Skip to the record
Every meeting, every word.

Original source · versioned page text

2016-12-12 General Committee Agenda

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 DECEMBER 2016




                                        Page 23 of 81

GENERAL COMMITTEE MEETING AGENDA                                                12 DECEMBER 2016

   |     |        -   TMR’s Road Planning and Design Manual.                Po
      Removal of redundant road access works

      3:      The existing vehicular property access as detailed in Landscape  Prior to the
              Concept Plan, prepared by Sunshine Gardens, dated 20             commencement of
              September 2015, drawing no. L002, Revision A, as amended in      the use.
              red on 4/11/16 by TMR must be permanently closed and
              removed.

      Design Vehicle and traffic volume
     4.       The road access location is restricted to an entry only (western At all times.
              driveway) and exit only (eastern driveway) arrangement, as
              detailed in Landscape Concept Plan, prepared by Sunshine
              Gardens, dated 20 September 2015, drawing no. L002, Revision
              A, as amended in red on 4/11/16 by TMR.

              (a) Stormwater management of the development must ensure no      (a) At all times.
                  worsening or actionable nuisance to the state-controlled road.

              (b) Any works on the land must not:
                i.    create any new discharge points for stormwater runoff              ;
                      onto the state-controlled road;                          (b) At all times.
                il.   interfere with and/or cause damage to the existing
                      stormwater drainage on the state-controlled road;
                ili.  surcharge any existing culvert or drain on the state-
                      controlled road;
                iv.   reduce the quality of stormwater discharge onto the state-
                      controlled road.

               (c) RPEQ certification must be provided to the Department of
                   Transport and Main Roads, confirming that the development | (c) Prior to the
                   has been designed and constructed in accordance with            commencement
                   parts (a) and (b) of this condition.                            of use.

                                                                                       Page 23 of 81
Log in to download the original file

2016-12-12 General Committee Agenda(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.