Original source · versioned page text
2016-12-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2016
Page 25 of 81
GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2016
Our reference: SDA-0816-032888
Council reference: MCU16/0090
Your reference: SUN/010816
Attachment 3—Further advice
Advice to the Assessment Manager (SPA s287(6
1. Transport noise corridor:
Mandatory Part (MP) 4.4 of the Queensland Development Code (QDC) commenced on 1
September 2010 and applies to building work for the construction or renovation of a residential
building in a designated transport noise corridor. MP4.4 seeks to ensure that the habitable
rooms of Class 1, 2, 3 and 4 buildings located in a transport noise corridor are designed and
constructed to reduce transport noise. Transport noise corridor means land designated under
Chapter 8B of the Building Act 1975 as a transport noise corridor. A free online search tool can
be used to find out whether a property is located in a designated transport noise corridor. This
tool is available online at:
http://spp.dsdip.esriaustraliaonline.com.au/geoviewer/map/planmaking. This tool allows
searches on a registered lot number and/or property address to determine whether and how the
QDC applies to the land.
Further development permits, compliance permits or compliance certificates
2. Compliance contact details:
Pursuant to section 255D of the Sustainable Planning Act 2009, the Department of Transport
and Main Roads (TMR) has been nominated by the Chief Executive of the Department of
Infrastructure Local Government and Planning as the entity responsible for the administration
and enforcement of concurrence agency conditions within TMR’s area of interest.
The development must obtain a letter from TMR detailing satisfaction of compliance prior to
commencement of use or final inspection certificate or certificate of classification, whichever
occurs first.
The developer is advised an application for compliance assessment can be made to the
Development Assessment Team via [email protected] of the Department of
Transport and Main Roads (Please quote TMR16-018356).
3. Road access works approval: Under sections 62 and 33 of the Transport Infrastructure Act
1994, written approval is required from the Department of Transport and Main Roads to carry
out road works that are road access works (including driveways) on a state-controlled road.
Please contact the Department of Transport and Main Roads on [email protected] to
make an application for road works approval. This approval must be obtained prior to
commencing any works on the state-controlled road reserve. The approval process may require
the approval of engineering designs of the proposed works, certified by a Registered
Professional Engineer of Queensland (RPEQ). Please contact Transport and Main Roads as
soon as possible to ensure that gaining approval does not delay construction.
Page 25 of 81See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.