1952	1521	148	55	22	Fe
5	1	1	1	47	9	2263	1537	37	25	58	be
5	1	1	1	47	10	2655	1565	10	9	39	ae
5	1	1	1	47	11	2757	1523	32	61	43	es
5	1	1	1	47	12	3010	1555	3	3	10	.
4	1	1	1	48	0	453	1527	2554	73	-1	
5	1	1	1	48	1	408	1525	50	36	52	x,
5	1	1	1	48	2	592	1539	29	12	13	1
5	1	1	1	48	3	725	1540	27	19	26	|
5	1	1	1	48	4	746	1538	82	45	20	ia
5	1	1	1	48	5	1060	1527	42	29	13	,
5	1	1	1	48	6	1303	1545	63	30	41	i
5	1	1	1	48	7	1381	1539	41	54	19	ar
5	1	1	1	48	8	1520	1555	29	15	0	ieee)
5	1	1	1	48	9	1685	1558	14	26	4	BW
5	1	1	1	48	10	1758	1551	54	34	0	Ve
5	1	1	1	48	11	1830	1563	29	21	0	nhe
5	1	1	1	48	12	1927	1564	12	31	28	¥
5	1	1	1	48	13	2006	1569	4	8	55	wei
5	1	1	1	48	14	2065	1564	4	8	62	&
5	1	1	1	48	15	2544	1579	7	16	0	:
5	1	1	1	48	16	2645	1584	6	9	0	;
5	1	1	1	48	17	2850	1587	14	13	3	e
5	1	1	1	48	18	3006	1595	1	3	29	:
4	1	1	1	49	0	358	1538	2581	137	-1	
5	1	1	1	49	1	358	1561	187	56	0	rete
5	1	1	1	49	2	619	1543	36	41	42	dl
5	1	1	1	49	3	704	1538	398	93	21	POR
5	1	1	1	49	4	1324	1609	12	14	0	B..
5	1	1	1	49	5	1811	1585	223	66	9	yt
5	1	1	1	49	6	2026	1548	146	146	0	Ue
5	1	1	1	49	7	2208	1548	74	146	23	ae
5	1	1	1	49	8	2677	1619	262	56	16	ea
4	1	1	1	50	0	405	1600	2669	113	-1	
5	1	1	1	50	1	584	1601	82	38	12	ee
5	1	1	1	50	2	804	1626	70	56	22	ee
5	1	1	1	50	3	1510	1625	163	52	17	ete
5	1	1	1	50	4	1878	1632	108	81	8	tl
5	1	1	1	50	5	1943	1606	75	111	20	yy
5	1	1	1	50	6	2017	1606	56	111	55	|
5	1	1	1	50	7	2116	1672	3	4	13	Maa
5	1	1	1	50	8	2623	1653	83	28	0	Era
5	1	1	1	50	9	2781	1670	30	26	8	ep
5	1	1	1	50	10	2858	1666	216	35	23	ee
4	1	1	1	51	0	328	1654	2795	82	-1	
5	1	1	1	51	1	328	1654	225	42	29	Yee
5	1	1	1	51	2	620	1655	134	67	17	ee
5	1	1	1	51	3	907	1673	24	20	19	ee
5	1	1	1	51	4	1156	1657	511	60	0	Sieirireee
5	1	1	1	51	5	1760	1713	2	2	32	fy
5	1	1	1	51	6	1918	1708	8	15	33	a
5	1	1	1	51	7	2014	1652	33	95	25	|
5	1	1	1	51	8	2302	1698	10	5	12	:
5	1	1	1	51	9	2624	1707	64	14	24	ae
5	1	1	1	51	10	2730	1705	206	45	5	i
4	1	1	1	52	0	329	1694	2732	70	-1	
5	1	1	1	52	1	329	1694	5	5	21	:
5	1	1	1	52	2	677	1713	5	5	5	,
5	1	1	1	52	3	819	1705	5	13	0	/
5	1	1	1	52	4	1189	1706	18	22	17	A
5	1	1	1	52	5	1391	1716	82	14	18	+
5	1	1	1	52	6	1686	1713	11	6	0	:
5	1	1	1	52	7	1796	1738	4	4	31	.
5	1	1	1	52	8	2737	1736	45	26	39	Men
5	1	1	1	52	9	2820	1743	3	14	36	|
5	1	1	1	52	10	2856	1745	149	19	19	ae
5	1	1	1	52	11	3057	1749	4	3	22	me
4	1	1	1	53	0	524	1719	2562	74	-1	
5	1	1	1	53	1	452	1716	100	29	0	soe
5	1	1	1	53	2	661	1719	20	26	18	aay
5	1	1	1	53	3	914	1741	3	4	53	;
5	1	1	1	53	4	1144	1738	35	13	37	5
5	1	1	1	53	5	1292	1732	99	30	13	a.
5	1	1	1	53	6	1451	1728	58	23	32	Re
5	1	1	1	53	7	1914	1751	3	5	55	-
5	1	1	1	53	8	2111	1759	8	10	37	-
5	1	1	1	53	9	2292	1756	56	23	33	aT
5	1	1	1	53	10	2413	1761	34	16	57	“x
5	1	1	1	53	11	2604	1770	26	4	29	x
5	1	1	1	53	12	2720	1761	4	5	1	:
5	1	1	1	53	13	2891	1767	3	3	0	-
5	1	1	1	53	14	3043	1787	43	6	64	ee
4	1	1	1	54	0	472	1723	2388	99	-1	
5	1	1	1	54	1	472	1734	102	40	11	ea
5	1	1	1	54	2	581	1723	172	71	1	es
5	1	1	1	54	3	1282	1771	4	11	32	er
5	1	1	1	54	4	1374	1761	43	27	17	2
5	1	1	1	54	5	1446	1751	41	32	43	a
5	1	1	1	54	6	1891	1752	12	23	3	hE
5	1	1	1	54	7	1976	1757	115	62	21	ee
5	1	1	1	54	8	2272	1775	122	32	19	AR
5	1	1	1	54	9	2473	1804	124	12	31	Se
5	1	1	1	54	10	2651	1795	51	19	15	eae
4	1	1	1	55	0	453	1769	2582	90	-1	
5	1	1	1	55	1	483	1769	65	29	0	oe.
5	1	1	1	55	2	735	1781	4	20	4	:
5	1	1	1	55	3	899	1784	41	42	54	29ND
5	1	1	1	55	4	940	1784	29	42	34	1n0
5	1	1	1	55	5	972	1784	49	42	27	NEL
5	1	1	1	55	6	1021	1784	40	42	47	LT
5	1	1	1	55	7	1232	1806	3	2	49	‘
5	1	1	1	55	8	1311	1804	2	5	18	a
5	1	1	1	55	9	1332	1788	54	36	20	a
5	1	1	1	55	10	1463	1797	56	15	19	ae
5	1	1	1	55	11	1681	1803	71	31	0	reso
5	1	1	1	55	12	1750	1799	29	42	43	a
5	1	1	1	55	13	1816	1793	44	41	14	oJ
5	1	1	1	55	14	2244	1814	5	2	33	es
5	1	1	1	55	15	2327	1819	20	25	26	PA
5	1	1	1	55	16	2410	1803	36	48	33	Sa
5	1	1	1	55	17	2451	1825	55	11	33	ee
5	1	1	1	55	18	2557	1814	27	32	0	prem
5	1	1	1	55	19	2595	1825	68	24	0	ore
5	1	1	1	55	20	2824	1820	21	39	48	in
5	1	1	1	55	21	2932	1835	6	3	0	we
4	1	1	1	56	0	495	1806	2649	90	-1	
5	1	1	1	56	1	495	1806	90	30	45	ae
5	1	1	1	56	2	768	1829	5	4	0	:
5	1	1	1	56	3	849	1816	10	19	0	-
5	1	1	1	56	4	1124	1839	18	28	0	-
5	1	1	1	56	5	1216	1811	9	13	1	:
5	1	1	1	56	6	1405	1818	48	24	14	gare
5	1	1	1	56	7	1580	1820	62	14	48	a
5	1	1	1	56	8	1669	1839	25	43	8	by
5	1	1	1	56	9	1821	1837	104	15	17	pS
5	1	1	1	56	10	2013	1821	34	66	0	Vi
5	1	1	1	56	11	2173	1854	82	9	0	aE
5	1	1	1	56	12	2393	1853	46	26	28	ete
5	1	1	1	56	13	2473	1855	111	26	28	pe
5	1	1	1	56	14	2987	1860	5	3	24	ee
5	1	1	1	56	15	3059	1870	50	26	9	en
5	1	1	1	56	16	3098	1856	43	46	32	ae
4	1	1	1	57	0	629	1830	2432	92	-1	
5	1	1	1	57	1	629	1847	17	21	82	4
5	1	1	1	57	2	720	1830	62	57	17	is
5	1	1	1	57	3	870	1847	124	33	27	ee
5	1	1	1	57	4	1174	1868	6	5	55	;
5	1	1	1	57	5	1268	1861	21	10	24	a
5	1	1	1	57	6	1807	1862	21	48	0	rs
5	1	1	1	57	7	2042	1872	4	5	0	/
5	1	1	1	57	8	2187	1903	17	3	12	?
5	1	1	1	57	9	2290	1875	117	39	40	ey
5	1	1	1	57	10	2813	1885	56	47	22	Gilg
5	1	1	1	57	11	2868	1896	38	26	18	Ts
5	1	1	1	57	12	3013	1896	14	19	36	5;
5	1	1	1	57	13	3057	1903	4	10	62	!
4	1	1	1	58	0	619	1869	2526	85	-1	
5	1	1	1	58	1	619	1888	20	13	29	=
5	1	1	1	58	2	731	1878	5	12	0	:
5	1	1	1	58	3	860	1869	121	35	0	—
5	1	1	1	58	4	1021	1904	7	5	40	.
5	1	1	1	58	5	1140	1877	29	14	0	eo
5	1	1	1	58	6	1289	1902	11	16	0	-
5	1	1	1	58	7	1411	1902	2	2	18	'
5	1	1	1	58	8	1652	1896	17	27	0	.
5	1	1	1	58	9	2006	1901	12	43	0	fr
5	1	1	1	58	10	2118	1904	43	43	37	hat
5	1	1	1	58	11	2180	1910	7	26	53	-
5	1	1	1	58	12	2273	1931	5	5	24	9
5	1	1	1	58	13	2290	1910	29	26	25	a
5	1	1	1	58	14	2377	1898	69	44	37	a
5	1	1	1	58	15	2684	1903	60	51	34	ate
5	1	1	1	58	16	2986	1911	12	43	15	mn
5	1	1	1	58	17	3097	1925	48	18	21	“4
4	1	1	1	59	0	503	1891	2552	89	-1	
5	1	1	1	59	1	503	1906	12	18	55	‘
5	1	1	1	59	2	577	1923	10	12	14	a
5	1	1	1	59	3	625	1907	22	24	30	a
5	1	1	1	59	4	711	1891	18	43	16	rl
5	1	1	1	59	5	804	1903	14	27	0	A
5	1	1	1	59	6	840	1921	3	3	0	~~
5	1	1	1	59	7	1043	1910	3	4	33	.
5	1	1	1	59	8	1137	1930	3	4	0	,
5	1	1	1	59	9	1308	1912	41	34	17	em
5	1	1	1	59	10	1420	1923	4	5	8	a
5	1	1	1	59	11	1662	1929	20	27	24	ag
5	1	1	1	59	12	1829	1943	15	21	25	.
5	1	1	1	59	13	2103	1939	3	4	10	*
5	1	1	1	59	14	2164	1938	37	31	34	a
5	1	1	1	59	15	2217	1938	52	31	10	roe
5	1	1	1	59	16	2284	1948	6	5	0	,
5	1	1	1	59	17	2305	1931	15	37	34	ha
5	1	1	1	59	18	2376	1942	33	30	46	ee
5	1	1	1	59	19	2457	1968	3	1	46	7
5	1	1	1	59	20	2545	1943	9	24	0

         7              or                     Tr                gS!               ;                    ;                      5     t gh                                    i              /
                                                                                                                                                         ”      a           7  =      s
           >                               aaoee     yy           Co               2   Se              vo al          ze     a™*         - ig’    oT ae ae M              é   Ae           ys
       e          = fF             > y                 wr      el    Aa
5	1	1	1	62	9	2067	2072	17	47	0	r
5	1	1	1	62	10	2250	2074	37	37	44	a
5	1	1	1	62	11	2322	2069	62	42	35	ik
5	1	1	1	62	12	2614	2079	12	6	0	o
5	1	1	1	62	13	2731	2081	112	28	10	eet
5	1	1	1	62	14	2946	2091	134	31	18	Oke
4	1	1	1	63	0	376	2068	2730	84	-1	
5	1	1	1	63	1	376	2075	94	18	29	i)
5	1	1	1	63	2	506	2068	74	36	21	he
5	1	1	1	63	3	910	2090	8	11	0	f
5	1	1	1	63	4	1200	2081	176	48	0	 vespizayz
5	1	1	1	63	5	1384	2101	48	21	47	107
5	1	1	1	63	6	1656	2099	36	27	0	-
5	1	1	1	63	7	1929	2099	5	10	0	,
5	1	1	1	63	8	2371	2115	17	27	36	>.
5	1	1	1	63	9	2608	2116	14	36	47	f
5	1	1	1	63	10	2985	2126	121	32	12	eS.
4	1	1	1	64	0	328	2099	2745	123	-1	
5	1	1	1	64	1	328	2131	2	4	23	le
5	1	1	1	64	2	482	2114	15	8	33	7
5	1	1	1	64	3	516	2120	6	6	58	*
5	1	1	1	64	4	601	2099	119	35	0	—s
5	1	1	1	64	5	750	2130	31	14	0	~
5	1	1	1	64	6	884	2139	2	3	0	;
5	1	1	1	64	7	969	2135	6	4	71	*
5	1	1	1	64	8	1090	2137	12	23	57	3
5	1	1	1	64	9	1120	2110	43	54	17	a
                                                                                                           “         M      :          +   sy . si -      VE    % the Tis   4   a    Ti -
       ,.    s                      _             J      ale |          -                                   “                       OF  tie  .   7              oe od
         a)                                        ae                 ye                                aa           ait      “\Y sae oo 4         #           bs     gare
         .           S                             *.)    y,                                             ee                      SS     .   —
              s       u&     #            ee     :     Es

Section 22

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016


                                     ATTACHMENT 2




                                        Page 22 of 81

GENERAL COMMITTEE MEETING AGENDA                                                 12 DECEMBER 2016

                                                                                     ATTACHMENT 2
     Our reference:    SDA-0816-032888
     Council reference: MCU16/0090
     Your reference:   SUN/010816

     Attachment 1—Conditions to be imposed

     Development Permit — Material Change of Use — Wellbeing Type 2 - Social
     Schedule 7, Table 3, Item 1 — State-controlled road — material change of use —Pursuant to section
     255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates
     the Director-General of the Department of Transport and Main Roads to be the assessing authority
     for the development to which this development approval relates for the administration and
     enforcement of any matter relating to the following condition(s):
     In accordance with approved plans
              The development must be carried out generally in accordance     Prior to the
              with the following plans:                                       commencement of
                                                                              use and to be
                  e   Landscape Concept Plan, prepared by Sunshine            maintained at all
                      Gardens, dated 20 September 2015, drawing no. L002,     times.
                      Revision A, as amended in red on 4/11/16 by TMR; and

                  e   Basic Right Turn Lane Treatment (BAR) Layout, prepared
                      by TOD engineers and project managers, dated 28 July
                     2016, drawing no. 16520 SK1, revision A

     Vehicular access to the state-controlled road
              (a)   The road access location(s), is to be located generally in Sy AE SIs.
                    accordance with:

                    Landscape Concept Plan, prepared by Sunshine Gardens,
                    dated 20 September 2015, drawing no. L002, Revision A,
                    as amended in red on 4/11/16 by TMR.

              (b) | Road access works comprising a Basic Right Turn (BAR)     (b) Se ad
                    and Basic Left Turn (BAL) treatment for the entry driveway,  of use and to be
                    and a rural driveway standard (both driveways) must be       maintained at all
                    provided at the road access location(s).                     times.

              (c)   The road access works must be designed and constructed | (C) Prior to the
                    in accordance with:                                          commencement
                      IPWEA RS-056 Driveway   4.0m width and sealed from th      of use and to be
                  °             °      iveway  4.0m  WI       gated  trom tne    maintained at all
                      edge of the sealed road shoulder to the property           times.
                      boundary, with minimum 450mm dia. RCP culvert and
                     sloping headwalls; and

                                                                                        Page 22 of 81

Section 23

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 23 of 81

GENERAL COMMITTEE MEETING AGENDA                                                12 DECEMBER 2016

   |     |        -   TMR’s Road Planning and Design Manual.                Po
      Removal of redundant road access works

      3:      The existing vehicular property access as detailed in Landscape  Prior to the
              Concept Plan, prepared by Sunshine Gardens, dated 20             commencement of
              September 2015, drawing no. L002, Revision A, as amended in      the use.
              red on 4/11/16 by TMR must be permanently closed and
              removed.

      Design Vehicle and traffic volume
     4.       The road access location is restricted to an entry only (western At all times.
              driveway) and exit only (eastern driveway) arrangement, as
              detailed in Landscape Concept Plan, prepared by Sunshine
              Gardens, dated 20 September 2015, drawing no. L002, Revision
              A, as amended in red on 4/11/16 by TMR.

              (a) Stormwater management of the development must ensure no      (a) At all times.
                  worsening or actionable nuisance to the state-controlled road.

              (b) Any works on the land must not:
                i.    create any new discharge points for stormwater runoff              ;
                      onto the state-controlled road;                          (b) At all times.
                il.   interfere with and/or cause damage to the existing
                      stormwater drainage on the state-controlled road;
                ili.  surcharge any existing culvert or drain on the state-
                      controlled road;
                iv.   reduce the quality of stormwater discharge onto the state-
                      controlled road.

               (c) RPEQ certification must be provided to the Department of
                   Transport and Main Roads, confirming that the development | (c) Prior to the
                   has been designed and constructed in accordance with            commencement
                   parts (a) and (b) of this condition.                            of use.

                                                                                       Page 23 of 81

Section 24

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 24 of 81

GENERAL COMMITTEE MEETING AGENDA                                                    12 DECEMBER 2016

    Our reference:     SDA-0816-032888
    Council reference: MCU16/0090
    Your reference:    SUN/010816

    Attachment 2—Reasons for decision to impose conditions

    The reasons for this decision are:

        e   Toensure the development is carried out generally in accordance with the plans of
            development submitted with the application;

        e   Toensure the road access location to the state-controlled road from the site does not
            compromise the safety and efficiency of the state-controlled road;

        e   To maintain the safety and efficiency of the state-controlled road by reducing the number of
            road access;

        e   Toensure the turning movements of vehicles entering and exiting the premises via the road
            access maintains the safety and efficiency of the state-controlled road; and

        e   Toensure that the impacts of stormwater events associated with development are minimised
            and managed to avoid creating any adverse impacts on the state-transport corridor.

                                                                                           Page 24 of 81

Section 25

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 25 of 81

GENERAL COMMITTEE MEETING AGENDA                                                 12 DECEMBER 2016

   Our reference:    SDA-0816-032888
   Council reference: MCU16/0090
   Your reference:   SUN/010816

   Attachment 3—Further advice

   Advice to the Assessment Manager (SPA s287(6

   1.     Transport noise corridor:
          Mandatory Part (MP) 4.4 of the Queensland Development Code (QDC) commenced on 1
          September 2010 and applies to building work for the construction or renovation of a residential
          building in a designated transport noise corridor. MP4.4 seeks to ensure that the habitable
          rooms of Class 1, 2, 3 and 4 buildings located in a transport noise corridor are designed and
          constructed to reduce transport noise. Transport noise corridor means land designated under
          Chapter 8B of the Building Act 1975 as a transport noise corridor. A free online search tool can
          be used to find out whether a property is located in a designated transport noise corridor. This
          tool is available online at:
          http://spp.dsdip.esriaustraliaonline.com.au/geoviewer/map/planmaking. This tool allows
          searches on a registered lot number and/or property address to determine whether and how the
          QDC applies to the land.
   Further development permits, compliance permits or compliance certificates
   2.     Compliance contact details:
          Pursuant to section 255D of the Sustainable Planning Act 2009, the Department of Transport
          and Main Roads (TMR) has been nominated by the Chief Executive of the Department of
          Infrastructure Local Government and Planning as the entity responsible for the administration
          and enforcement of concurrence agency conditions within TMR’s area of interest.

          The development must obtain a letter from TMR detailing satisfaction of compliance prior to
          commencement of use or final inspection certificate or certificate of classification, whichever
          occurs first.

          The developer is advised an application for compliance assessment can be made to the
          Development Assessment Team via [email protected] of the Department of
          Transport and Main Roads (Please quote TMR16-018356).
   3.     Road access works approval: Under sections 62 and 33 of the Transport Infrastructure Act
          1994, written approval is required from the Department of Transport and Main Roads to carry
          out road works that are road access works (including driveways) on a state-controlled road.
          Please contact the Department of Transport and Main Roads on  [email protected] to
          make an application for road works approval. This approval must be obtained prior to
          commencing any works on the state-controlled road reserve. The approval process may require
          the approval of engineering designs of the proposed works, certified by a Registered
          Professional Engineer of Queensland (RPEQ). Please contact Transport and Main Roads as
          soon as possible to ensure that gaining approval does not delay construction.

                                                                                        Page 25 of 81

Section 26

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 26 of 81

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016

    Advice for the Assessment Manager
    Compliance:
    Pursuant to section 255D of the Sustainable Planning Act 2009, the Department of Transport and Main
    Roads (TMR) has been nominated by the Chief Executive of the Department of Infrastructure Local
    Government and Planning as the entity responsible for the administration and enforcement of
    concurrence agency conditions within TMR’s area of interest.

    TMR request Council obtain evidences that TMR’s conditions have been satisfied (/etter from TMR
    detailing satisfaction of compliance) prior to commencement of use.

                                                                                      Page 26 of 81

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                                  12 DECEMBER 2016


5                        DRAFT DEVELOPMENT ASSESSMENT RULES FOR NEW PLANNING ACT
DOCUMENT INFORM AT ION




Author                               Manager, Planning & Environment, Kerri Coyle
                                     Planning & Infrastructure Department

Index                                ECM/ Subject/ Planning Instruments/ State Planning

Attachments                          1.   Flow Chart of Application Process

EXECUTIVE SUMMARY
Not applicable.


RECOMMENDATION
That Council note the report by the Manager, Planning & Environment to the General Committee
Meeting dated 12 December 2016 and request the Chief Executive Officer make a submission to
the State government on the draft Development Assessment Rules for the Planning Act 2016
seeking that:
1.                       The assessment time frames of the Sustainable Planning Act 2009 be maintained. The
                         time frames are proposed to be generally halved under the proposed Development
                         Assessment Rules and have the potential to significantly impact on Council resources and
                         achieving good planning outcomes for Noosa. The proposed shortened time frames will not
                         allow time to undertake a thorough assessment of development proposals and consult
                         appropriately with the community without additional resources to Council’s Development
                         Assessment team. Additional resources would need to be funded by raising fees and
                         charges for development applications, increasing costs for developers.
2.                       The Development Assessment Rules maintain and extend the time frame for applicants to
                         be able to revive a development application where it lapses. This ability is not consistent
                         with the identified intention for the development process to be ‘an applicant driven process’,
                         and is likely to create administrative problems for councils and lead to significant confusion
                         for the community, particularly submitters.
3.                       The opt-out step for information requests be deleted from the Development Assessment
                         Rules. The ability to opt-out of an information request in the Development Assessment
                         Rules is likely to add significant complexity to the development assessment process
                         without adding value as an applicant currently has multiple options in regard to giving a
                         response to a request for further information. It is critical that councils and state agencies
                         retain the ability to raise issues and identify further information that is required in order to
                         fully understand and assess development proposals.
4.                       Applicants be responsible for notifying all relevant entities of a change to the development
                         application given the identified intention for the development process to be ‘an applicant
                         driven process. S25.1 of the proposed Development Assessment Rules requires Councils
                         to give a copy of a notice of change to a development application to the relevant referral
                         agencies and advise on the effect of the change on the development process.’
5.                       Applicants be required to give notice of commencement of the public notification period to
                         assessment managers, given Council is responsible for ensuring that application material is
                         available for the community to review and determine whether submissions are properly
                         made S17.4 of the proposed Development Assessment Rules states that ‘the applicant
                         may give notice to the assessment manager of the intended start date of public notification’
                         and does not make this step mandatory.



                                                                                                         Page 27 of 81

Section 28

GENERAL COMMITTEE MEETING AGENDA                                          12 DECEMBER 2016


REPORT
The Sustainable Planning Act 2009 is to be replaced with new planning legislation, which was
passed by Queensland Parliament on 12 May 2016. The replacement legislation includes:
   The Planning Act 2016
   The Planning and Environment Court Act 2016
   The Planning (Consequential) and Other Legislation Act 2016
The new legislation is expected to commence on 3 July 2017. Development Assessment Rules
will support the Planning Act 2016 and a draft version is now open for public comment until
19 December 2016. A draft State Planning Policy, Planning Regulation 2017 and State
Development Assessment Provisions have also been released with consultation to close on 10
February 2017.
Statutory requirements for development assessment are included both in the Planning Act 2016
and the Development Assessment Rules and must be read concurrently for a complete picture of
how development assessment is intended to operate in the future.
The process for development assessment has reverted to an end to end approach and in this
regard is not unlike the Sustainable Planning Act 2009 as identified in the diagram below.
However, the time frames and decision rules for applications are vastly different and, as
contemplated for some time, the mandatory time frames have been significantly shortened with
no ability for Council to extend time frames without the applicant’s agreement. Time frames to
issue an information request and make a decision are essentially proposed to be halved.
The parts shown in black are those which are contained in the DA Rules.




The time frames for each part of the application process is set out in the diagram in
Attachment 1 with code and impact assessable applications required to follow the same process
with an additional 10 business days given to consider properly made submissions (but only
where received) for impact assessable applications.




                                                                                Page 28 of 81

Section 29

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


The key differences introduced by the Development Assessment Rules are to the time period
permitted in which to:
   issue an information request which has been limited to 10 business days where as
     currently there is the ability to extend this period by a further 10 business days, giving a
     total of 20 business days.
   Issue a Decision Notice which has been limited to 35 business days, with this time frame
     now including the time taken to issue an information request and issue the Decision Notice.
     Currently there is the ability for Councils to extend the decision period by a further 20
     business days, giving a total of 40 business days with a further 5 business days to prepare
     and issue the Decision Notice. The Decision Notice now must also be received by the
     applicant within the Decision Period.
Further changes that will impact on application processing include:
   A time frame has now been imposed on requests for a Negotiated Decision Notice of 20
     business days though this is included in the Planning Act 2016 and is not part of the
     Development Assessment Rules. Currently under SPA there is no statutory time frame for
     negotiations.
   Reasons for a decision or conditions are required for all approvals, not just those in conflict
     with the planning scheme. This is included in the Planning Act 2016 and is not part of the
     Development Assessment Rules.
   The ability for the applicant to choose not to receive an information request.
   The ability for the applicant to ‘stop the clock’ for a cumulative period of up to 6 months
     anywhere through the application process, apart from during the public notification period.
     Conceivably this means the applicant may stop the decision period in order to amend the
     application, with no restart requirement to the decision period or process unless the
     amended development is substantially different.
   Applicants will have up to 20 business days to ‘revive’ a lapsed application. Currently there
     is an allowance for applications to be revived within 5 business days of a period ‘lapsing’.
Notably the following has continued with the Planning Act 2016:
   Deemed approvals has continued for code assessable applications where not decided
     within the Decision Period. Deemed refusals has continued for impact assessable
     applications.
   10 Business Day referral agency assessment period for Local Governments when
     concurrence agency requirements apply.
The new planning legislation provisions, particularly the time frames set out by the Development
Assessment Rules, have the potential to significantly impact on Council resources and achieving
good planning outcomes.
Review of current workloads and processing times highlights that approximately 20%-30% of
applications would not be decided within the Planning Act 2016 and Development Assessment
Rules time frames, with officers over the last 3 years having a 20 business day target time frame.
This target time frame has been predominantly met for Operational Works applications but has
been exceeded increasingly for Material Change of Use and Reconfiguring a Lot applications due
to negotiations with applicants, referral to a Council meeting for a decision and over the last 11
months officers have advised it is due to workload. Planners have advised that the number of
enquiries has increased, with an increased number of pre-lodgements held and written searches
in the last 6 months evident.




                                                                                      Page 29 of 81

Section 30

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


Based on current workload trends, the Planning Act 2016 is highly likely to impact on the ability of
the DA Planning team to meet the statutory time frames imposed, and provide timely, considered
advice on planning matters and ultimately impact on the planning outcomes for Noosa Shire.
Current service levels will not be able to be maintained with current arrangements and practices.
There is also the real possibility of deemed approvals occurring and missed concurrence agency
responses.
Previous Council Consideration
Ordinary Meeting, 25 September 2014, Item 5, Page 18
That Council note the report by the Manager, Planning & Environment and Strategic Planner to
the Planning & Organisation Committee Meeting dated 16 September 2014 and request the
Chief Executive Officer to make a submission to the draft Planning and Development Bill 2014
and Planning and Environment Court Bill 2014 generally seeking that:-
A.    The Department of State Development, Infrastructure and Planning undertake consultation
      on the draft Planning and Development Regulations and Guidelines where much of the
      practical impacts of the legislation changes for the community, development industry and
      local governments will be located;
B.    Local governments and their communities should continue to retain the ability to decide
      through their planning schemes which developments will be required to be publicly notified
      and have third party appeal rights;
C.    Where an application conflicts with the planning scheme, the onus of proof should be on
      the applicant to prove the merits of the proposal and justify the inconsistency rather than
      what appears to be an onus on the assessment manager to prove that the intent of the
      planning scheme should be upheld;
D.    Section 89 of the Planning and Development Bill 2014 be amended to remove the
      requirement for local governments to provide a notice to applicants and owners that their
      approval will lapse, as this should be the responsibility for applicants and owners to
      monitor;
E.    A time limit requirement be included for Conversion Applications and Offset Establishment
      Cost review requests to be made and undertaken during the period for a Negotiated
      Decision Notice to reduce uncertainty for local governments;
F.    An allowance be included for Local Governments to index all Infrastructure Charges from a
      set base date in accordance with the applicable index to address increasing infrastructure
      costs;
G.    Councils should have the ability to issue an Infrastructure Charges Notice for minor
      changes to development approvals issued prior to 1 July 2011 that involve an increase to
      the intensity of the development and for extensions to the currency period; and
H.    Provide within the P&D Bill the ability for local government planning schemes to also apply
      to assessment of uses within the local government tidal area/river lease areas to support
      improved management of marine activities and address potential impacts on adjacent
      foreshores and uses.

Ordinary Meeting, 15 January 2015, Item 1, Page 3
That Council note the report by the Principal Strategic Planner and the Manager, Planning &
Environment to the General Committee dated 12 January 2015 and request the Chief Executive
Officer to make a submission to the Dept of State Development, Infrastructure and Planning
regarding the following points:
A.    The Planning & Development Bill and Planning & Development Regulations are not clear in
      the decision rules, particularly for those applications which conflict with the planning
      scheme. It is considered that where an application conflicts with the planning scheme, the
      onus of proof should be on the applicant to prove the merits of the proposal and justify any
      inconsistencies;


                                                                                     Page 30 of 81

Section 31

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


B.   The Planning & Development Bill includes a clause that allows a regulation to prescribe the
     assessment manager for a development application as any person from a class of persons
     who have stated qualifications or characteristics. It is unclear whether this will result in an
     additional class of private entities (chosen by the Minister) being identified as assessment
     managers in place of councils for particular applications. This is of significant concern as
     experience has demonstrated that private building certification has not always been
     successful in implementing planning scheme requirements. This is particularly important for
     any operational works applications that include works which are to become a public asset
     and be maintained at ratepayers expense;
C.   The Planning & Environment Court Bill maintains the specific criteria for making a costs
     order introduced with the Sustainable Planning and other Legislation Amendment Bill 2012.
     These rules do not serve the public interest of enabling the community, submitters, local
     governments and developers to dispute planning decisions due to the risk and uncertainty
     of the Court awarding costs against them. The previous Court powers to award costs in
     circumstances where cases were frivolous or vexatious or instituted primarily to delay or
     obstruct are considered sufficient protections from abuse of the system;
D.   The definition of material change of use should not be limited to only increases in scale and
     density of the premises, as there are circumstances where reducing the scale of the
     development does materially change the site’s use. This is particularly relevant for
     developments which include an important community use or the like. For example
     removing the nursing home component from a retirement village may have a significant
     social impact on an area;
E.   The Planning & Development Bill maintains and extends the time frame for applicants to be
     able revive a development application where it lapses. This ability is not consistent with the
     principles for the DA Rules of being an applicant driven process, and is likely to create
     administrative problems for Councils and lead to significant confusion for the community,
     particularly submitters.
F.   As Noosa Council values community engagement in its planning and development
     decisions, we have concerns regarding changes that may serve to inhibit, obstruct or
     minimise resident input. Reductions in public notification periods and removal of existing
     requirements for notices to be placed in local newspapers are thus not supported and there
     should be a minimum notification period for applications of 20 business days. We also have
     concerns about the proposal that an applicant may choose to publicly notify a development
     application as early as 5 days after the development application is properly made. We
     believe submitters are better served under the current arrangement where public
     notification is able to occur following the information request period;
G.   Noosa Council has long enjoyed a locally popular planning scheme that is in part premised
     on studies and deliberations concerning the ideal carrying capacity for our shire. We have
     concerns that the Queensland Planning Reform Process may herald arbitrary
     enlargements of the Urban Footprints within the Noosa Shire area;
H.   Noosa Council does not support proposed changes relating to Community Infrastructure
     designation that will remove local government powers to designate infrastructure. Nor do
     we support the proposal for the State Planning Minister to be the sole designating Minister
     for Infrastructure Designation in Queensland and to thus choose what developments can
     proceed, be they public or private infrastructure, and have them exempt from planning
     scheme requirements and from infrastructure charges; and
I.   The maximum infrastructure charges prescribed by legislation remain unchanged since
     being introduced in 2011. Infrastructure charges have dropped in real terms due to
     indexation not being applied. This prohibits councils from making charges that reflect the
     actual current costs of building infrastructure. Thus the proportional costs of public
     infrastructure related to new development are being met by the community. Meanwhile the
     State Government adds 3.5% annual indexation to its own fees and charges. Noosa
     Council thus requests that annual automatic indexation of the current maximum capped
     charges be introduced to reflect increasing costs of providing infrastructure.

                                                                                    Page 31 of 81

Section 32

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


Ordinary Meeting, 22 October 2015, Item 1, Page 8
That Council note the report by the Manager, Planning & Environment, Principal Strategic
Planner and Infrastructure Assessment Coordinator to the Planning & Organisation Committee
Meeting dated 13 October 2015 and make a submission to the Department of Infrastructure,
Local Government and Planning on the draft Planning Bills in accordance with the following:
A.    The Planning & Development Bill and Planning & Development Regulations are not clear in
      the decision rules, particularly for those applications which conflict with the planning
      scheme. It is considered that where an application conflicts with the planning scheme, the
      onus of proof should be on the applicant to prove the merits of the proposal and justify any
      inconsistencies. Further, clear grounds and/or reasons should be required to be provided
      as part of the decision in order to ensure a transparent, accountable development
      assessment system for the community;
B.    The definition of material change of use should not be limited to only increases in scale and
      density of the premises, as there are circumstances where reducing the scale of the
      development does materially change the site’s use. This is particularly relevant for
      developments which include an important community use or the like. For example
      removing the nursing home component from a retirement village may have a significant
      social impact on an area;
C.    Case law on the SPA definition of ‘use’ makes it clear that secondary uses forming part of a
      primary use must not only be incidental, but also necessarily associated such that it would
      be impossible for the primary use to be carried out in the absence of the incidental use.
      The definition proposed in the Bill related to ‘use’ fundamentally expands the activities that
      may be carried out because secondary activities need not be necessarily associated with
      the primary use to be considered part of that use and as a result, lawful. The regulation
      and enforcement of activities that were not contemplated as part of a development
      approval (although ancillary) may prove problematic for councils and undermine local
      communities’ understanding of the development process;
D.    The removal of the requirement to consider whether a person may make a properly made
      submission objecting to change from the minor change test is likely to undermine the
      communities input into development assessment matters, particularly where they may be
      impacted upon by a proposed change;
E.    The Planning Bill maintains and extends the time frame for applicants to be able revive a
      development application where it lapses. This ability is not consistent with the principles for
      the DA Rules of being an applicant driven process, and is likely to create administrative
      problems for councils and lead to significant confusion for the community, particularly
      submitters;
F.    In the absence of demonstrable net benefit, no change is sought to the existing levels of
      assessment or the terms used (i.e. code and impact) in the new legislation;
G.    The proposed extension of Infrastructure Designation to privately owned infrastructure is a
      significant policy shift and would remove due consideration by the community, third party
      appeal rights and the need to comply with the planning scheme. Infrastructure charges
      revenue would be forfeited and would result in a considerable cost shift onto councils and
      their local communities. Statutory requirements around community infrastructure should at
      a minimum enable council to have a statutory role similar to a referral agency and allow
      consideration of local planning instruments in the designation process;
H.    Key process matters (including the development assessment process) should not be
      moved from the principal legislation and into subordinate legislation, given the potential
      negative outcomes for Councils and the broader community. The framework should be
      located in one statutory instrument to ensure genuine review processes cannot be
      expedited without due consultation and engagement;
I.    Attachment 1 of this report which includes comment on Draft Planning Bills provisions
      relating to Infrastructure Charges as amended at the Planning & Organisation Committee
      dated 13 October 2015;

                                                                                     Page 32 of 81

Section 33

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


J.   Attachment 2 of this report which includes feedback to the Department of Infrastructure,
     Local Government and Planning on the specific issues the Department requested comment
     on;
K.   The ability to opt-out of an information request in the Development Assessment Rules is
     likely to add significant complexity to the development assessment process without adding
     value, as an applicant has multiple options in regard to giving a response to a request for
     further information. It is critical that Councils and state agencies retain the ability to raise
     issues and identify further information that is required in order to fully understand and
     assess development proposals. The opt-out step should be deleted from the Development
     Assessment Rules;
L.   The ability for applicants to determine at what point during the assessment stage public
     notification will occur, including prior to a response to responding to an information request,
     is likely to significantly complicate the development assessment process in contravention of
     the intended outcome. This ‘floating’ public notification will also impact on local
     government systems and process due to inconsistency in regard to when public notification
     will take place. Further the purpose of public notification is to assist community members
     in being informed of the proposed development, yet a ‘floating’ public notification
     undermines certainty and community confidence in understanding the planning processes
     and development proposals. It is critical that the community have all the information about
     a development proposal, including responses to Council’s information request, when
     making submissions to a development application. The public notification should only
     occur after responses to the information request have been received and thus made public.
M.   The removal of existing requirements for notices to be placed in local newspapers is also
     not supported as it may limit the ability for the community to be aware of development
     proposals and engagement in planning and development decisions;
N.   The Planning Bill introduces the ability for costs to be awarded in regard to enforcement
     notice appeals. However it is unclear in the drafting as to the rules when costs would be
     awarded and it is considered that the same criteria as proposed for development
     application appeals should apply to enforcement notice appeals; and
O.   The State Government is to be commended in acknowledging that the planning system
     must be grounded in local communities and for recognising and supporting the central role
     of local government in land use planning and decision making. In addition, the commitment
     the State Government has made to providing time and to consider funding support for local
     governments to manage a transition process to new planning legislation is appreciated.
     Council is also pleased that the former appeal cost provisions of SPA have been returned.


Finance & Risk
A number of options have been reviewed to address the likely impacts of the Planning Act 2016
and Development Assessment Rules such as making use of private certification as envisaged by
the Planning Act 2016, engagement of consultants, reporting by exception/fast tracking etc.
through a Service Review process. A Service Review concluded that these options will not
maintain the current service levels and standards for planning outcomes sought by the Noosa
community and the preferred option is for additional resources to be added to the DA Planning
team.
These additional resources would need to be funded by potentially raising fees and charges for
development applications by 10% or more.




                                                                                     Page 33 of 81

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                    12 DECEMBER 2016


Consultation
External Consultation - Community & Stakeholder
The draft Development Assessment Rules are currently being publicly notified for comment by
the Department of Infrastructure, Local Government & Planning, with submissions closing on 19
December 2016.
Internal Consultation
Departments/Sections Consulted:

   Chief Executive Officer                    Community Services                 Corporate Services
   Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
   Executive Support                          Community Development              ICT
                                              Libraries & Galleries              Procurement & Fleet
                                              Local Laws                         Property & Facilities
                                              Waste & Environmental Health       Revenue Services

   Executive Office                       X   Planning & Infrastructure
   Community Engagement                       Building & Plumbing Services
   Customer Service                           Civil Operations
   Economic Development                       Disaster Management
   Governance                                 Infrastructure Planning & Design
   Human Resources                        X   Planning & Environment
   Sustainability                             Strategic Land Use Planning




                                                                                             Page 34 of 81

Section 35

ATTACHMENT 1




 Page 35 of 81

3                 -               t                        bl                                                                                                                                                                            ATTACHMENT 1
     or an           impact             assessabdie
   er           Cette s yer heCme AL                                                             Ee
            Cy                             i                                                 rt

                                        10 bd,               20 bd."               5b.d,
                             Qn nnn rnc n etree se o-oo Genes sap eeesnerpenmen teense GB aareseeenss serene ofhte son         is     ms        _—        es      eS   —          ee    —       —         eo    —        oer     oe      oe       —       —
                                                                                                                       -                                                                                                                                          71
                                                                                eee                                       Notes: b.d = Business Days
                                     Assessment                                                                                                      enna                                           eereeeeneeee anne
   5                 sue            manageraves     De   parr pbersend   D>   manazer gives                            [SSS eas tesceeasintaiay ke exibeaed-Sy-uprvoueat votesaa tencapptcestsed tha coassnamakaneapae                                              |
 aS                  p               ee ee                                        notice                                  2. The applicant must also provide the assessment manager written notice of when the application was referred.
   &         Application                                                             .                                 | 3. This timeframe may be extended by agreement between the applicant and the referral agency.                                              |
                 lodged       or                                                     5                                    4. This is the timeframe in which public notification must be started following the completion of Part 3.
    o                -                                                               :                                    5. 10 b.d. is only available where submissions are received for the development application.
   =                z               eeeens                                           4                                 |  6. While the assessment manger may Start assessing the development application at any time, the assessment manager may not decide the     |
                     BevvsssesseeeeefD Ne atuenation  peseeadencasesteaseosessssssnuaiananannasesee!                        application during the first 10 b.d. after the day the decision making period commences, unless action is taken under Section 22.4 of the DA Rules,
                                       notice         3                                                                (*                                                                                                                                         ‘s
                                          erred           cae on Gere ae ne Ree                                      EE   «= Fae
                                          i                                    Referral agency      Appli                 Referral agency
                                          :                     seessnesaseeree                  .   Applicant takes   .
                                          i                     i         >     ahes action    D>   required actions Dr eves ponneaeuen
   —                                      ;
 a £                                      ;           Dye ied                                                                   .                          25 b.d. tess up to 10 b.d.
tr                                        Bicesnssasy     application    we                           SeCaca ADS     aan aera                                 phat, more
ES                                        :                to referral                                :          Part 3 (information Request)                       ices
   a                                      ;               FY 4 tila                                   §
                                          5                     :             Referralagency          :        Concurrence
                                          :                     :               gives referral        Ma         agency           Applicant responds        Referral agency
                                          :                    Feeseesseoneeee  confirmation   jae                gives       >     toinformation — .. “>         issues      eras 00s 010000 Reema St  gee nen mee   Se       os 20 0p A EERE
                                          j                                   notice or period                 information             request         y       response                                                                     :
                                          :                                      expires                         request                               :                                                                                    a

    4                                                                                                                                                 a                                                             bd
    °                                     ;                                                                                                            :                                                                                    ;
    3                                     i                                                                                                            i            Applicant carries      apo     eae                                      ;
    =                                     3                                                                                                            :                pat public    >    manager notice                                   :
 Te                                       :                                                                                                            t              notification         of compliance                                    i
   =                                      :                                                                                                                          Submissions are              j               Assessment                :
    $s                                    :                                                                                                                            made to the    pr wisnapercpesiderd                                  :
   oe                                     i                                                                                                                             manager                                   submissions
                                          ;                                        Part 3 (information Request)                                        i                                                               i    ptrersenseeeteeaeeened
    =                                                                                                                                                  :                                                               :    i          Assessment
 wine                                     i                                     jen.               Applicant responds                                  3                                                              iB    hae      manager decides
   3                                      BORER E ERR Re eee e eee eta EE eee eee meee en Rew me, 1 fo mati >- to information te ee nee eet meme eee e en een n tenn eee meee ewe                                      :              application and
E                                                                                 nreuuect              request                                                                                                        Fesesnnssecsseed issues decision
   g                                                                                                                                                                                                                                     notice*
                                                                                                                                                                                                                                     mn nner renter
                                                                            Bas... 10 arate                       ae                                                                                                                  ie ie we be 30
                                                                                                                                                                                                                                          request *

                                                                                                                                                                                                                                                Page 35 of 81

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                                           12 DECEMBER 2016



6                        ENDORSEMENT OF BIODIVERSITY ASSESSMENT REPORT
DOCUMENT INFORM AT ION




Author                              Principal Strategic Planner, Rebecca Britton
                                    Planning & Infrastructure Department

Index                               ECM/ Subject/ Environmental Management/ Environment Strategy/
                                    Biodiversity Plan

Attachment                          1.    Biodiversity Assessment Report
                                          (143pg attachment provided separately to this report; 2 x hard copies available in
                                          Councillors’ Room)



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Principal Strategic Planner to the General Committee Meeting
dated 12 December 2016, and:
A.                       Endorse the Biodiversity Assessment Report provided at Attachment 1 for the purpose of
                         informing the development of an Environment Strategy and supporting Biodiversity
                         Conservation Plan; and
B.                       Request staff to prepare a discussion paper for the purposes of community consultation for
                         the development of an Environment Strategy and Biodiversity Conservation Plan.



REPORT
Eco Logical Australia Pty Ltd were engaged to prepare a Biodiversity Assessment Report and
Biodiversity Conservation Plan for Noosa Shire. Council staff also commissioned experts with
local knowledge to peer review the results. Both documents will help to identify biodiversity
values, threats and management challenges, guide decision making and set management
priorities, as well as identify and align conservation partnership opportunities with the broader
community.

The draft Biodiversity Assessment Report has been completed and will be an important reference
document for the development of the Biodiversity Conservation Plan and an overarching
Environment Strategy.

The Biodiversity Plan is still under development, subject to further input from the community.
Preparation work on the Environment Strategy will commence in early 2017.

This report provides an overview of the Biodiversity Assessment Report and its
recommendations, and also outlines a process for developing the Biodiversity Conservation Plan
and Environment Strategy through stakeholder and community consultation.




                                                                                                                   Page 36 of 81

Section 37

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


1.   Biodiversity Assessment Report

The assessment report details the current and future status of biodiversity conservation in Noosa
Shire. It provides a scientific basis for the understanding of local biodiversity values. The report
builds upon existing flora and fauna studies prepared by Noosa Council in 2003 and Sunshine
Coast Regional Council in 2010. It also provides mapping of biodiversity values, including
vegetation communities, significant species habitat, threatened ecological communities,
waterways, wetlands, landscape corridors, ecological condition and conservation status. The
mapping uses a greater range of available information than previously, and takes advantage of
up-to-date processes and technology. Some field validation of vegetation records was also
completed.

The Assessment Report:
 summarises biodiversity values and threats;
 overviews land clearing patterns and rates;
 overviews development risks using planning scheme zoning information;
 presents a preliminary climate change vulnerability analysis that maps and ranks the
   anticipated exposure and sensitivity of broad vegetation groups (BVGs) to climate change
   impacts from coastal hazards, bushfire, increased temperature and evaporation;
 maps and ranks biodiversity values across the Shire;
 highlights some of Noosa’s conservation initiatives and programs and presents a series of
   case studies demonstrating how actions are being implemented on the ground; and
 identifies gaps in conservation management and recommends future conservation priorities
   to guide the development of the Biodiversity Conservation Plan.

Biodiversity values

Key features identified for Noosa’s biodiversity include:
 Approximately 55% of Noosa Shire is covered by native vegetation (remnant vegetation);
 A diverse range of vegetation communities exist, which can be classified into 61 regional
    ecosystem types (REs);
 While Noosa Shire comprises 4.1% of the total area of south east Queensland (SEQ), it
    contains representations of 39% of the REs that can occur in the bioregion;
 Unique ecosystems exist including rare subtropical examples of patterned fens (grassy
    wetlands), coastal lagoon systems, lakes and dune systems;
 A number of ecological communities and flora and fauna species are recognised and
    protected as endangered, vulnerable, near threatened etc. under state and federal
    environmental law, including the critically endangered lowland rainforest community;
 A great diversity of wildlife and plants are present (~1,340 species of plants and 348 species
    of terrestrial vertebrate animals). At least 217 species of birds, 45 species of reptiles, 55
    species of mammals, and 31 species of frogs are known from the area;
 Notable fauna species are present such as Koala, Glossy Black Cockatoo, Water Mouse,
    Ground Parrot, Coxen’s Fig Parrot, Powerful Owl, acid frogs, Cooloola Blind Snake, marine
    turtles, migratory shorebird species, Mary River Cod and Australian Lungfish to name a few;
 Critical habitats are present, including internationally recognised migratory bird habitats of
    conservation importance at the mouth of the Noosa River and Noosa North Shore and marine
    turtle nesting sites along the eastern beaches;
 A network of core habitat areas provide ecological connectivity from a diverse cross-section
    of ecosystem types and altitudinal ranges;
                                 



                                                                                     Page 37 of 81

Section 38

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


 Noosa River is the healthiest river system in SEQ with consistent A- to B+ report card ratings;
 A network of diverse wetlands is present, of good ecological condition and encompassing
   over 16,000 ha. Many are recognised as being of national or state significance; and
 Over one third of the shire is covered by protected reserves which play a critical role in
   conservation management locally and for the broader SEQ region.

Biodiversity Threats

Primary threats to Noosa’s biodiversity are identified as follows:
 Climate change – Noosa Shire’s biodiversity has a high exposure and sensitivity to predicted
   impacts of climate change. This includes increased disturbance to or loss of natural
   ecosystems, flora and fauna due to –
   o   increased storm surge and coastal erosion;
   o   more frequent and intense flooding and storm activity;
   o   higher mean temperatures and increased number of extremely hot days;
       greater intensity, spread and frequency of bushfires; and
   o   more frequent weeds encroaching into disturbed ecosystems.
   Vulnerable communities may include rainforests, eucalypt forests, saltmarshes, mangroves,
   wetlands, plant eating species (i.e. native folivores such as Koalas), and species vulnerable
   to mass die-off in hot conditions (such as flying foxes).
 Weeds and pest species – outcompete and prey on native species, smother and degrade
   natural ecosystems and can reduce or eliminate ecosystems functions. Examples include
   aquatic pest animals that prey on fish, crustaceans, frogs and reptiles, garden escapees of
   exotic plant species, pest animals preying marine turtles, exotic vines in rural bushland areas,
   and rural pests that degrade pasture and cause illness and injury to livestock and spread
   disease.
 Vegetation clearing – to make way for housing, infrastructure and agriculture – though this
   has slowed considerably in recent decades due to local and state vegetation protection laws
   and land use controls. A total of 584 hectares of remnant vegetation has been cleared post
   1997 (1% of the remnant vegetation extent). Clearing of non-remnant woody vegetation
   (regrowth vegetation and scattered trees) still occurs and is the main contributor of land
   clearing in Noosa. These values provide landscape connectivity, potential threatened
   ecological communities once mature, potential habitat trees and some threatened species
   habitat;
 Habitat fragmentation and development – from past broad-scale clearing and ongoing
   development, resulting in loss of connectivity, barriers to movement and habitat disturbance
   and loss for terrestrial and aquatic biodiversity;
 Degrading processes – such as erosion and sedimentation into waterways, increasing litter
   and declines in soil health;
 Changing fire regimes - including changes to the natural frequency and intensity of fires
   which can destroy ecological communities, alter recruitment patterns, and increase
   susceptibility to weeds. Specific vegetation communities at risk include rainforest and dry vine
   thickets, wet sclerophyll forests, heathlands and Melaleuca wetlands; and
 Conflicts between humans and wildlife – mostly around urban areas where there is more
   people and cars and domestic pets that attack wildlife. Also recreational use impacts from
   illegal or uncontrolled activities such as arson and off-trail access to national parks and
   reserves.




                                                                                    Page 38 of 81

Section 39

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


Biodiversity Mapping

As part of the Biodiversity Assessment Report, a mapping analysis was carried out to determine
conservation significance of areas of biodiversity across the Shire. This identified and mapped
the distribution of different biodiversity values, then individually scored these values, using equal
weighing for each value at each location. Cumulative biodiversity scores at each location were
derived by adding individual scores (up to a maximum value of 39). Weighting was then given to
important values such as threatened ecological communities, remnant vegetation, riparian
vegetation and threatened species habitat. Results showed that biodiversity values of highest
significance are associated with waterways, (Noosa River, Kin Kin Creek, Sandy Creek,
Cooroora Creek, Ringtail Creek and Six Mile Creek), protected reserves and the scattered
pockets of remnant vegetation through the inland rural band of Noosa. A detailed description of
this methodology is included in the assessment report.

This biodiversity values mapping will help inform the Biodiversity overlay mapping for the new
planning scheme, although further detailed analysis is required at the individual property level.

Corridor mapping was also completed to identify and analyse existing and potential connecting
vegetation and habitat across the landscape. Habitat nodes, patches and corridors were
identified including their degree of connectivity. This will be used for further identification and
prioritising of potential vegetation offset areas, environment levy acquisitions, community
partnerships and restoration projects. Corridor mapping once further developed, may also be
included in the new planning scheme to help direct revegetation efforts as part of the
development assessment process.

Future Conservation Priorities

The Assessment Report identifies key conservation priorities to help build on existing
conservation initiatives and achievements and to ensure a comprehensive system of
conservation management. These are:
1. Protecting and enhancing local and regional biodiversity values;
2. Building resilience ecosystems that can adapt to changes and risks overtime;
3. Maintaining and enhancing connectivity across the landscape for flora and fauna; and
4. Council working together with conservation groups, government, research agencies and the
   wider community to achieve great outcomes for the environment.

These priorities will be further explored as part of the development of the Environment Strategy
and Biodiversity Plan.

2.    Environment Strategy

Council’s policy framework has the Corporate Plan as the lead policy document - under which sit
the Social Strategy and Local Economic Plan and, once complete, the Environment Strategy and
Transport Strategy.

The Environment Strategy will provide the high level policy direction for environmental
management in Noosa Shire. The following plans will sit under this strategy:
 Biodiversity Conservation Plan (underway)
 Land Conservation Plan (underway)
 Noosa River Management Plan (not commenced)
 Pest Management Plan (complete and being implemented)
 Bushland Reserves Strategic Plan (underway)
                              

                                                                                     Page 39 of 81

Section 40

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


   Koala Conservation Plan/Policy (complete and being implemented)
   Climate Change Adaptation Plan
   Bushfire Management Plan
   Flood Management Plan (complete)
   Coastal Management Plan (not commenced)
   Waste Reduction and Recycling Plan (complete and being implemented)
   Emissions Reduction Policy/Plan (policy complete).

Scoping of the Environment Strategy has commenced and development of the strategy will occur
in the first 3 months of 2017.

Key elements of the strategy will include:
 Context and key issues for the Noosa environment;
 Relationship to Council’s Sustainability Principles and local, state and federal policy
   frameworks;
 Council’s role in environmental management, conservation and community partnerships;
 Environment ‘principles’ that this Council stands for and that are consistent with broader
   community views about the way Noosa’s environment should be managed and conserved;
 Key themes relevant to the environment such as Building Knowledge, Working Together,
   Being Innovative, and Building Resilience;
 Key directions for biodiversity conservation, waterways management, climate change
   adaptation, emissions and waste reduction, natural hazards management and coastal
   management;
 Key statements, initiatives and processes needed to support the new planning scheme,
   strategic and operational plans, ongoing implementation, monitoring and review; and
 Showcasing Council environmental programs and initiatives that highlight successful on-
   ground achievements and partnerships between Council and the community such as
   Council’s Environment Levy Land Acquisition Program and working with Bushcare and Coast
   Care Group volunteers.

The development of the strategy will include discussions with local and regional groups involved
in environment and natural resource management, as well as research institutions, state
agencies and other environment stakeholders, to draw common threads relevant to Noosa’s
future environmental management priorities.

From this targeted consultation, a discussion paper will be prepared to inform the community
about Council’s proposed approach and to seek comments and ideas on this. This feedback will
then enable the drafting the Environment Strategy and the Biodiversity Conservation Plan.

3.    Biodiversity Conservation Plan

This plan will provide the detailed policy direction and actions specific to biodiversity conservation
arising from the Biodiversity Assessment Report and Environment Strategy. The focus of the plan
will be on maintaining and enhancing local biodiversity values through Council custodianship and
partnership with the community.

The policy direction and specific actions in this plan will:
 form the foundation for biodiversity related policy and mapping within the new planning
   scheme
 inform Council’s acquisition program and community partnerships programs using the
   biodiversity values mapping and corridor mapping from the Biodiversity Assessment Report

                                                                                      Page 40 of 81

Section 41

GENERAL COMMITTEE MEETING AGENDA                                                        12 DECEMBER 2016


 identify priority projects and programs for future budgets and for partnering with the
   community
 give direction to the development of the Climate Change Adaptation Plan and Bushland
   Reserve Strategic Plan.

Previous Council Consideration

Nil.

Finance & Risk

The project has been resourced and funded through the Strategic Planning budget. The
Environment Strategy and Biodiversity Conservation Plan will continue to be developed with staff
from Environment Services and Strategic Planning.

Targeted and broader community consultation will help ensure these policy documents suitably
inform the community and align with community expectation.

Consultation

External Consultation - Community & Stakeholder

Targeted consultation with environment groups and stakeholders is planned to occur early in the
new year. Following this, broader community consultation on the discussion paper will be
organised via Council’s Your Say Noosa online feedback site.

Internal Consultation

Departments/Sections Consulted:

       Chief Executive Officer                    Community Services                 Corporate Services
       Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
       Executive Support                          Community Development              ICT
                                                  Libraries & Galleries              Procurement & Fleet
                                                  Local Laws                         Property & Facilities
                                                  Waste & Environmental Health       Revenue Services

       Executive Office                       X   Planning & Infrastructure
       Community Engagement                       Building & Plumbing Services
       Customer Service                           Civil Operations
       Economic Development                       Disaster Management
       Governance                                 Infrastructure Planning & Design
       Human Resources                        X   Planning & Environment
       Sustainability                         X   Strategic Land Use Planning




                                                                                                 Page 41 of 81

Section 42

GENERAL COMMITTEE MEETING AGENDA                                                   12 DECEMBER 2016


7                        AWARD OF TENDER 1516T043 WASTE MANAGEMENT CONTRACT 2017 - 2024
DOCUMENT INFORM AT ION




Author                           Manager Waste and Environmental Health, Wayne Schafer
                                 Community Services Department

Index                            ECM/ Subject/ Waste Contract – Development and Tender Process 2015-
                                 2017

Attachments                      1    Crowe Horwath Executive Summary - Probity Audit Report –
                                      Waste Management Contract Tender 2017- 2024.
                                 2    Food Waste Trial - Letter to Residents.
                                 3    AEC Group Ltd Letter – Outcomes from Waste Management
                                      Contract Assessment Review



EXECUTIVE SUMMARY
Background
This report outlines the tendering process and outcome for the new 7 year waste management
contract, including:
 the steps involved in the development of the tender documents;
 the release of tenders (in partnership with Local Buy Pty Ltd) for an 8 week period
   commencing 2 July 2016; and
 the tender assessment process.

Tender scope
Companies were invited to tender on any combination of the following 3 Separable Portions
contained in the tender documents:
1. Separable Portion A – Collection of Solid Waste;
2. Separable Portion B – Management of Eumundi Rd Landfill; and
3. Separable Portion C – Resource Recovery.

Tenders Received and Tender Evaluation
6 companies submitted tenders, with the assessment of the tenders undertaken by an internal
tender evaluation panel. Probity surrounding the tender was overseen by an independent Probity
Auditor (Crowe Horwath). The Probity Auditor attended the evaluation meetings, scoring of
tenders and subsequent negotiation meetings with selected tenderers.

Awarding of Tender and Innovations
The report recommends the awarding of the new 7 year waste management contract for all 3
Separable Portions to Cleanaway Pty Ltd. Cleanaway submitted the most advantageous tender
to Council, with their tender providing significant financial advantage for Council when compared
to the next best offer.

Innovations in the new Contract
The report expands upon a range of exciting innovations available through awarding of the
contract to Cleanaway, including:
 The ability to implement a new 3 bin collection service in the urban areas;
 Better recycling initiatives;

                                                                                         Page 42 of 81

Section 43

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


 Improved collection services for Hastings street;
 A greater range of bin sizes for waste and recycling;
 Improved landfill management;
 Recovering a greater range of materials at the Eumundi Road resource recovery facility; and
 Significant improvement in the recovery and reuse of items in the bulk kerbside collection
   service.
The contract also provides for Cleanaway to partner with Council in the development of recycled
materials for sale including blended soils and Australian standard compost.

RECOMMENDATION
That Council note the report by the Manager Waste and Environmental Health to the General
Committee Meeting dated 12 December 2016 regarding the new 7 year waste management
contract 2017 - 2024, and:
A    Award the Contract to Cleanaway Pty Ltd for performance of a Waste Management
     Contract 2017 – 2024 as detailed in tender documents under Separable Portions A, B, and
     C, for an initial period of 7 years (at an estimated contract value of $46 million)
     commencing on Monday 4 September 2017, and including the ability to award a first
     extension of contract for a period of two years and a further second extension of one year;
B    The awarding of the Contract being subject to Cleanaway Pty Ltd paying the specified
     Contract Performance Bonds for each Separable Portion A, B and C as detailed in the
     tender documents;
C    Accept the option provided in the tender documents for the introduction of a 3 bin waste
     collection service to single unit domestic dwellings in the urban areas to include a third bin
     for garden waste from September 2017 as detailed in the tender documents, Part E
     Annexure 1, Schedule 1 “10 Maps detailing the external boundaries of Township Areas”
D    Agree to the continued provision of an optional garden waste collection service to
     commercial and multi-unit domestic premises and other premises within 5 kilometres of the
     identified urban garden waste service area;
E    Request that staff develop a Policy for the provision of the garden waste service and report
     to a future meeting of Council;
F    Engage King and Company to finalise the relevant contractual documents including
     amendments resulting from contract negotiations and agreed contract departures, for
     signing by the successful tenderer.



REPORT
The purpose of this report is to present to Council outcomes of tender 1516T043 Waste
Management Contract 2017-2024, commencing on 4 September 2017. The initial contract period
is 7 years, with an option for a first 2 year extension to 2026 and a second extension of an
additional one year to 2027.

This report recommends the prompt acceptance of a successful tenderer to ensure that sufficient
time is available for the successful contractor to mobilise the required plant, equipment and staff
resources to facilitate a smooth transition to the next contract.




                                                                                    Page 43 of 81

Section 44

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


Establishment of a Project Control Group and Tender Evaluation team
Early in 2016 the CEO established a waste contract project control group (WCPCG) to oversee
the development, letting and finalisation of the waste management contract. The WCPCG
subsequently established a tender evaluation team consisting of the Manager Waste and
Environmental Health, Coordinator Waste and Council’s Procurement and Contract Advisor.

Development of the Tender Documents
Draft tender documents were developed by the Manager Waste and Environmental Health in
consultation with waste management staff and the WCPCG. The draft documents were then
referred to King and Company legal services for review and amendment to ensure that the tender
and contract documents complied with contract law requirements, workplace health and safety
obligations and the specifications were consistent with achievable contractual outcomes without
disadvantage to Council.

Objectives of new Waste Management Contract 2017- 2024
The major objectives considered in preparing for the new contract were:
 Expanding existing waste collection and disposal services to achieve the objectives of the
   “Noosa Waste Reduction and Recycling Plan 2016-2024”;
 Inclusion of those recommendations of the Community Jury (the future for Noosa's organic
   waste) that were adopted by Council;
 Finding an acceptable solution to Hastings Street waste collection issues (noise, public
   safety, improved recycling);
 Improving public place recycling and better recycling capacity for commercial premises;
 Improving the ‘Kerbside’ bulk waste collection service;
 Ensuring a smooth transition from the current contract to the next contract to avoid
   community and business disruption;
 Maximise the use of airspace in the landfill through diversion of waste and maximising
   compaction of buried waste; and
 Ensuring a high level of probity surrounding the tendering process.

Noosa / Local Buy Pty Ltd Alliance
As part of its alliance arrangement, Council and Local Buy Pty Ltd (an LGAQ subsidiary)
negotiated to include the new waste management contract under the alliance umbrella of
contracts (with the new contract considered a Local Buy Pty Ltd contract). The tendering process
was managed by Council, with financial and administrative support provided by Local Buy Pty
Ltd. Ongoing administration support for the life of the contract will also be provided by Local Buy
Pty Ltd as part of the arrangement.

Summary of the Letting of Tenders
Tenders were uploaded to LG Tender Box on Friday 1 July 2016 and advertised in both the
Courier Mail and Sunshine Coast Daily on Saturday 2 July 2016. Tenders closed at 2pm on
Tuesday 30 August 2016 after an 8 week tendering period. No tenderer asked for additional time
to prepare their tenders.

During the tender period the Manager Waste and Environmental Health conducted a tender
briefing session for prospective tenderers, in addition to organising 2 inspections of Council’s
waste disposal and processing facilities.




                                                                                    Page 44 of 81

Section 45

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


A total of 39 written tender queries were received from prospective tenderers and answered
during the tendering period. Some tenderers requested clarifications of the tender specifications
and others wanted to obtain additional data for preparation of their tender pricing. This number of
enquiries is considered normal for a complex waste management contract involving solid waste
collection, landfilling and resource recovery services.

Probity Management
Crowe Horwath Australasia was selected as the probity auditor for the tender process and
provided guidance, advice and assistance throughout the tender process. The probity auditor
was specifically involved in the following processes:
 Development of the probity plan and procurement plan;
 Oversight of the confidentiality declarations by staff involved in the tender;
 Held meetings with key staff to explain their confidentiality obligations;
 Attendance at the tender briefing session for tenderers held on 19 July and the inspection of
   landfill, transfer stations and the resource recovery facility;
 Tender opening from the LG Tender Box secure online system;
 Attendance at the tender scoring sessions by the evaluation team;
 Review of the scoring spreadsheets for correctness;
 Attendance at the tender negotiation meetings ;
 Provision of a “Probity Audit Report – Waste Management Contract Tender 2017-2024”

The executive summary from the auditor’s report has been included as Attachment 1 to this
report. There were no ‘substantial’ departures from the probity plan during the tender project.

Introduction of 3 bin Service (Waste, Recycling, Garden Waste) to Single Domestic
Premises
Part 2A Section 7 of the Waste Reduction and Recycling Regulations 2011 “DESIGNATION OF
AREAS BY LOCAL GOVERNMENTS FOR GENERAL OR GREEN WASTE COLLECTION”
prescribes:

Designation of areas
A local Government may –
(a) By resolution, designate areas within its local government area in which the local
      government may conduct general waste or green waste collections: and
(b) Decide the frequency of general waste or green waste collection in the designated areas.

A note is attached to the end of Section 7 in the legislation indicating that if a local government
conducts a green waste service as a significant business activity, (Council’s waste management
activities are in fact a significant business activity) the requirements of the Local Government Act
in relation to business reform and competitive neutrality apply.

Concerns regarding Council conducting potential anticompetitive behaviour in introducing a 3 bin
service (including a fortnightly garden waste service) to single domestic dwellings in urban areas
were raised. The introduction of a garden waste service has the potential to negatively impact
those engaged in the provision of similar services, (i.e. gardeners removing garden waste from
premises as part of a paid provided service may lose business). To assess the risk associated
with this issue staff sought legal advice from King and Company, who advised it would be
prudent for Council to seek the opinion of the Australian Competition and Consumer Commission
(ACCC) prior to any introduction of the 3 bin service.



                                                                                     Page 45 of 81

Section 46

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


Staff engaged AEC Group Pty Ltd to compile and present a report to the ACCC on Council’s
behalf regarding the proposal for the introduction of the compulsory 3 bin service to domestic
premises. The process included seeking comment from gardeners engaged in providing this
service now and the potential impact on their business due to the introduction of the garden
waste bin.

Advice was received from the ACCC that it was not clear that the introduction of a 3 bin system
would in itself breach the competition provisions of the Competition and Consumer Act (CCA),
and that if it did so both authorisation and notification would be formally required to provide
protection to Council from legal action for certain conduct that may breach the competition
provisions of the CCA where the public benefits from the conduct will outweigh the public
detriment .The ACCC also advised that Council could maintain a certain level of competition
within the 3 bin service to mitigate the impact on local competitors to largely maintain the viability
of those business operators.

To mitigate the risk of anti-competitive behaviour and minimise the impact on local businesses an
undertaking has been given to gardeners and to the ACCC that Council would not mandate the
third garden waste bin for unit complexes, or where the owner of a single dwelling employed a
service to remove garden waste. (which achieves the same objective as the garden waste
collection service).

King and Company also raised the issue of the number of recycling bins allowed under current
legislation. This matter was referred to the Department of Environment and Heritage Protection
(DEHP), recommending that the legislation be amended as suggested by King and Company.
The Department has a different opinion to King and Company and believes that Council is within
its lawful rights to implement a 3 bin service to include a garden waste recycling service. Based
on the Department’s advice staff believe that the risks associated with proceeding with a 3 bin
service are minimal.

Trial - Inclusion of Limited Food Waste in the Optional Garden Waste Bin
During the tender period a trial was undertaken by approximately 1,000 properties whereby a
limited volume of vegetable and fruit waste was included in their existing optional garden waste
bin service. This was to determine if there was capacity to include a limited range of food waste
in the fortnightly collection service without creating a nuisance from fly breeding, odour or other
objectionable outcomes. Results of the trial indicate that the proposal could reduce some organic
waste going to landfill, and it is considered worthwhile to give further consideration to extending
the limited inclusion of food to the whole community in the new contract. Further trialling during
the current contract is proposed.

The inclusion of this limited food waste will remove some organic loading from the landfill and at
the same time impose no additional cost to the community, compared to the cost of a garden
waste service without the inclusion of limited food waste. This goes part way to meeting the
Community Jury’s recommendation to implement a full weekly organic waste service, but does
not impose the significant additional cost of a waste processing facility required if a full organic
waste service was implemented. A copy of the flyer that was distributed to residents is included
as Attachment 2 to this report.

Invitation to tender
Tenders were invited for 3 separable portions of the waste management contract to ensure the
best available outcome could be achieved for Council. Tenderers were invited to tender on one
two or all three Separable Portions in any combination.

Separable Portion A – Solid Waste Collection;
Separable Portion B – Management of Eumundi Rd Landfill; and
Separable Portion C – Resource Recovery.

                                                                                      Page 46 of 81

Section 47

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


Tenderers were also invited to nominate a discount on their tendered price if Council accepted:
   Two separable portions offered;
   All separable portions offered;
   A first 2-year extension of the contract after the initial 7 year term; and
   A second 1-year extension of the contract after the first 2 year extension.

Summary of Tenders Received
Tenders were received from six companies. The following table identifies the tender offers
received.

                                          JJ
   Portion           Cleanaway                        Remondis   SUEZ Pty     URM Pty      Veolia Pty
                                       Richards
 Combinations          Pty Ltd                         Pty Ltd     Ltd          Ltd           Ltd
                                        Pty Ltd
Portion A -
Solid Waste                              YES            YES        YES             YES        YES
Collection
Portion B -
Operation of                             YES            YES        YES                        YES
Eumundi Road
Landfill
Portion C -
Resource                                 YES            YES        YES                        YES
Recovery
Portion A +
Portion B +                              YES            YES        YES                        YES
Portion C
ABC Combined
Offer (cannot be         YES                                                                  YES
separated)
Portions A+B                             YES            YES        YES                        YES
Portions A+C                             YES            YES        YES                        YES
Portions B+C                             YES            YES                                   YES
                         YES             YES                                                  YES

                    Alt Offer (1) –   Alt Offer (1)                                        Alt Offer (1)
                        Second         – Second                                             – Portions
                         Hand             Hand                                                A+BC
                     equipment        equipment
Alternative           Portion A       Portions B
Tenders Offered                          and C
                    Alt Offer (2) –
                        Second
                         Hand
                     equipment
                      Portion B




                                                                                         Page 47 of 81

Section 48

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


Alternative (Non-Conforming) Tenders
1. Cleanaway alternative tenders 1 and 2 proposed a small reduction in price via the use of
   existing collection vehicles and landfill plant.
2. JJ Richards alternative tenders proposed the use of second hand plant for B and C.
3. Veolia A+BC offer proposed a combined price for BC as a lump sum offer. This was later
   clarified and priced in accordance with the tender specifications and was then considered a
   conforming tender.

The alternative non-conforming offers by Cleanaway and JJ Richards were reviewed as part of
the tender evaluation. However as previous waste management contracts have run for a period
of up to 10 years, the cost savings of using second hand equipment when compared to the risks
associated with contract performance and visual appearance of second hand plant were deemed
excessive to offset the limited financial advantage associated with these alternatives. A decision
was made by the evaluation team not to accept or evaluate the Cleanaway or JJ Richards
alternatives.

Combined ABC Tender Offers
Cleanaway and Veolia submitted a Tender for a Combined ABC Contract with no provision for
Council to accept any one Separate Portion. (Veolia also submitted a tender for each Separable
Portion). The combined ABC tenders offer the advantage to Council of managing only one
contractor, compared to dealing with 3 individual contractors if contracts were let for each of the
three separable portions. The combined ABC offers also provide cost savings through sharing
equipment across each separable portion.

Tender Evaluation Process
As a result of the number of tender variations received the tender evaluation team developed a
seven stage process to ensure that all potential contract permutations (as per the previous table)
were properly evaluated. This process is outlined below.

Stage 1 – Each Separable Portions scored individually – non price scoring

Tenders for individual separable portions were initially scored on a range of non-price evaluation
criteria that had been identified in the tender documentation and referee checks with local
governments where the tenderers currently operate a contracted service. The Probity Auditor
attended and guided the evaluation and scoring to ensure there was no bias in the scoring. The
non-price portion of the scoring amounted to 65% of the total score.

Stage 2 – Price scoring added to each Separable Portions

A score of up to 35% for price was then added to the non-price score to obtain a final score for
each Separable Portion. If discounts were offered by tenderers they were applied during this
process.

Stage 3 – Selecting the best offer A+B+C

The most advantageous tenders for each separable portion were then reviewed to find the best
offer for Council. The best offer was found to be the individual offers by Veolia for A+B+C.

Stage 4 – Scoring of Combination offers (e.g. A+BC)

The various combinations of offers were then scored to find the best of the combinations of
separable portions offered, as some offers provided a substantial discount if more than 1 portion
was accepted. The best combination offer was from Veolia A+BC combined, which was better
than the A+B+C offer by Veolia.
                                                                                    Page 48 of 81

Section 49

GENERAL COMMITTEE MEETING AGENDA                                               12 DECEMBER 2016


Stage 5 – Scoring of ABC offers – (all Separable Portion Grouped together).

Two companies - Cleanaway and Veolia provided a combined ABC offer, (i.e. the offers were a
group offer of all separable portions which could not be separated. The offer by Cleanaway (the
only offer made by that company), was the best offer in the group, both in scoring of non-price
criteria and including price in the scoring. Cleanaway did not offer a financial discount on their
offer advising they had tendered their best price for their combined ABC offer. Veolia offered a
lump sum discount on their ABC offer. This discount was included in the financial evaluations.

Stage 6 – Determining the most advantageous tender for Council.

To ensure that the Cleanaway ABC offer was the most advantageous offer to Council overall, the
ABC offer provided by Cleanaway was then compared to:
 The best offer found in Stage 3, (where the best combinations of offers for each of the
   portions A+B+C had identified Veolia as the preferred tenderer);
 The best offer of combinations of offers in Stage 4 – the Veolia A+BC offer; and
 The Veolia ABC offer, (which is a better offer than the A+B+C offer by Veolia).

In the final analysis the combined ABC offer by Cleanaway was evaluated as the best offer both
from a non-price perspective and when price was taken into consideration. The Cleanaway offer
provides a total annual price differential of approximately $1.5 million over the next best offer (the
Veolia A+BC offer).

Stage 7 – Negotiations with shortlisted tenderers

The tender evaluation team held an evaluation meeting on Friday 11th November 2016 with
Cleanaway and Veolia as the two shortlisted tenderers to discuss and refine their submissions
and to endeavour to resolve areas of concern for Council in the offers made. The negotiations did
not change the evaluation team’s recommendation regarding the successful tenderer. Negotiated
contract enhancements will be included in the final contract documents where necessary
following further discussions between Council’s legal representatives and the contractor.

Given the large scale of the contract requirements, most tenderers submitted a Schedule of
Departures detailing where they could not comply, or were not prepared to comply fully with the
tender or contract requirements. Some of these departures are unacceptable to Council and
were the subject of the tender negotiation meeting on 11th November 2016 to present Councils
preferred outcome.

Proposed Successful Tenderer
The tender evaluation team recommends awarding a contract to Cleanaway Pty Ltd for their
combined ABC offer as the most advantageous offer to Council. Awarding the combined contract
to Cleanaway also provides the following advantages:
 The appointment of a single contractor for all 3 separable portions will limit the potential for
   conflicts between contractors that may arise on the landfill / resource recovery site if separate
   contractors were to occupy the area. It also limits potential conflicts between the waste
   collection contactor delivering waste for disposal or resource recovery.
 One contractor is responsible for the whole chain of custody of waste – collection, resource
   recovery, disposal thereby enhancing the opportunities to be creative with waste and
   resources.




                                                                                      Page 49 of 81

Section 50

GENERAL COMMITTEE MEETING AGENDA                                                 12 DECEMBER 2016


 Cleanaway are the incumbent contractor and have a good performance track record in Noosa
   which means the transition from the current contract to the new contract should be relatively
   seamless.
 Cleanaway have experience in the Noosa garden waste collection service and will be able to
   smoothly transition to the 3 bin service without significant impact on the community or
   businesses.
 Cleanaway have agreed to include limited food waste in the garden waste bin without
   increasing their tendered price.
 The Cleanaway tender offers other innovations identified elsewhere in this report.

Financial Evaluation by AEC Group Ltd
The scores and pricing summaries were then forwarded to AEC Group Ltd to review any trends
in the rise and fall formula or shire growth which would influence the proposal to engage
Cleanaway as the preferred tenderer. A copy of the summary by AEC is attached to this report as
Attachment 3. The information provided indicates that there is no anticipated influence over the
term of the contract that would change the recommendation for awarding the contract as
proposed in this report.

Zero Emission Initiatives
Waste vehicles consume a significant amount of diesel in the performance of the waste collection
service. Given Councils pursuit of Zero Emissions a significant effort was given to reducing the
impact of diesel consumption within the waste collection fleet. The following potential alternative
sources of powering the waste collection vehicles and the outcomes of the investigation are
detailed below.
 Electric Power – The weight of the vehicles plus payload, terrain and requirement to
   recharge the batteries means this is not currently a solution for waste collection vehicles. It is
   only viable for smaller vehicles with short travel distances.
 Biodiesel B20 – is a potential fuel source that is available and can be used in the collection
   fleet. During tender negotiations the use of B20 was discussed with two tenderers shortlisted
   for negotiations. Waste collection vehicles operate under full acceleration and deceleration
   and have significantly different operational patterns of wear and tear to other vehicles used
   for long haulage on highways.
      Manufacturers are not prepared to warrant the motors in the collection vehicles proposed to
      be used in the Noosa contract if they use B20.
      The frequency of maintenance of the vehicles is shortened and costs are increased.
      Diesel consumption per 100km is increased by 3%.
      There may be a slight but not significant loss of power using this fuel.
      The quality of B20 can fluctuate significantly from current suppliers and can result in damage
      to engines.
      The waste fleet performs an essential service and potential breaks in continuity of service
      were seen as a significant risk by all contractors during negotiations.
      None of the tenderers were openly prepared to risk using B20.
 Biodiesel B100 – similar comments relate to B100 as for B20. However, there is a greater
   risk of using B100 as trucks cannot revert back to diesel without a complete retrofitting of
   engine seals and filters etc. Contractors were not prepared to risk losing the warranty on
   engines used in the collection fleet by using this fuel.
                                  


                                                                                      Page 50 of 81

Section 51

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


 Landfill Gas (refined) – LMS currently hold the Council contract for extracting gas and
   flaring it to the atmosphere, primarily to convert methane to carbon dioxide as a greenhouse
   gas initiative. They have provided the entire infrastructure at no cost to Council and own the
   rights to the gas. They obtain revenue from carbon credits with a small financial return to
   Council. During the tendering period, Intelligas negotiated with LMS to secure a portion of the
   landfill gas to power collection vehicles. The technology to power collection vehicles is
   available and Cleanaway were prepared to seriously consider using this gas if it could be
   secured. However, the negotiations were unsuccessful as LMS would not release the landfill
   gas to Intelligas. LMS are pursuing generation of electricity as a long term business initiative.
   Carbon credits are not available to LMS through powering collection vehicles with landfill gas.
   This information was also tested by contacting another landfill gas company. They advised
   that if they owned the landfill gas they would not use it to power collection vehicles as the
   revenue return is much greater through generation of electricity. Regretfully the outcome of
   powering collection vehicles with landfill gas is not available.

Improvements in the next Waste Management Contract
The new contract offers some exciting improvements in the performance of waste management
services. These improvements are summarised below.

Portion A – Solid Waste Collection Services
 Introduction of a 3 wheelie bin service (waste, recycling and garden waste) to an additional
   9,000 residents in single unit dwellings in the urban area. This will increase the current
   service level from about 4,500 collections per fortnight to approximately 14,000 services,
   while retaining the current optional service to commercial, multi residential and rural
   premises.
 Cleanaway agreed during negotiations to perform the kerbside bulk waste collection service
   utilising 3 separate collection vehicles to collect:
   o Recyclable metals;
   o   Reusable items (without compaction to prevent them being crushed and rendered useless
       by the compactor); and
   o   General waste, transported to the resource recovery facility for further processing and
       recovery of residual recyclable material before landfilling.
 Some comingled recyclables collected in recycling vehicles will be delivered to the Eumundi
   Road Resource Recovery Facility and bulked up in a large bin before delivery to the
   Recycling facility at Bli Bli. This offers a cost saving and facilitates the provision of weekend
   recycling collections.
 A new bulk cardboard bin service using 3m3 and 4.5m3 bins will be offered to commercial
   customers.
 Cardboard delivered to the waste transfer station will be compacted and delivered to the
   Kunda Park bulk cardboard receiving facility. Council will be paid for the cardboard with 30%
   to the contractor. At the present time there is no revenue stream from this product.
 The current bulk recycling bins are limited to one size (1.1m 3) capacity. The range of bulk
   recycling bins will be increased to include 2m3 and 3m3 recycling bins for larger commercial
   premises.
 New 360 litre wheelie bins will be made available to the public for recycling, garden and
   waste services as an additional option to the 240 litre wheelie bins currently provided.
 Recycling service frequency for Council public place bins and commercial premises in high
   profile areas will be increased from weekly to 3 times per week.
 The contractor will provide an events waste and recycling service with an introduced
   capability to provide weekend recycling services.


                                                                                     Page 51 of 81

Section 52

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


 A street litter bin cleaning program will be implemented with on board washing of bins into the
   waste collection vehicle, ensuring bins are washed immediately after service. Bins will be
   washed at a frequency nominated by Council dependent upon location and usage patterns.
 A GPS location will be identified for each street litter bin and bins bar coded. The contractor
   will swipe the bar code to certify the bin has been collected allowing development of KPI’s for
   servicing these bins, ensuring contractor performance and bin washing frequency.
 A single pass waste collection vehicle will be provided to service Hastings Street and other
   high use or congested areas. This vehicle is capable of collecting waste and recycling bins in
   2 separate compartments on the vehicle in one pass. This avoids using two separate vehicles
   with substantial improvement in reduced noise and traffic congestion and public safety.
 The contractor has agreed to accept a limited volume of non-putrescible food organics with
   the garden waste service if Council trials find this service can be implemented without
   nuisance from odour and fly breeding.
 Collection vehicles will be fitted with GPS location devices and linked to a web portal back at
   Council to facilitate communication about service levels, missed services, updating Council’s
   rating database with accurate bin servicing details.
 Trucks will be fitted with the latest on board computer systems to enable the driver to “at the
   press of a button” record a range of servicing issues that can be reported directly back to
   Council.
 Trucks livery will be painted in an approved attractive colour scheme to promote the Council
   and its waste and recycling aspirations.
 The Contractor has offered to pay $12,000 annually towards the cost of the current waste
   education officer without an increase in the tendered prices submitted. The current officer is
   engaged for 50% of their time – this offer would assist Council to increase the education
   component.

Portion B – Operation of Eumundi Road Landfill
 A larger landfill compactor will be employed on the landfill to increase compaction without
   significant additional cost. The requirement for the compaction of waste buried on the landfill
   has been increased from 850kg/m3 in the current contract to 900kg/m3 to improve the use of
   air space at the landfill and extend its useful life. Substantial penalties apply in the new
   contract for failure to achieve the required compaction rate.
 Option to use roll out covers at the end of each day to cover waste instead of covering the
   waste with soil. This will reduce the consumption of landfill space with soil, increase its useful
   life and enable the use of the soil for value adding to organic waste. This requires further
   research.
 Final Capping of completed areas of the landfill to best practice standards at the tendered
   rates with Council having the option of seeking external competing tenders for capping to
   ensure value for money in the contractor prices.

Portion C – Resource Recovery
 The contractor will revise the layout of the resource recovery facility where waste is sorted
   and segregated to improve the recycling operations.
 The sorting of waste (in addition to the current range of products sorted), may include hard
   and soft plastics such as plastic car bumper bars, pvc pipe, polystyrene and foam rubber from
   deconstructed mattresses.
 The contractor has offered a bailer to assist in the processing of products.
 The contractor will assist Council in marketing its segregated recyclable material using
   existing agreements at a national level.



                                                                                      Page 52 of 81

Section 53

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


 Financial incentives are available to the contractor if they negotiate improvements in the
   marketing of recovered material. (This is intended to facilitate the movement of surplus
   stockpiles of recycled material at the resource recovery facility).
 Agreement has been negotiated for the contractor to work with Council to develop two new
   retail products, blended soil and Australian Standard compost, for sale to the public. The
   revenue returned from sales will be used to offset the costs of production with surplus
   revenue shared between Council and contractor.

Previous Council Consideration

Nil.

Finance & Risk

The waste management contract has historically been let for a 7 year period together with
optional extensions, often taking the contract period to 10 years. It is the largest contract entered
into by the Council, and as such presents a number of significant risks to Council, which are
summarised below:

Portion A Collections
 Ensuring the implementation of the 3 bin service does not result in anticompetitive behaviour.
 Failure to pay the Security Bond.
 Financial failure of the contractor resulting in serious disruption to an essential waste
   collection service in the community.
 If a non performing contractor is engaged the impact on Council can be significant with
   respect to damage to both reputation and also established relationships with the community.

Portion B Landfill
 An underperforming contractor on the landfill and resource recovery facility can expose
   Council to significant penalties under environmental legislation.
 As holder of the Environmental Authority (Licence) with EPA, Council is exposed to significant
   financial risks for breach of conditions and harm to its environmental credentials.
 Poor operational performance on the landfill (under compaction of waste) also results in
   consumption of valuable landfill air space, reducing the life of the landfill.

Portion C
 The objectives of Council’s Waste Reduction and Waste Minimisation Plan 2016-2024”
   cannot be achieved.
 The range of materials recycled is not able to be sold as markets are not available.

Performance Bond Held to Reduce Risk

The contract provides for Council to hold a substantial performance bond on each of the
separable portions.
 For Separable Portion A - $1,000,000;
 For Separable Portion B - $750,000; and
 For Separable Portion C - $200,000.
This bond is available to Council if the contractor defaults on the provision of services. If all or
any portion of the bond is used during the term the Contractor is required to immediately replace
the amount used to maintain the available bond as detailed above.
                                                                                     Page 53 of 81

Section 54

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016


Bankers Undertaking – from the Contractors Bank providing assurance that the tenderer can
undertake the financial commitments of the Contract.

AEC Group Ltd also undertook a review of the contractor’s financial capacity to undertake the
contract with risk levels deemed acceptable.

Consultation

External Consultation - Community & Stakeholder

During the development of the Waste Management Tender the following external consultation
was undertaken.
 Noosa Community Jury – as a preliminary step in preparation for the next contract the
   Community Jury was engaged to review the question, “How does Council reduce organic
   waste to landfill” and recommendations made to Council.
 Department of Environment and Heritage Protection – Requested for advice on the legalities
   of the additional garden waste service.
 Ian Christensen – Consultancy regarding the impact of including a garden waste service at
   unit accommodation.
 Unitywater - Investigation of opportunities to reduce carbon and work jointly with Council to
   promote waste diversion and treatment of organic waste.
 Intelligas – Investigating the potential use of Landfill Gas as a source of power for waste
   collection vehicles.
 King and Company – Legal advice on the tender documents and draft contract.
 Local Buy Pty Ltd – Provided technical support in the development of tender documents and
   financial support for the engagement of Probity Auditor, Legal Advice from King and
   Company, tender advertising and facilitated the letting of tenders through the Local Buy
   procurement system.
 Crowe Horwath – Provided probity auditor services for the tendering process.
 Rolfe Perry and Associates Pty Ltd – Conducted an audit and reporting on the volume of food
   waste in the garden waste bins during the limited food waste trial in October/November 2016.
 AEC Group Ltd – Preparation of a submission to the ACCC regarding the proposed additional
   garden waste service seeking an opinion on anti-competitive behaviour by Council, if it
   implemented the proposed Garden Waste Service.
 AEC Group Ltd – Review of the tender scoring and financial analysis of the results to ensure
   that the factors included in the tender for rise and fall over the 7 year period (fuel and oil,
   labour price and Consumer Price index do not change the relativity of tender scores over the
   term of the Contract that would make a difference to the recommendation.
 Ipswich City Council – Discussions on their limited food waste included in the optional
   fortnightly garden waste service under taken by Ipswich City Council. They have similar
   experience to Noosa and have allowed the limited inclusion of non-putrescible food waste in
   their fortnightly garden waste bin for 12,000 residents. They use ventilated bins for garden
   waste with an air hole in the lid. Their garden waste is sent to a composting facility rather than
   simple mulching.
 Preliminary negotiations with Kunda Park cardboard recycling facility and verbal agreement to
   accept delivered cardboard from Noosa Council. There will need to be a formal agreement
   when the successful contract or is known. The proposal was also discussed with Visy
   Recycling who verbally supported the proposal as bulk cardboard creates operational
   difficulties with the MRF operation at Bli Bli.




                                                                                     Page 54 of 81

Section 55

GENERAL COMMITTEE MEETING AGENDA                                                         12 DECEMBER 2016


Internal Consultation

The Waste Contract Project Control Group have guided the project throughout the course of the
tender preparation, the letting of tenders and the evaluation of the tenders submitted. The group
comprised:
 Director Community Services;
 Director Corporate Services;
 Procurement and Fleet Manager ;
 Manager Waste and Environmental Health;
 Waste Coordinator;
 Governance Advisor; and
 Procurement/ Contracts Advisor.

Given the significance of the Contract, other internal discussion has been strictly limited to avoid
any potential breach of confidentially and probity in the tendering and evaluation process.

Departments/Sections Consulted:

X   Chief Executive Officer                X   Community Services                 X   Corporate Services
    Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
    Executive Support                          Community Development                  ICT
                                               Libraries & Galleries                  Procurement & Fleet
                                               Local Laws                             Property & Facilities
                                           x   Waste & Environmental Health           Revenue Services

    Executive Office                           Planning & Infrastructure
    Community Engagement                       Building & Plumbing Services
    Customer Service                           Civil Operations
    Economic Development                       Disaster Management
    Governance                                 Infrastructure Planning & Design
    Human Resources                            Planning & Environment
    Sustainability                             Strategic Land Use Planning




                                                                                                  Page 55 of 81

Section 56

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016


                                     ATTACHMENT 1




                                        Page 56 of 81

GENERAL COMMITTEE MEETING AGENDA                                                         12 DECEMBER 2016

          :,                                                                                 ATTACHMENT 1
        ««     Crowe Horwath.

       1.1.   Introduction

       Crowe Horwath was engaged by Noosa Council to perform Probity Auditor Agreed Upon Procedures (Probity
       Audit) over the Noosa Council Waste Management 2017-2024 tender processes. This report documents the
       findings identified from performing the Probity Audit services at Noosa Council during the period 1 July to
       1 December 2016.

       The Crowe Horwath team would like to acknowledge the assistance provided by Noosa Council personnel
       during the course of the Probity Audit. Noosa Council Management and staff displayed a willingness to
       identify improvements in their processes and were receptive of any feedback provided throughout the Probity
       Audit.
       1.2   Objective
       The objective of the Independent Probity Auditor Agreed Upon Procedures was to:
                 »  Ensure that Noosa Council conforms with processes designed to achieve value for money;
                   Check that there is accountability through all stages of the procurement process;
                 *  Ensure that all bids are assessed and evaluated using the same criteria;
                 *  Preserve public and bidder confidence in Noosa Council processes; and
                 >  Improve defensibility of decisions to potential legal challenges or other external scrutiny.
       In addition to the Probity Audit Agreed Upon Procedures, detailed in Appendix 2, we have provided Probity
       Advisory services to assist Noosa Council in relation to:
                 »  Developing the Waste Management Contract Probity Plan;
                 * The performance of probity briefing sessions for Noosa Council staff; and
                 « Assistance to the Project Leader throughout the Waste Management Contract procurement
                   process.
       A detailed listing of the Probity Advisory services is detailed in Appendix 2.
       We conducted the engagement in accordance with Standard or Related Services ASRS 4400 — Agreed
       Upon Procedures Engagements to Report Factual Findings. This standard requires that we comply with
       ethical requirements equivalent to other assurance engagements, including independence, and plan and
       perform the agreed procedures to obtain factual findings.
       1.3   Current Status of the Tender
       At the conclusion of the Probity Audit services, the Waste Management Contract tender had proceeded to
       the point of a report to Council being prepared detailing the evaluation team’s recommended outcome. This
       report is due to be presented to Council in the General Committee meeting planned for 12 December 2016.
       1.4   Overall Probity Assessment
       Our overall assessment of the Waste Management 2017-2024 tender processes identified the following:
        * The tender was undertaken in a manner that complies with Noosa Council procurement policy and the
          established Probity Plan;
       -  All tenderers were given equal opportunity and were treated fairly and consistently; and

       The relationship you can count.on                                                       st       Se         o

                                                                                                  Page 56 of 81

Section 57

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 57 of 81

GENERAL COMMITTEE MEETING AGENDA                                                           12 DECEMBER 2016

       »—      Crowe Horwath.

       *  The tender evaluation process was undertaken in a manner free of bias and the ranking is a true
          representation of the tenderers offers.
       1.5   Scope
       We performed Agreed Upon Procedures in accordance with the scope included as Appendix 1 to this report.

       A summary of the scope elements reviewed and findings identified is included in the table below:

        Scope Element                                                                     Findings Identified
        Review Project / Tender Documentation                                            -
        Probity Plan                                                                      1
        Physical Security and Risk Management                                            -
        Confidentiality and Conflicts of Interest                                        -
        Timeframes and Briefing Sessions                                                 2
        Procurement Method / Approach to Market                                          -
        Supplier Briefings                                                               -
        Evaluation Criteria                                                              3; 4,5

       1.6   Exclusions

       The probity audit was restricted to the performance of the Agreed Upon Procedures outlined in Appendix 2
       and did not cover the following:
       «  The actual evaluations of tenders and / or proposals (other than observation of these processes); and
       =  Any legal undertakings if probity was breached or conflicts exist.
       1.7   Limitations

       The scope of our work was subject to the following limitations:
       =  The Probity Auditor services have only covered the Waste Management 2017-2024 tender processes up
          to the report to Council setting out the evaluation results and the evaluation team’s recommended
          outcome. The scope of work has not included consideration of post evaluation processes such as
          recommendation approval, contract finalisation, final contract awards and unsuccessful offeror briefings.
       *  The Probity Auditor services have not provided assurance or advice on the technical content or
          appropriateness of service design or specifications of the Waste Management 2017-2024 tender
          processes.
       1.8   Summary of Findings
       A number of findings, summarised below, were identified during the performance of the Probity Auditor
       services. In each case, recommendations raised were actioned by Council Management in a timely manner
       and to the satisfaction of the Probity Auditor:
       ©  Finding 1 — Revisions to Draft Probity Plan: A number of revisions were proposed to Council's draft
          Probity Plan. These revisions were accepted by Council Management and implemented prior to the
          release of tender documents to the market. Additionally, probity briefing sessions were held with Council
          staff and prospective tenderers and a memo on probity considerations was issued to Councillors.

      The relationship you can count on                                                      ee            S22 ae

                                                                                                   Page 57 of 81

Section 58

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 58 of 81

GENERAL COMMITTEE MEETING AGENDA                                                           12 DECEMBER 2016

       y       Crowe Horwath..

       »  Finding 2 — Attendance at Briefing Session: One (1) prospective tenderer had more than the allowed
          number of attendees at the briefing session.  At the point Council became aware of this, the Probity
          Auditor asked the prospective tenderer to have their extra attendees leave the briefing session. As these
          representatives had attended a site visit, all other prospective tenderers were offered the opportunity for
          an additional two (2) members of their organisation to undertake a site tour.
       «  Finding 3 — Scoring sheet Template Calculation Errors: Calculation errors were identified in the
          scoring sheet template prepared by Council. These errors were corrected prior to the commencement of
          the tender evaluation process,
       »  Finding 4 - Approach to Referee Interviews: The Probity Auditor provided recommendations to
          Council on the manner in which to perform referee interviews to ensure consistency in approach. This
          included developing a standardised set of questions and having the interviews completed by a staff
          member not included in the evaluation team. These recommendations were accepted by Council.
       «  Finding 5 - Evaluation Meetings with Short Listed Tenderers: The Probity Auditor provided
          recommendations to Council on the manner in which to undertaken negotiation meetings with shortlisted
          tenderers,  This included having the Probity Auditor attend the meetings as an independent observer.
          These recommendations were accepted by Council.

       A detailed listing of all Agreed Upon Procedures performed and Findings identified are included in
       Appendix 2 to this report.
       1.9   Basis and Use of this Report
       This report has been prepared in accordance with the objectives, scope and approach set out in Appendix 1
       and subject to the limitations set out in Appendix 3 (Basis and Use of the Report).

       The relationship you can count on                                                      i     at Heed zs oe   5‘
                                                                                 cect   TO          2 ae

                                                                                                   Page 58 of 81

Section 59

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 59 of 81

GENERAL COMMITTEE MEETING AGENDA                                                                                                    12 DECEMBER 2016

           “-<        Crowe Horwath..

          Disclaimer
          This report is provided solely for Noosa Council for the purpose for which the services are provided, Unless required by law you shall not provide this report
          to any third pary, publish it on a website or refer to us or the services without prior written consent. In no event, regardless of whether consent has been
          provided, shail we assume any responsibility to any third party to whom our report is disclosed or otherwise made available. No copy, extract or quote from
          our report may be made available to any other person without our prior written consent to the form and content of the disclosure.

          The services provided in connection with the engagement comprise an advisory engagement which is not subject to assurance or other standards issued
          by the Australian Auditing and Assurance Standards Board and, consequently no opinions or conclusions intended to convey assurance will be expressed.
          This review report has been prepared at the request of Noosa Council in connection with our advisory engagement to perform review services as detailed in
          our scoping letler dated 5 July 2016,

          Due to the inherent limitations of any internal control structure, it is possible that fraud, error or non-compliance with laws and regulations may occur and
          not be detected, Further, the internal control structure, within which the control procedures thal are subject to procedures we perform operate, is nol
          reviewed in its entirety and, therefore, no opinion or view is expressed as to its effectiveness of the greater Internal control structure, The procedures
          performed are not designed to detect all weaknesses in control procedures as they are not performed continuously throughout the period and the tests
          performed on the control procedures are on a sample basis. Any projection of the evaluation of control procedures to future periods is subject to the risk
          that the procedures may become inadequate because of changes in conditions, or that the degree of compliance with them may deteriorate. Crowe
          Horwath (Aust) Pty Ltd provides no warranty regarding the accuracy or completeness of the information. All opinions, conclusions, forecasts or
          recommendations are reasonably held at the time of compilation but are subject to change without notice by Crowe Horwath (Aust) Pty Ltd. Crowe Horwath
          (Aust) Pty Lid assumes no obligation to update this dacument after It has been issued, Except for any liability which by law cannot be excluded, Crowe
          Horwath (Aust) Pty Lid, its Directors, employees and agents disclaim all liability (whether in negligence or otherwise) for any error, inaccuracy, or omission
          from the information contained in this document or any loss or damage suffered by the recipient or any other person directly or indirectly through relying
          upen the information.

          Crowe Horwath (Aust) Pty Ltd disclaims all liability to any party other than the client for which it was prepared in respect of or in consequence of anything
          done, or omitted to be done, by any party in reliance, whether whole or pariial, upon any information contained in this report. Any party, other than the
          client for which it was prepared, who chooses to rely in any way on the contents of this report, does it so at their own risk. The information in this document
          and in any related oral presentation made by Crowe Horwath (Aust) Ply Ltd is confidential! between Crowe Honvath (Aust) Py Ltd and the client for which it
          was prepared and should not be disclosed, used or duplicated in whole or in part for any purpose except with the prior writfen consent of Crowe Horwath
          (Aust) Ply Ltd. An electronic copy or print of this document is an UNCONTROLLED COPY.

          The relationship you.can count on                                                                                                                a

                                                                                                                                                Page 59 of 81

Section 60

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016


                                     ATTACHMENT 2




                                        Page 60 of 81

GENERAL COMMITTEE MEETING AGENDA                                              12 DECEMBER 2016

  xm             :     5                                                          ATTACHMENT 2
        NOOSA COUNCIL
  mm

   22 September 2016

     4          F     a re   .
               ke                                     7           ors
      a        Py  Th, ra   ‘                                     Ss 4
              ae                          ~-                  “F
       aL             ey        =   .

   Dear Resident,
   GARDEN WASTE BIN TRIAL - 1 OCTOBER TO 4 NOVEMBER 2016
   We would like to thank you for choosing to have a garden waste bin and playing your part in
   Noosa Council's effort to reduce the amount of organic waste reaching landfill.
   Your household has been chosen to participate in a one month waste reduction trial.
   During the trial we ask that you place your vegetable and fruit waste in your garden waste
   bin. This waste will be mulched at Council's Resource Recovery Facility. During the trial
   some bins will also be weighed and audited as part of the study.
   To Get Started:

   When: Please start adding your uncooked vegetable and fruit waste to your garden waste
   bin from Sunday 1 October until Friday 4 November 2016.
       WHAT CAN YOU PUT IN:
      » Uncooked vegetables and fruit waste
      » Leafy vegetables, peels, egg shells, tea bags and coffee grounds
      »” lf you wish these can be wrapped in newspaper
      >» If you already compost/worm farm, continue to do this
   PLEASE DON’T PUT IN: Liquids, cooked food, dairy, meat, bones, bread or plastic bags.
   Why are we doing it? As part of our Towards Zero Waste campaign we are investigating
   different ways of reducing some of the organic food waste that is currently going to landfill,
   without introducing a costly weekly organic food waste service.
   Your participation is not compulsory however we would appreciate your support. For further
   information contact Council’s Customer Service on 5329 6500.
   Thank you for your assistance.

   Wayne Schafer
   MANAGER WASTE AND ENVIRONMENTAL HEALTH
   For more information on reducing waste: www.noosa.qld.gov.au/waste-recycling

             ee                       oa «=        LE               ie

                                                                                     Page 60 of 81

Section 61

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016


                                    ATTACHMENT 3




                                        Page 61 of 81

GENERAL COMMITTEE MEETING AGENDA                                                           12 DECEMBER 2016

                                                                                             ATTACHMENT 3
    AEC Group Pty Ltd (Brisbane)                                                                      =
    PO Box 941
    Spring Hill QLD 4004                                                            I EC             >
                                                                                                   OUTCOME DRIVEN

    29'" November 2016

    Wayne Schafer
    Manager Waste and Environmental Health
    Noosa Council

    Dear Wayne,

    RE: REVIEW OF WASTE MANAGEMENT CONTRACT TENDER ASSESSMENT

    AEC Group Pty Ltd (AEC) has undertaken a high-level review of the summary assessment spreadsheets
    prepared by Noosa Council (Council) from the tender documentation received by prospective contractors for
    Council's waste management contracts (consisting of separable portions A, B and C).
    From Council's review summary spreadsheets, a preferred tenderer was identified when taking account of both
    price and non-price components across the various permutations of contract combinations available to Council.
    AEC has undertaken a review of the assessment approach undertaken by Council in addition to the financial
    outcomes from the tendered rates for each separable portion and can confirm that Council's selection of the
    preferred tenderer is in fact appropriate.
    Regarding the potential risk associated with the financial costs to Council from changes in underlying rise and fall
    indices during the contract, this is deemed to be negligible when compared to the cost difference between the
    preferred tenderer and the next best tenderer which is of the order of $1.5 million per annum.
    This is particularly the case given that the preferred tenderer has a relatively high proportion of costs assigned to
    ‘Other’ within rise and fall, which is generally considered a less volatile and less risky inflation variable than
    ‘Labour’ and ‘Fuels & Oils’. As such, no detailed sensitivity analysis is required on the rise and fall variables
    during the contract.
    Should you have any queries in relation to the above, please do not hesitate to contact me on 0438 550 018 or

    Yours sincerely
            7 Z 2

    Gavin O’Donovan
    Director — Finance

                                                                                                   Page 61 of 81

Section 62

GENERAL COMMITTEE MEETING AGENDA                                                               12 DECEMBER 2016


8                        LEASING OF THE DEMOUNTABLE BUILDING AT BICENTENNIAL COMMUNITY
                         CENTRE
DOCUMENT INFORM AT ION




Author                              Community Facilities Manager, Ash Saward
                                    Community Services Department

Index                               ECM/ Subject / 72.01 – The J

Attachments                         Nil.


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Facilities Manager to the General Committee
meeting dated 12 December 2016 and:
A.                       Approve the leasing of the Bicentennial Community Centre (BCC) demountable building to
                         Montessori Noosa (Education for Generations Ltd) on a 5 X 5 lease, commencing January
                         2017; and
B.                       Provide approval to lease the BCC annexe, also to Montessori Noosa, when the school’s
                         enrolment levels reach sufficiently high numbers, likely within the next two to three years.



REPORT
The Bicentennial Community Centre (BCC) is a large multipurpose venue located within a
community precinct at Sunshine Beach. The venue, which opened in 1988, consists of a main
hall (now permanently leased to Noosa Gymnastics Club), a standalone demountable building
and a separate rear annexe.

The demountable was originally placed onsite by the University of the Sunshine Coast as their
first campus in the Noosa Shire. They vacated the building and shifted to The J following its
opening. Following the University's departure, Council elected to purchase the building and
subsequently leased it to United Synergies / Noosa Flexible Learning Centre for use as a school.

Noosa Flexible Learning Centre vacated the building in mid-2014 following the construction of
their own facility in Girraween Court, Sunshine Beach. Since this time the demountable has
predominately been utilised by Little Seed Theatre Company via an ongoing casual hire
agreement.

Management are seeking Council's approval to enter into a 5 X 5 lease for the demountable,
commencing January 2017, for use by Montessori Noosa, a recently accredited primary school to
be managed by not-for-profit entity Education for Generations Ltd. Montessori Noosa will be
aligned with Little Seed Theatre Company and will independently facilitate continued use of the
building by the group.

The proposed usage is consistent with the building's previous use and will provide a stable
income stream for Council at rates commensurate with those commanded in the commercial
marketplace.



                                                                                                      Page 62 of 81

Section 63

GENERAL COMMITTEE MEETING AGENDA                                                            12 DECEMBER 2016


Management are also seeking agreement from Council for the future leasing of BCC's annexe,
also to Montessori Noosa. The demountable building will be large enough for Montessori Noosa
in their first couple of years of operation, however if they grow in line with expectations they
would like to expand into the annexe. While this is subject to adequate enrolment numbers, a
degree of certainty around Council's willingness to enter into such an arrangement would aid the
planning efforts of both parties.

Currently the annexe is utilised by a handful of regular casual hirers for approximately 12 hours
per week. There is minimal sporadic usage outside of these hirers. Management is confident that
a majority of hirers could be accommodated at either The J or Noosa Leisure Centre, or at some
of the surrounding school halls. Permanently leasing the annexe would generate much higher
revenue than under the current utilisation model.

Previous Council Consideration

Ordinary Meeting, 18 August 2016, Item 14, Page 10

That Council note the report by The J & BCC Coordinator to the Services & Organisation
Committee meeting dated Tuesday 9 August 2016, providing an update on the activities of The J
and BCC for the 2015/16 financial year.

Page 6 of the report presented to Services & Organisation Committee dated 9 August 2016
stated: “The demountable building is currently permanently utilised by Little Seed Theatre
Company, with negotiations underway with the group to commence a community school campus
from the beginning of 2017. It is management's intention to enter into a lease agreement with the
school.”

Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Departments/Sections Consulted:

       Chief Executive Officer                x   Community Services                 x   Corporate Services
       Executive Officer to the Mayor & CEO   x   Community Facilities                   Financial Services
       Executive Support                          Community Development                  ICT
                                                  Libraries & Galleries                  Procurement & Fleet
                                                  Local Laws                         x   Property & Facilities
                                                  Waste & Environmental Health           Revenue Services

       Executive Office                       x   Planning & Infrastructure
       Community Engagement                       Building & Plumbing Services
       Customer Service                           Civil Operations
       Economic Development                       Disaster Management
       Governance                                 Infrastructure Planning & Design
       Human Resources                        x   Planning & Environment
       Sustainability                             Strategic Land Use Planning




                                                                                                     Page 63 of 81

Section 64

GENERAL COMMITTEE MEETING AGENDA                                                                      12 DECEMBER 2016


9                        NOOSA BIOSPHERE RESERVE BOARD ANNUAL REPORT
DOCUMENT INFORM AT ION




Author                          Chief Executive Officer, Brett de Chastel
                                CEO’s Office
Index                           ECM/ Subject/ Noosa Biosphere Reserve Foundation - Management

Attachments                     1.   Annual Report from Noosa Biosphere Reserve Foundation Board
                                     (28pg attachment provided separately to this report; 2 x hard copies available in
                                     Councillors’ Room)



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 12 December 2016 and note the annual report for the financial year 2015/16 to Council by
the Noosa Biosphere Reserve Foundation which also incorporates their September 2016
quarterly report.


REPORT
As Council is aware, the Noosa Biosphere Reserve Foundation (NBRF) was established by
Council in 2015.

Council has two roles with the NBRF Board. Firstly, it has the right to appoint one director of the
Board with Mayor Wellington being the current appointee. Secondly, the Council provides
funding under a Funding Agreement entered into on 1 June 2015. Under that funding
agreement, NBRF is required to provide a number of reports and information to Council.

Council has now received the annual report from the NBRF Board pursuant to section 5.2 (a) of
the Funding Deed which is attached to this report for the information of Council.

The Funding Agreement between the Council and NBRF includes a number of reporting and
other requirements in clauses 4 and 5 of that Deed. The current status of some of those key
requirements are set out below:

 Clause 4.2 – requirement for NBRF to seek Council’s approval before NBRF commits to any
   purchase, contract, undertaking or activity that has financial commitments beyond the period
   of approved funding where Council funding is required. NBRF has complied with this
   requirement by seeking Council’s approval (resolution in December 2015) for its multi-year
   projects.

 Clause 5.1 (a) – a requirement to develop a management plan for the Noosa Biosphere
   Reserve in accordance with the management principles set out in Schedule 7 of the
   Environment Protection and Biodiversity Conservation Regulation 2000. Subsequent to
   entering into the Funding agreement with NBRF, we became aware that this requirement only
   applies to Biosphere Reserves that were managed by the Commonwealth e.g. Uluru. That
   legislative requirement does not apply to non-Commonwealth administered Biospheres. As
   such, this requirement is not needed for the Noosa Biosphere Reserve.

                                              

                                                                                                               Page 64 of 81

Section 65

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


 Clause 5.1 (b) – Develop an Operational Plan and Budget aligned with the objectives for the
   Company and the Public Trust for each financial year and submit to Council for review no
   later than three months before the beginning of each financial year. NBRF advised in writing
   on 31 March 2016 that their budget requirements for 2016/17 would be the same as for the
   previous year. Given that this was shortly after the change of Chairperson and with the
   absence of their project officer, no further details were provided. The attached report now
   sets out in more detail their 2016/17 operational budget. In accordance with this operational
   budget, the Chairperson of NBRF has advised that it is unlikely that NBRF will require the
   payment of its 3rd and 4th quarter operational payments (totalling $70,000).

 Clause 5.1 (e) – In conjunction with the Council, develop appropriate key performance
   indicators that best reflect the performance of the NBRF against the objects of the Public
   Trust and submit to Council for review no less than 3 months before the beginning of each
   financial year. The attached report includes a number of performance indicators used by the
   NBRF Board. They have developed a traffic light system which is a useful tool to keep track
   of which projects are on track / need monitoring or are behind. Council staff have provided
   NBRF with some additional suggested KPIs focused on issues such as percentage of non-
   Council funds raised for projects. As indicated in the annual report from NBRF (see page 3
   of annual report) the development of suitable KPIs is a work in progress. Staff will follow up
   with NBRF to formalise the final set of KPIs which needs to be agreed by both parties.

 Clause 5.2 (a) – Prepare an annual report for each financial year and submit to Council no
   later than 30 November each year. The annual report is to include evidence that the funding
   is being successfully applied to the objects of the company and public trust and particularly to
   the delivery of projects funded by the Council contribution. The attached report has been
   provided by NBRF in relation to this requirement. (Note that an annual report was not
   required in November 2015 as there was no Council funding provided in 2014/15 – refer
   Council resolution dated 7 May 2015).

 Clause 5.2 (b) – Prepare a progress report against the utilisation of the funding towards the
   NBRF program and performance against agreed key performance indicators to 31 December
   each year (6 month progress report) and submit to Council no later than 31 January each
   year. Two 6 monthly reports have been previously been received – 31 January 2016 (from
   former Chair Scott Williams) and 13 July 2016 (from Campbell Corfe the current
   Chairperson). The current Chair has also indicated that he would like to provide Council with
   more frequent updates and the attached annual report also includes activities up to 30
   September 2016 (the first quarter of the financial year).

 Clause 5.2 (c) – Provide an audited financial report (which identifies the use of the funding
   provided by Council for the NBRF program). The attached report from NBRF includes their
   annual financial statements. Note that advice from the Chairperson is that this financial
   report has been audited but due to a timing issue with the NBRF Annual General Meeting
   (AGM scheduled for Friday 9 December) the signed version of the audited financial
   statements has not yet been provided. That is expected to be provided once the auditor
   physically signs the document for the AGM. A copy of the audited financial report will be
   provided separately to Councillors and placed on Council’s website once it is received. That
   is expected after the date this report was prepared but before the date of the final Council
   meeting of the year.




                                                                                    Page 65 of 81

Section 66

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016


Previous Council Consideration

Ordinary Meeting, 7 May 2015, Page 12, Item 4
That Council note the report by the Executive Officer to the Planning & Organisation Committee
Meeting dated 28 April 2015 and:
A.   Agree to the revisions made to the draft funding deed between Council and the Noosa
     Biosphere Foundation Ltd as detailed in Attachment 1 to the report; and
B.   Authorise the Chief Executive Officer to amend Clause 4 – Payments to provide for the
     project funding under Clauses 4.1 B ii) and iii) to be paid after 30 June 2015 and to finalise
     the arrangements.


Ordinary Meeting, 12 March 2015, Page 10, Item 3
That Council note the report by the Executive Officer to the Planning & Organisation Committee
Meeting dated 3 March 2015 and the further report to the General Committee Meeting dated 9
March 2015 and:
A.   Agree to enter into a funding deed with the Noosa Biosphere Reserve Foundation Ltd as
     provided in Attachment 1 to the report to Planning & Organisation Committee dated 3
     March 2015 with the following changes:
     1.    Clause 4.1 Payments
           Amend clause 4.1 b) ii) to read “$250,000 (excluding GST) – payable to the NBRF
           Public Trust from the Environment Levy for projects that conserve and/or improve
           biodiversity in the Noosa Shire and have tangible and measurable outcomes”.
           Amend clause 4.1 b) iii) to read “$80,000 (excluding GST) – payable to the NBRF
           Public Trust for economic projects consistent with the purposes of the Trust.
     2.    Clause 6.2 Repayment of Funding
     Amend as outlined in the further report to General Committee dated 9 March 2015.
B.   Authorise the Chief Executive Officer to make minor alterations to the Deed, as may be
     necessary, and enter into a formal agreement with the Foundation;
C.   Agree in principle to a one-off contribution of $10,000 being for the establishment and initial
     operating costs of a community based incorporated association that is aligned with the
     purposes of the Noosa Biosphere Reserve Trust, subject to no membership fees being
     charged until after the second annual general meeting;
D.   Apply the exception to the requirement for tendering under Section 236(1)(b)(ii) of the Local
     Government Regulation 2012 for the occupancy of part of Council owned premises located
     on Lot 1, RP96529 at 52 Doonella Street, Tewantin as the proposed lease is to a not for
     profit community organisation; and
E.   Authorise the Chief Executive Officer to enter into negotiations with the Noosa Biosphere
     Reserve Foundation Ltd and finalise a lease for part of Council owned premises located on
     Lot 1, RP96529 at 52 Doonella Street, Tewantin, for a period of 3 years, with a 3 year
     option

Finance & Risk

The purpose of this report is to provide the Council with a copy of the NBRF annual report.
Obviously, the financial risk occurs if the NBRF does not deliver good outcomes in accordance
with the purpose of the funding. The annual report provides Council with details of that progress.


                                                                                    Page 66 of 81

Section 67

GENERAL COMMITTEE MEETING AGENDA                                                 12 DECEMBER 2016


Consultation

External Consultation - Community & Stakeholder

Liaison with Chairperson of the NBRF

Internal Consultation

All Councillors have received a briefing and presentation from the Chairperson of the NBRF on
the projects referred to in the annual report.


Departments/Sections Consulted:

X   Chief Executive Officer                Community Services                 Corporate Services
X   Executive Officer to the Mayor & CEO   Community Facilities               Financial Services
    Executive Support                      Community Development              ICT
                                           Libraries & Galleries              Procurement & Fleet
                                           Local Laws                         Property & Facilities
                                           Waste & Environmental Health       Revenue Services

    Executive Office                       Planning & Infrastructure
    Community Engagement                   Building & Plumbing Services
    Customer Service                       Civil Operations
    Economic Development                   Disaster Management
    Governance                             Infrastructure Planning & Design
    Human Resources                        Planning & Environment
    Sustainability                         Strategic Land Use Planning




                                                                                          Page 67 of 81

Section 68

GENERAL COMMITTEE MEETING AGENDA                                                                       12 DECEMBER 2016


10                       OYSTER RESTORATION PROJECT - ACCEPTANCE OF DRAFT RESOURCE
                         ALLOCATION AUTHORITY CONDITIONS
DOCUMENT INFORM AT ION




Author                          Environmental Officer, Cherie O’Sullivan
                                Planning & Infrastructure Department

Index                           ECM/ Project & Contract/ Noosa River Management/ Oyster Reef
                                Restoration Project

Attachments                     1.     Plans
                                2.     Background Detail
                                3.     Draft Resource Allocation Authority pending Council approval
                                (All three Attachments provided separately to this agenda (63 pages); 2 x hard copies available in
                                Councillors’ Room)




EXECUTIVE SUMMARY
Oyster reefs provide important diversity to fish habitats for their health. Noosa River previously
boasted extensive oyster reefs throughout its system, and these coincided with reports of very
successful fisheries.
Following awareness of the functional extinction of oyster reefs from Noosa River through over
harvesting and dredging, there has recently been support for a project to restore the oyster reefs
through the system.
The Nature Conservancy in conjunction with the Thomas Foundation, The Noosa Biosphere and
the University of the Sunshine Coast have undertaken extensive background studies to deliver
such a project to benefit the Noosa River. Reports on the project have previously been presented
to Council in Ordinary Meetings held on 22 October 2015 Item 7, Page 8 and 20 November 2014,
Item 1, Page 3.
As the works will be proposed on public land and in areas such as Declared Fish Habitat Areas,
and Tidal Areas, State government policies only provide for public entities, such as Noosa
Council, to be the applicant for approvals needed to allow for delivery of such restoration
activities.
Given the changes to the substrate in the bed of Noosa River required to allow oysters to recruit,
compared to the early 1900’s, it is necessary for human intervention to provide oyster reef
restoration units. These units will facilitate the restoration of oyster spat in a vertical profile
elevated above the river bed in a manner that can facilitate natural restoration processes.
Installation of oyster reef restoration units at the most appropriate sites requires a Resource
Allocation Authority (RAA) from the Department of Agriculture, Forestry and Fisheries (DAFF).
Given that oyster reef restoration is a novel concept in Queensland, the policies of the State
Government have not yet been established to easily allow for this to occur. DAFF is proposing a
number of conditions to facilitate their approval of the beneficial project. The conditions of note
include signage, monitoring and indemnification to the State for any damage to persons or
properties on the State land as a result of the works.
Given that Noosa Council’s only involvement is to facilitate development approval for the project,
there is a possibility for all costs associated with such indemnification to be passed on to the
other project partners. Noosa Council staff are currently seeking advice from its insurers
regarding the costs of such liabilities.




                                                                                                                Page 68 of 81

Section 69

GENERAL COMMITTEE MEETING AGENDA                                                12 DECEMBER 2016


RECOMMENDATION
That Council note the report by the Environment Officer to the General Committee Meeting dated
12 December 2016, and:
A.    Accept the Draft Resource Allocation Authority conditions proposed by the Department of
      Agriculture Forestry and Fisheries on behalf of the project partners;
B.    Authorise the development application for the project to be submitted as soon as possible
      to facilitate deployment of the oyster reef restoration units in the March to May oyster spat
      recruitment season;
C.    Authorise the Chief Executive Officer to negotiate and enter into a formal agreement with
      relevant project partners, which will result in nil additional cost to Council (following
      payment of development application fees) associated with the project, following receipt of
      the development approval.



REPORT
The purpose of this report is to notify Council of the conditions proposed in the Resource
Allocation Authority, and seek Council’s agreement to proceed with the lodgement of a
development application.

1.    Background

In 2015, Dr Ruth Thurston of the School of Biological Sciences and Australian Research Council
Centre of Excellence for Coral Reef Studies, University of Queensland prepared a report
detailing the historical ecology of the Noosa Estuary Fisheries. This report is available on
Council’s website (a link to the report can be found here or visit www.noosa.qld.gov.au/rivers-
creeks).

This report identified that among many significant changes to Noosa’s river system, the once
plentiful oyster reef habitats throughout the Noosa Estuary that provided important habitat to
fisheries resources, became functionally extinct in the mid-late 1900’s. This was attributed to
heavy harvesting of the oysters and dredging of the substructure for road construction materials.

A report was subsequently prepared detailing management options to restore the ecology of
Noosa River for the benefit of fisheries habitats. It identified the restoration of oysters as one of
the key components to restore the health of fisheries habitats, and therefore fisheries in the
Noosa River. This report is also available on Council’s website (a link to the report can be found
here or visit www.noosa.qld.gov.au/rivers-creeks).

To supplement the findings and recommendations of these reports, The Nature Conservancy
undertook a feasibility study to determine the likelihood of being able to naturally restore oyster
reefs in the Noosa River system. The study involved placement of 160 settlement tiles throughout
the Noosa River System. Oyster larvae or oyster spat successfully recruited on a number of
settlement tiles. This indicated that viable oyster spat is still plentiful throughout the Noosa River.
However, it was also concluded that while oyster spat is still plentiful, there is inappropriate
substrate remaining for settlement of the oyster spat throughout the system.

Following this study, Noosa Council co-funded with the other partners, the preparation of a
project plan and development application, also providing in kind support to investigate the
possibility of restoring oyster reefs throughout the Noosa River system. The project proposal is to
establish oyster restoration units at 15 sites throughout the Noosa River. The location and design
for the proposed oyster reefs are shown in Attachment 1 to this report.



                                                                                       Page 69 of 81

Section 70

GENERAL COMMITTEE MEETING AGENDA                                                 12 DECEMBER 2016


To ensure that the proposed design would not be substituting any fish habitat resources that
were unlikely to have been inhabited with oysters prior to their removal in the mid 1900’s, a
further assessment of the Noosa River system was undertaken by Ecological Service
Professionals on 25-26 October 2016 (the ESP report).

The ESP report quantified that approximately 9,585m2/yr of oysters were likely to have been
removed from the river system for sale each year through peak harvest season. This was in
addition to an unquantified amount of oyster reef substructures that were dredged to provide
materials for road construction etc.

The ESP report also identified that 16,850m2 of buried or functionally dead oyster beds that are
unable to naturally recruit, remain within the Noosa River System.

The reason natural recruitment has not occurred since the mid 1900’s is attributed to a reduction
in hard oyster reef structures for the oyster spat to recruit on, compared to what was available
prior to dredging.

Where hard structures do exist, they are at an inappropriate profile to facilitate the establishment
of an oyster reef. The reasons include frequent sedimentation over the flat hard substrate level
with the river bed which prohibits successful spat recruitment. Oyster spat recruitment is also
most efficient on other oyster shells, most likely due to the ideal micro water chemistry their own
organism creates.

Oyster reefs that previously existed in Noosa River were established prior to hydrological
changes in the catchment such as excessive forestry in the upper catchment and alteration of the
river mouth in the lower catchment and changes to the benthic geology through oyster dredging.
The lack of natural recruitment since oyster harvesting ceased in the mid 1900’s, and the new
river processes, indicates it is now too difficult for the oysters to recruit their natural reef
establishment processes on their own and assistance is needed to provide the vertical profiles
and structures best suited for the natural recruitment processes.

Establishment of a vertical profile, as is proposed in the oyster restoration unit’s design, will
provide sufficient surface areas throughout the under structure for the oyster spat to settle and
continue growing even where sediment and algae establish on the top.

Further, the results of recent studies identified that the vertical profile provided by oyster reefs (as
opposed to flat oyster beds) have been shown to establish different microclimates and therefore
may provide additional levels of resilience for aquatic organisms in changing water temperatures
associated with climate change. Therefore, supporting restoration of lost oyster bed
environments in the Noosa River system can be seen as demonstrating Noosa Council’s
commitment to improving climate change adaptation for our environmental resources.

The conceptual diagram below demonstrates why restoration units are necessary to assist the
establishment of the natural oyster spat recruitment process.




                                                                                        Page 70 of 81

Section 71

GENERAL COMMITTEE MEETING AGENDA                                             12 DECEMBER 2016




The Noosa Biosphere ®, Noosa Parks Association in conjunction with The Thomas Foundation
and the University of the Sunshine Coast are the main partners to deliver the proposed oyster
reef restoration initiative.

2.   Status of application

To ensure that the oyster reef restoration proposal will not interfere with recreational pursuits
within Noosa River, it is proposed that all the oyster reef restoration units are located within an
area of the Declared Fish Habitat Area (state managed resource) of the Noosa River.

This requires a Resource Allocation Authority (RAA) from the DAFF, which will only be issued
where it can be demonstrated that the project will benefit the public. For this reason, the RAA can
only be issued to Noosa Council as a representative of the community.

Following the provision of a RAA, a development approval, from Council, would then be required
for Prescribed Tidal Works. The Department of Environment and Heritage Protection, Maritime
Safety as well as the Department of Agriculture Forestry and Fisheries are concurrence agencies
for such an approval and their role is to ensure the project design is consistent with State
Planning Policies for their particular jurisdictions. Again this approval can only be issued to
Noosa Council as a representative of the community.

DAFF is co-operating to progress the application, however, despite positive evidence of this
project’s application elsewhere throughout the world, as oyster reef restoration is a novel concept
in Queensland policies do not currently exist within DAFF to allow for a straight forward approval
for oyster reef restoration.

DAFF has therefore proposed to issue a RAA to Noosa Shire Council to enable the submission
of the development application for the Oyster Reef restoration Units, subject to a number of
conditions. The exact wording of the proposed conditions is provided in Attachment 3 but the
conditions of note are summarised as follows:


                                                                                    Page 71 of 81

Section 72

GENERAL COMMITTEE MEETING AGENDA                                                12 DECEMBER 2016


1.    The approval can only be issued on a trial basis. If the oyster spat does not successfully
      recruit to a pre-agreed density after three years, the applicant, being Noosa Shire Council
      is required to remove the oyster reef restoration units in the 4th year.
2.    Signage is necessary at each site to notify the community that the oyster reef restoration
      units are being deployed on a trial basis only, and provide details on who to contact if there
      are issues or complaints about the sites.
3.    A requirement to indemnify the State government from any legal proceedings or costs that
      may result from damage to person or property as a result of the works.
4.    After three years, the reef structures can no longer receive maintenance and must be
      considered a natural part of the ecosystem within the Declared Fish Habitat Area.

3.    Monitoring

As the project will only be allowed to remain deployed for a 3 year period, monitoring of the units
is necessary to identify whether or not the oyster spat is recruiting on the restoration units at a
rate that they are likely to naturally cement around the restoration units within the 3 year trial time
frame.

Where this Key Performance Indicator, as agreed to by DAFF is not met, it will be Noosa
Council’s responsibility, as the RAA holder, to remove failed oyster reef restoration units following
their deployment. All other units will be permitted to remain, however will be considered a natural
feature of the declared fish habitat area.

4.    Funding for partners

To date, funding in the form of in kind support for seeking relevant approvals for deployment of
the oyster reef restoration units and one third of the funding of the fees associated with the
preparation and submission of the development approvals has been provided by Noosa Council
staff. There is no further funding budgeted to be provided by Noosa Council for the project.


Previous Council Consideration

Ordinary Meeting, 20 November 2014, Item 1, Page 3
That Council note the presentation to a Council workshop on 14 November 2014 from The
Nature Conservancy and the Thomas Foundation in relation to proposed projects to improve the
environmental outcomes for the Noosa River, and
A. Authorise the Chief Executive Officer to write to The Nature Conservancy and the Thomas
   Foundation advising that the Council will provide support for the two initial proposed projects
   with a Council financial contribution of up to $25,000 and with Council also providing support
   for any required interface to government agencies; and
B. Request the Chief Executive Officer to continue liaison with both The Nature Conservancy
   and the Thomas Foundation regarding possible future projects for consideration and to
   provide Council with updates as required.




                                                                                       Page 72 of 81

Section 73

GENERAL COMMITTEE MEETING AGENDA                                            12 DECEMBER 2016


Ordinary Meeting, 22 October 2015, Item 7, Page 8
That Council note the report by the Environment Officer (Rivers and Coast) to the Planning &
Organisation Committee Meeting dated 13 October 2015 and:
A. Confirm support for the establishment of a small scale pilot oyster reef restoration project to
build further knowledge in this area of aquatic restoration of the Noosa Estuary; and
B. Agree to provide in kind technical support to the Thomas Foundation for the development of a
detailed project proposal.

Finance & Risk

Noosa Council’s Governance Advisor is currently seeking advice from Council’s insurer LGM
regarding any cost implications associated with indemnifying the state from any costs associated
with the project. At the time of writing this report no comment had been received, however, a
verbal update will be provided to Council at the General Committee meeting.

With respect to the costs of removal of any unsuccessful units, Thomas Schlacher, on behalf of
USC, has verbally agreed to cover the full cost of any necessary removal of the reef restoration
units.

The costs of signage are estimated to be around $30,000 (2 signs per site). Monitoring activities
will be performed by the University of the Sunshine Coast.

There will be some administrative burden associated with the project due to Council being the
nominated contact reference on the signage, including maintaining a register of comments and/or
complaints.

With respect to the above, formal agreements will need to be developed between Council and
the relevant project partners to ensure clarity with respect to parties’ respective obligations,
financial contributions and to protect Council’s interests.

Provided that suitable agreements can be made, or bonds sought from the project partners to
indemnify the Council from any costs associated with the project, the risk associated with the
project would be considered acceptable and beneficial in terms of demonstrating Noosa
Council’s commitment to The Noosa Plan Environmental Sector Vision which states:

The Noosa community has a commitment to environmental excellence and sustainability. The
impact of human settlement has been minimised. We manage, maintain, restore and preserve
our natural environment of:
a)    biodiversity of flora and fauna;
b)    air;
c)    land;
d)    water; and
e)    forests and other ecosystems.

Restoration of oyster reefs that were anthropogenically removed in the pioneering days of Noosa,
will deliver community benefit in accordance with the Environmental Sector Vision of the Noosa
Plan, which is to restore natural environments impacted by Human Settlement.




                                                                                   Page 73 of 81

Section 74

GENERAL COMMITTEE MEETING AGENDA                                                     12 DECEMBER 2016


Consultation

External Consultation - Community & Stakeholder

Following receipt of the draft conditions of the RAA, a meeting between Council and all project
partners was held on 30 November 2016. At that meeting, the project partners agreed to accept
the conditions of the RAA and agreed that further discussions would be held on funding the costs
associated with those conditions.

Others consulted to date regarding the project include
 Sunfish.
 Department of Agriculture, Forestry and Fisheries
 Department of Environment and Heritage Protection
 University of the Sunshine Coast
 The Nature Conservancy
 Oceanwatch

Internal Consultation

Paul Bright – Governance Advisor

Departments/Sections Consulted:

    Chief Executive Officer                    Community Services                 Corporate Services
    Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
    Executive Support                          Community Development              ICT
                                               Libraries & Galleries              Procurement & Fleet
                                               Local Laws                         Property & Facilities
                                               Waste & Environmental Health       Revenue Services

    Executive Office                       X   Planning & Infrastructure
    Community Engagement                       Building & Plumbing Services
    Customer Service                           Civil Operations
    Economic Development                       Disaster Management
X   Governance                                 Infrastructure Planning & Design
    Human Resources                        X   Planning & Environment
    Sustainability                             Strategic Land Use Planning




                                                                                              Page 74 of 81

Section 75

GENERAL COMMITTEE MEETING AGENDA                                                                 12 DECEMBER 2016


11                       FINANCIAL PERFORMANCE REPORT - NOVEMBER 2016
DOCUMENT INFORM AT ION




Author                           Manager Financial Services, Wayne Jensen
                                 Corporate Services Department

Index                            ECM / Subject / 22.09 – Monthly Financial Performance Report

Attachments                      1.    Statement of Comprehensive Income
                                 2.    Statement of Financial Position


EXECUTIVE SUMMARY
Overall year to date financial performance against budget shows a positive variance, with
revenue and expenditure continue to track slightly above and below budget respectively.

         Financial Performance Summary to 30 November 2016
                                    Current YTD Actual                          Variance    Variance     Status
                                        YTD          $m                              $m         YTD
                                     Budget                                                       %
                                         $m
         Recurrent Revenue             $42.2       $43.2                             $1.0      2.3%    On track
         Recurrent Expense             $35.3       $34.7                             $0.6      1.8%    On track

         Net Capital Revenue                          $1.9            $2.7           $0.8       40%    On track
         Capital Expenditure                          $5.6            $4.8           $0.7       13%    On track

Financial statements including Statement of Comprehensive Income (profit & loss) and
Statement of Financial Position (balance sheet) are included as attachments for information of
Council.

Figure 1: Actual Performance Compared to YTD Budget

               $50
               $45
               $40
               $35
               $30
               $25
               $20
               $15
               $10
                $5
                $-
                                YTD Budget ($m)                       YTD Actual ($m)

                                  Operating Revenue          Operating Expenditure




                                                                                                       Page 75 of 81

The text continues on section 76.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.